Burnham SERIES 2 user manual

User manual for the device Burnham SERIES 2

Device: Burnham SERIES 2
Category: Boiler
Manufacturer: Burnham
Size: 2.82 MB
Added : 11/3/2014
Number of pages: 52
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Burnham SERIES 2. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Burnham SERIES 2.

For your convenience

If looking through the Burnham SERIES 2 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Burnham SERIES 2 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Burnham SERIES 2 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Burnham SERIES 2 User manual - Online PDF
Advertisement
« Page 1 of 52 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Burnham SERIES 2 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Burnham SERIES 2. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

Price - $3.00
INSTALLATION, OPERATING
AND
SERVICE INSTRUCTIONS
SERIES 2 (model B)
GAS BOILERS
For service or repairs to boiler, call your heating contractor. When seeking information on boiler,
provide Boiler Model Number and Serial Number as shown on Rating Label.
Boiler Model Number Boiler Serial Number Installation Date
2 ____-_______ 6_ _ _ _ _ _ _
Heating Contractor Phone Number
Address
Part No. 81417032R10-11/99

Summary of the content on the page No. 2

NOTE: The equipment shall be installed in accordance with those installation regulations in force in the area where the installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made. All wiring on boilers installed in the USA shall be made in accordance with the National Electrical Code and/or local regulations. All wiring on boilers installed in Canada shall be made in accordance with the Canadian Ele

Summary of the content on the page No. 3

Figure 1 Gas Approx. Dimensions [inches] Boiler Connection Water Recommended Shipping Model For Content Vent Size Weight Number Automatic [gallons] [1] [2] AB C D E F G (lb.) Gas Valve 202 18-3/4 10-3/4 6-3/8 4 45-5/8 8-1/2 10 [3] 1/2 2.5 3" dia. x 15 ft. 212 202X 20 12 6 4 45-5/8 8-1/2 4-3/4 1/2 3.2 4" dia. x 15 ft. 262 203 20 12 6 4 45-5/8 8-1/2 4-3/4 1/2 3.2 4" dia. x 15 ft. 262 204 23-1/4 15-1/4 7-5/8 5 47-1/8 9-1/8 4-3/4 1/2 4 5" dia. x 15 ft. 306 205 26-1/2 18-1/2 9-1/4 6 48-1/2 9-3/4 5-1/

Summary of the content on the page No. 4

SECTION I - INSTALLATION INSTRUCTIONS F. Slide the boiler forward or backward off the skid using 1. INSPECT SHIPMENT carefully for any signs of damage. the two wooden slats as runners. All equipment is carefully manufactured, inspected and packed. Our responsibility ceases upon delivery of Boiler to 6. Move boiler to permanent position. the carrier in good condition. Any claims for damage or 7. PROVIDE CLEARANCE and AIR for COMBUS- shortage in shipment must be filed immediately against the TION

Summary of the content on the page No. 5

B. PROVIDE COMBUSTION AND VENTILATION AIR in per 4,000 Btu per hour input of all equipment in accordance with applicable provisions of local building space. Duct cross-sectional area shall be same as codes, or: U.S.A. - National Fuel Gas Code, NFPA 54/ opening free area. ANSI Z223.1, Section 5.3, Air for Combustion and iii.Horizontal ducts. Minimum free area of 1 square Ventilation; Canada - Natural Gas Installation Code, inch per 2,000 Btu per hour input of all equipment in CAN/CGA-B149.1, or

Summary of the content on the page No. 6

entering the boiler, see Figure 4. Also consult I=B=R 9. BOILER PIPING Installation and Piping Guides. If this Boiler is connected to heating coils located in CAUTION air handling units where they may be exposed to Failure to properly pipe boiler may result in refrigerated air, the boiler piping must be equipped with flow control valves to prevent gravity circulation improper operation and damage to boiler or of boiler water during the operation of the cooling building. system. H. Use a boiler

Summary of the content on the page No. 7

Table 2: Equivalent Length of Fittings Table 3: Specific Gravity Correction Factors Specific Correction Specific Correction Nominal Pipe Size Fitting Gravity Factor Gravity Factor ½¾ 1 1¼ 0.50 1.10 1.30 1.07 45° Ell 0.7 1 1.2 1.6 0.55 1.04 1.40 1.04 90° Ell 1.6 2.1 2.6 3.5 0.60 1.00 1.50 1.00 Tee (As Elbow) 3.1 4.1 5.2 6.9 0.65 0.96 1.6 0.97 covered by Burnham's standard warranty. 0.70.931.7 0.94 There are many possible causes of oxygen contamina- 0.75 0.9 tion such as: 1.Addition of excessive m

Summary of the content on the page No. 8

Figure 4: Recommended Piping for Combination Heating & Cooling (Refrigeration) Systems the jacket side panel to secure the power cord to the jacket. H. Be sure the power cord, mounting bracket, and switch are secure and located as shown in Figure 6. WARNING Failure to properly install and use this Blocked Vent Switch may result in property Figure 6 damage, personal injury or loss of life. A. The vent damper should be the same size as the outlet of the Draft Hood. (See Figure 1) Unpack the dampe

Summary of the content on the page No. 9

E. Continuous Ignition (Standing Pilot) Only. Remove installed above the bottom of chimney to prevent knockout from vent damper blade. blockage. F. Size 202 Only. Install 4" x 3" reducing fitting on vent G. Vent pipe should slope upward from draft hood to damper outlet (or draft hood outlet for Canadian boiler chimney not less than one inch in four feet. No portion not equipped with vent damper). of vent pipe should run downward or have dips or sags. Vent pipe must be securely supported. H. Ve

