Allard EB120 user manual

User manual for the device Allard EB120

Device: Allard EB120
Category: Boiler
Manufacturer: Allard
Size: 2.98 MB
Added : 5/25/2013
Number of pages: 12
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Allard EB120. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Allard EB120.

For your convenience

If looking through the Allard EB120 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Allard EB120 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Allard EB120 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Allard EB120 User manual - Online PDF
Advertisement
« Page 1 of 12 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Allard EB120 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Allard EB120. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

EB120
Advanced Ethanol Boiler

Allard Research and Development
Copyright © 2008 – Allard Research and Development, LLC. – All Rights Reserved

EB120 Advanced Ethanol Boiler 1

Summary of the content on the page No. 2

FOREWORD Thank you for purchasing the Allard Research and Development EB120 – Advanced Ethanol Boiler. Please take the time to read these instructions before you begin as they contain important information about the installation and maintenance requirements, as well as safety instructions. The EB120 is shipped with our intelligent remote control unit (the EB-A Controller), and a custom temperature probe. With this remote, not only can you control the temperature and time duration of you

Summary of the content on the page No. 3

Chapter One : Specifications Power Voltage Phase Current Dimensions Model (kw) (V) (N~) (A) ( W H) EB-120 12.0 230/400 1/3 52./17 20"×8.25"×19" 1. Parameters and dimensions of EB-A controller (chart 2) Model Timer Range Temperature Dimension(mm) Remarks (minutes) L*W*H EB-A 15-240 173 5.75"×3.5"× 1" When the time widow displays ”Long” the boiler will operate continuously until it is switched off. Chapter Two: The EB120 Advanced Ethanol Boiler. Parts description

Summary of the content on the page No. 4

6 Heat element Heat element 7 Proportional Solenoid Automatically controls the cooling water flow 8 Cooling Water Out Output that connects to the Still cooling water input 9 Cooling Water In Connections for the cooling water output 10 Power entry The rout of power wire 11 Control cable entry The tout of control cable 12 Accessorial circuit Connect and control the heat element board 13 terminal Connection for power supply 14 Earth wire plug Connection for earth wire 15 Drain valve Dra

Summary of the content on the page No. 5

3 Drain Control Operates Drain, and used to set Cooling Water Flow Rate 4 Set Preset Run Time and Distillation Control Temperature 5 Increase button 6 Decrease button 7 C/F & Enter Enter Key. Also change from Fahrenheit to Centigrade 8 Time display Displays the remaining time of the boiler operation 9 Temp display Displays the detected temperature of distillation column 10 L1 Beer Input pump operating 11 L2 Cooling water inlet in operation 12 L3 Indicator LED for draining green

Summary of the content on the page No. 6

Beer, Water, and Steam connections a. The water supply pipe and steam pipe should comply with local standards. b. Connect the cooling water inlet of the EB120 to the main water supply using a flexible hose with 3/4-inch fittings. Washing machine connection hoses are perfect for these connections, as they are made to withstand high pressure without bursting. We recommend braided stainless steel washing machine hoses, available at your local building supply store. c. Connect the Cooling

Summary of the content on the page No. 7

EB120 Temperature Probe Installations of power supply and control cables 1. Confirm the correct voltage of power supply and wires. 2. Remove the knock out for the power cable entry and use a rubber grommet to protect the cable, connect to the conductors to the correct terminals for single phase power supply use the copper bridge connectors, for 3 phase supply remove them. 3. Remove the knock out for the control cable entry and use a rubber grommet to protect the cable, conne

Summary of the content on the page No. 8

EB120 Circuit Board Chapter Four : Testing and operation (1) Once the installation has been completed and checked, turn on power and water supplies and carry out the following test. (2) On the control panel press the on/off key, (the key has a time-lapse function, press it for I second), the time and temp displays the data. (3) Turn on your valve(s) to allow beer to flow to the boiler. The indicator LED is red on the remote. The internal pump will begin filling the boiler with be

Summary of the content on the page No. 9

drain valve opens (drain indicator LED green). (9) You can also drain the boiler manually by pressing the drain key when the system has stopped heating. The drain indicator LED will indicate as red during this operation. (10) Once you have set the temperature required, the boiler will operate on all heating elements until the temperature is 4 degrees below the target temperature. Once the system is in full operation, the computer maintains the boiler temperature and it will selectively tur

Summary of the content on the page No. 10

The water flow control can be fine tuned to help tightly control the specific characteristics of your particular still, and can help regulate varying input water pressures. There are four different presets that can be chosen for use during operation. To change the water flow rate control, turn on the EB120, and press and release the Drain key on the remote. The Temperature Display will flash and show one of four pressure settings; 1PS, 2PS, 3PS, 4PS. Press the Drain key one or more ti

Summary of the content on the page No. 11

control panel is 1. Main circuit board * Change main circuit board normal, and 2. Relay circuit board * Change relay circuit board indicator LED for 3. Heating elements * Change heat elements heating is on, but there is no steam output Temperature Check: Check connection or change beer level probe. displays “LC” Beer level probe connection Temperature Beer level probe detects 1. Check beer level probe connection displays “HC” a short circuit 2. Check controller for short circuit

Summary of the content on the page No. 12

kettles from most hardware stores, brew supply stores, and are available online from Allard Research and Development. Follow the instructions supplied with the crystals and allow sufficient time for the solution to dissolve the scale before flushing out the boiler. System faults arising from a failure to descale the unit are not covered by warranty. Because heating and cooling cause expansion and contraction, it is important to inspect all the water and steam inlets and outlets as well


Alternative user manuals
# User manual Category Download
1 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
2 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
3 A.O. Smith 200 User manual Boiler 2
4 A.O. Smith 201 User manual Boiler 7
5 A.O. Smith 750 & 1000 User manual Boiler 6
6 A.O. Smith GB/GW-400 User manual Boiler 10
7 A.O. Smith DB/DW-720-1810 User manual Boiler 1
8 A.O. Smith DB-720 thru 1810 User manual Boiler 0
9 A.O. Smith GB/GW-650 User manual Boiler 3
10 A.O. Smith GB/GW-500 User manual Boiler 5
11 A.O. Smith GB/GW-200 User manual Boiler 2
12 A.O. Smith ACGSS02307 User manual Boiler 0
13 A.O. Smith 3400 User manual Boiler 0
14 A.O. Smith 1700 User manual Boiler 1
15 A.O. Smith 2000 User manual Boiler 3