ページ1に含まれる内容の要旨
©2008 Pella Corporation Part Number: 80KM0103
INSTALLATION INSTRUCTIONS
HINGED PATIO DOOR - SOUTHWESTERN WALL WITH HARD COAT STUCCO
Installation Instructions for Typical Wood Frame Construction.
These instructions were developed and tested for use with typical wood frame wall construction in a wall system designed to manage water.
These instructions are not to be used with any other construction method. Installation instructions for use with other construction methods,
®
multiple units or bow
ページ2に含まれる内容の要旨
1 ROUGH OPENING PREPARATION A. Verify the opening is plumb and level. Note: It is critical that the bottom is level. B. Verify the door will fit the opening. width at the top, bottom, and center. Measure the height at the far left side, the far right side, and in the center. Note: 1-1/2" or more of solid wood blocking is required around the perimeter of the opening. Fix any problems with the rough opening before proceeding. C. Apply flashing paper at the bottom than the width of the
ページ3に含まれる内容の要旨
2 SETTING AND FASTENING THE DOOR A. Remove plastic wrap and cardboard packaging from door. DO NOT remove plastic Note: If screens, grilles or hardware are removed from the door at this time, label them and store them in a protected area. B. Fold out installation fin to 90°. Note: If the fin is not at 90°, the door will not line up correctly on the interior. C. Place three 3/8" beads of sealant. TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS.
ページ4に含まれる内容の要旨
Fasten the door to opening Note: Make sure the fin corner is lying as flat as possible. When using the optional fin at the sill, attach the aluminum sill support or wood blocking under the sill of the door before proceeding to Step H. Carefully open the door(s) and remove all shipping spacers. Note: Be sure to remove the spacers from the bottom edge of the door panel. Double doors with center latch: Designer Series Only: Use the construction handle to operate the active door loca
ページ5に含まれる内容の要旨
3 INTEGRATING THE DOOR TO THE BUILDING FELT Note: The flashing tape must be applied approximately 1/2" onto the frame cladding at the jambs and head. Pre-folding the tape at 1/2" before removing the paper backing will make it easier to apply the tape correctly. If the siding is less than 1/2" thick, adjust the dimension of the fold so the exterior sealant line will cover the exterior edge of the tape. A. Apply side flashing tape. B. Apply top flashing tape. Cut a piece
ページ6に含まれる内容の要旨
5 SEALING THE DOOR TO THE EXTERIOR WALL CLADDING Note: When applying the casing bead for stucco, leave 1/2" space between the head of the door and the casing bead, and 3/8" space between the door jambs and the casing bead for backer rod and sealant. Refer to the illustration (Southwestern Wall With Stucco). Note: The sealant details shown are standard recommendations from the sealant industry. Contact your sealant supplier for recommendations and instructions for this and any other ap
ページ7に含まれる内容の要旨
EXTERIOR FINISH ® spirits. DO NOT use abrasives. DO NOT scrape or use tools that might damage the surface. voids the Limited Warranty. CARE AND MAINTENANCE Pella retailer. This information is also available at www.pella.com. IMPORTANT NOTICE properly manage moisture. Pella Corporation is not responsible for claims or damages caused by anticipated and unanticipated water wall systems. The determination of the suitability o