Summary of the content on the page No. 10

Figure 7: Plug-in Damper Installation 10

Summary of the content on the page No. 11

54/ANSI Z223.1. 16. INSTALL ELECTRIC WIRING in accordance with National Electric Code or the Canadian Electrical Code and 15. INSTALL A ROOM THERMOSTAT on an inside wall local regulations. See Figures 11 through 14 for applicable about four feet above floor. Never install thermostat on an wiring diagram. A separate Electrical Circuit should be run outside wall or where it will be influenced by drafts, hot or cold from meter with a Fused Disconnect Switch in this Circuit. water pipes, lighting fi

Summary of the content on the page No. 12

is deenergized - closing contacts which energize the A. The Vent Damper is continuously powered at Terminal damper motor. This causes the damper to close. When 1. the damper blade reaches the fully closed position, the B. When there is a call for heat, the damper relay coil is damper motor is de-energized. energized through Terminal 5 if all limits ahead of the damper are satisfied. POWER FAILURE - The damper blade will stop in the C. The relay coil closes contacts which energize the position it

Summary of the content on the page No. 13

Figure 11: Wiring Diagram, 24 Volt Standing Pilot and Intermittent Circulation SEQUENCE OF OPERATION 2. Blocked Vent Switch In the event excessive blockage in the vent system is NORMAL OPERATION developed the blocked vent switch will open interrupt- 1. When the thermostat call for heat, the vent damper ing power to the gas valve. The main burners will be will open (see paragraphs 17A through 17D). The extinguished immediately, the circulator will continue circulator is started through a relay an

Summary of the content on the page No. 14

Figure 12: Wiring Diagram, Intermittent Ignition and Intermittent Circulation 14

Summary of the content on the page No. 15

SEQUENCE OF OPERATION developed the blocked vent switch will open interrupt- ing power to the VENT DAMPER and GAS VALVE. NORMAL OPERATION Main burners and pilot burner will be extinguished immediately, the VENT DAMPER will close and the 1. When the THERMOSTAT calls for heat, the RELAY CIRCULATOR will continue to operate. The source is energized. The CIRCULATOR starts and the of blockage must be corrected by trained and skilled VENT DAMPER is opened (see Paragraphs 17A personnel from a qualifie

Summary of the content on the page No. 16

Figure 13: Wiring Diagram, Intermittent Ignition and Continuous or Gravity Circulation 16

Summary of the content on the page No. 17

SEQUENCE OF OPERATION 2. Blocked Vent Switch In the event excessive blockage in the vent system is NORMAL OPERATION developed the blocked vent switch will open interrupt- 1. When THERMOSTAT calls for heat, the VENT ing power to the ignition module and dual combina- DAMPER is opened (see Paragraphs 17A through tion gas valve. Main burners and pilot burner will be 17D). When the damper blade reaches the fully open extinguished immediately and the vent damper will position, the GAS VALVE powers th

Summary of the content on the page No. 18

Figure 14: Wiring Diagram, 24 Volt Standing Pilot with Continuous or Gravity Circulation SEQUENCE OF OPERATION 2. Blocked Vent Switch In the event excessive blockage in the vent system is NORMAL OPERATION developed the blocked vent switch will open interrupt- ing power to the gas valve. The main burners will be 1. When the thermostat call for heat, the vent damper extinguished immediately and the vent damper will will open (see paragraphs 17A through 17D). The gas remain open until the thermosta

Summary of the content on the page No. 19

Figure 15: Wiring Schematic, Zone Valves Figure 16: Wiring Schematic, Zone Circulators 19

Summary of the content on the page No. 20

SECTION II - OPERATING INSTRUCTIONS Safe lighting and other performance criteria were met with the gas manifold and control assembly provided on the boiler when the boiler underwent tests specified in American National Standard for Gas-Fired Low-Pressure Steam and Hot Water Boilers, ANSI Z21.13b-1994. 1. MAIN BURNER CHECK - Check main burners to see that they were not dislodged during shipment. Rear of burners should be in the slots in the rear of burner tray and the front of the burners should


Alternative user manuals
# User manual Category Download
1 Burnham ALP105 User manual Boiler 15
2 Burnham 81433101R16-1/10 User manual Boiler 1
3 Burnham 8H User manual Boiler 14
4 Burnham ALP080 User manual Boiler 2
5 Burnham ALP150 User manual Boiler 3
6 Burnham ALPINETM 101603-01R2-12/09 User manual Boiler 2
7 Burnham ALP399 User manual Boiler 0
8 Burnham S User manual Boiler 18
9 Burnham Carefree DOE User manual Boiler 4
10 Burnham ALP210 User manual Boiler 57
11 Burnham CHG225 User manual Boiler 1
12 Burnham ALP285 User manual Boiler 3
13 Burnham CHG150 User manual Boiler 3
14 Burnham Condensing Stainless Steel User manual Boiler 4
15 Burnham Gas-Fired User manual Boiler 1
16 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
17 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
18 A.O. Smith 200 User manual Boiler 2
19 A.O. Smith 201 User manual Boiler 7
20 A.O. Smith 750 & 1000 User manual Boiler 6