PB Heat ECT Series user manual

User manual for the device PB Heat ECT Series

Device: PB Heat ECT Series
Category: Boiler
Manufacturer: PB Heat
Size: 0.75 MB
Added : 9/18/2013
Number of pages: 27
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for PB Heat ECT Series. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with PB Heat ECT Series.

For your convenience

If looking through the PB Heat ECT Series user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual PB Heat ECT Series on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual PB Heat ECT Series to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
PB Heat ECT Series User manual - Online PDF
Advertisement
« Page 1 of 27 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual PB Heat ECT Series but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to PB Heat ECT Series. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

Series EC/ECT
Oil Boilers
®
As an ENERGY STAR Partner, PB Heat, LLC has determined that certain firing
®
rates of this product meet the ENERGY STAR guidelines for energy efficiency.
Installation,
Operation &
Maintenance
Manual

Summary of the content on the page No. 2

TABLE OF CONTENTS TABLE OF CONTENTS USING THIS MANUAL 1 4. ELECTRICAL 10 A. INSTALLATION CLEARANCE . . . . . . . . . . . . .1 A. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . .10 B. SPECIAL ATTENTION BOXES . . . . . . . . . . . .1 B. BURNER WIRING . . . . . . . . . . . . . . . . . . . . .10 1. PREINSTALLATION 2 5. BURNER SETUP & BOILER OPERATION 14 A. CLEARANCES . . . . . . . . . . . . . . . . . . . . . . . .2 A. BURNER INSTALLATION . . . . . . . . . . . . . . .14 B. AIR FOR COMBUS

Summary of the content on the page No. 3

USING THIS MANUAL USING THIS MANUAL Indicates a condition or hazard which DANGER A. INSTALLATION CLEARANCE will cause severe personal injury, death or major property damage. Follow the installation instructions provided in this manual in the order shown. The order of these Indicates a condition or hazard which instructions has been set in order to provide the installer WARNING may cause severe personal injury, with a logical sequence of steps that will minimize death or major property damage. po

Summary of the content on the page No. 4

PREINSTALLATION 1. PREINSTALLATION Read carefully, study these instructions before beginning work. It will save time. Study the included drawings. Save these instructions for reference. This boiler must be installed by a qualified contractor. The boiler warranty can be voided if the boiler is not installed, maintained and serviced correctly. The equipment shall be installed in accordance with those installation regulations in force in the NOTICE local area where the installation is to be made, i

Summary of the content on the page No. 5

PREINSTALLATION For Example: C. CHIMNEY / VENT AND DRAFT CONTROL Old New An oil-fired unit shall be connected Comments Installation Installation CAUTION to a flue having sufficient draft at all times, to assure safe proper No change, but older operation of the unit. Chimney chimneys (especially unlined -.04" -.04" Draft ones) have leaks which 1. Draft Requirement – Minimum draft required in the reduce draft. vent system is -.03" to -.05" W.C. depending on Boiler boiler model, see Table 7.1 (Sect

Summary of the content on the page No. 6

BOILER PLACEMENT AND ASSEMBLY 2. BOILER PLACEMENT AND ASSEMBLY Be sure rubber gasket is in place A. SETTING THE BOILER NOTICE between cover plate or water heater plate and boiler section. 1. Provide a level foundation, located as close as possible to the center of the heating system. E. JACKET ASSEMBLY 2. Refer to Figure 2.2 for exploded view of boiler while 1. Refer to Figure 2.2 for exploded view. checking and/or assembling parts of the boiler. 2. Attach the back panel (Item 19) to bosses on m

Summary of the content on the page No. 7

BOILER PLACEMENT AND ASSEMBLY Figure 2.2: Boiler Exploded View (See Table 8.1 in Section 8 for parts identification). 5

Summary of the content on the page No. 8

PIPING AND CONTROLS 3. PIPING AND CONTROLS Do not pipe boiler before jacket is NOTICE installed. EQUALIZER A. PRESSURE TEST BLOCK ASSEMBLY 1. Make up cold water supply connection to the boiler. 2. Install pressure gauge or pressure-temperature gauge in tapping provided. See Boiler Dimensional drawing, Figure 7.1 (Section 7). FRONT REAR 3. Plug all open tappings in the boiler and fill with water. Apply approximately thirty (30) psig pressure. Figure 3.1: Steam Boiler Piping, EC-03 Check to make c

Summary of the content on the page No. 9

PIPING AND CONTROLS D. WATER BOILER PIPING 1. Refer to the Water Installation Survey and Hydronics Institute Residential Hydronic Heating Installation/Design Guide for Guidance. 2. The supply and return connections should be sized to suit the system. 3. Pipe the supply and return in one of two ways as shown in Figure 3.3: a. Pipe the supply from the top of the rear section and return to the bottom of the front section. Use the 3/4" tapping in the top of the back section for air elimination. b. A

Summary of the content on the page No. 10

PIPING AND CONTROLS 2. If not using a tankless coil, cover the heater opening E. TANKLESS HEATER OR COVERPLATE with cover plate (item 12 or 16). 1. If a tankless coil is used (item 13 or 17), install as pictured. On water boilers, install in opening in front Be sure rubber gasket is in place NOTICE section. On steam boilers, install in opening in rear between cover plate or water heater section. For suggested piping of tankless water plate and boiler section. heaters refer to Figures 3.6 and 3.7

Summary of the content on the page No. 11

PIPING AND CONTROLS Use these components along with the gauge glass F. CONTROLS handles and other components from the Steam Trim Carton and install fittings and controls per Figure 3.10. Pipe the discharge of the safety CAUTION valve or relief valve to prevent injury The shorter gauge glass located in the Steam Trim in the event of pressure relief. Pipe Carton is not necessary for the probe application. the discharge to a drain. Provide piping that is the same size as the 4. Steam boilers subje

Summary of the content on the page No. 12

ELECTRICAL 4. ELECTRICAL 3. Install burner harness located in the burner carton. A. GENERAL Beckett or Carlin – EC7022 Harness All electrical wiring shall be done in accordance with the (21" conduit) National Electrical Code and Local Requirements. Single Riello – EC7023 Harness (28" conduit) pole switches including those of safety controls or protective devices shall not be wired in a grounded line. 4. For complete information on servicing and adjustment of controls, refer to the attached cont

Summary of the content on the page No. 13

ELECTRICAL Figure 4.2: Steam Boiler with Float Low Water Cut-Off Figure 4.3: Steam Boiler with Probe Low Water Cut-Off 11

Summary of the content on the page No. 14

ELECTRICAL Figure 4.4: Water Boilers Figure 4.5: Zoning with Circulators 12

Summary of the content on the page No. 15

ELECTRICAL Figure 4.6: Zoning with Zone Valves Figure 4.7: Partner with Circulator 13

Summary of the content on the page No. 16

BURNER SETUP & BOILER OPERATION 5. BURNER SETUP & BOILER OPERATION Burn only #2 Fuel Oil in this 2. Adjust burner and barometric draft control for CAUTION appliance. Do not use gasoline, highest CO (Maximum 13% [EC-03 - EC-05] or ² crankcase drainings or any oil 12-1/2% [EC-06]) while maintaining a 0 Smoke and containing gasoline. -.01 to -.02" W.C. draft overfire. A. BURNER INSTALLATION All adjustments must be made using suitable instruments such as found in a Bacharach 1. The oil burner is su

Summary of the content on the page No. 17

BURNER SETUP & BOILER OPERATION Do not leave boiler unattended while CAUTION E. CLEAN THE BOILER firing burner. Operating boiler with (STEAM BOILERS ONLY) water below minimum permissible water level may fracture sections. 1. Clean the boiler within one week after initial start-up. Cleaning will be more effective if boiler operates a 7. Turn on burner. Allow boiler water to heat up to just day or two to loosen sediment and impurities in below steaming (180 - 200°F). Do not allow boiler to system.

Summary of the content on the page No. 18

BURNER SETUP & BOILER OPERATION Table 5.1: Carlin Burner Specifications CARLIN BURNER SPECIFICATIONS Boiler Burner Air Pump Start-up Settings Firing Rate Nozzle Size Head Bar Model No. Model No. Shutter Pressure Air Band EC/ECT-03-075 .75 EZ-1HP Blank 0.60 70° B DEL³ 150 psig 0.55 0.60 - 0.65 EC/ECT-03-100 1.00 EZ-1HP Blank 0.85 70° A DEL 150 psig 0.65 0.85 - 1.00 EC/ECT-03-120 1.20 EZ-1HP Blank 1.00 70° A DEL³ 150 psig 0.80 0.85 - 1.00 Start-up Settings Boiler Burner Air Pump Nozzle Size Model

Summary of the content on the page No. 19

MAINTENANCE 6. MAINTENANCE WARNING Product Safety Information Refractory Ceramic Fiber Product This appliance contains materials made from refractory ceramic fibers (RCF). Airborne RCF, when inhaled, have been classified by the International Agency for Research on Cancer (IARC), as a possible carcinogen to humans. After the RCF materials have been exposed to temperatures above 1800°F, they can change into crystalline silica, which has been classified by the IARC as carcinogenic to humans. If par

Summary of the content on the page No. 20

MAINTENANCE A. GENERAL C. WEEKLY MAINTENANCE (WITH BOILER OPERATING) 1. Check pipes adjacent to cold walls or in unheated spaces. Insulate and tape them if necessary to be 1. Flush float-type low-water cut-off (if used) to remove sure they can't freeze up. Keeping the water moving sediment from the float bowl as stated in the at all times will reduce the likelihood of freezing. manufacturer's instructions. 2. If there is considerable foreign matter in the boiler D. MAINTENANCE OF SAFETY RELIEF w


Alternative user manuals
# User manual Category Download
1 PB Heat EC Series User manual Boiler 0
2 PB Heat DE User manual Boiler 1
3 PB Heat MI User manual Boiler 0
4 PB Heat Gas/Oil s User manual Boiler 1
5 PB Heat WBV Series User manual Boiler 1
6 PB Heat Gas User manual Boiler 3
7 PB Heat MI/MIH series User manual Boiler 0
8 PB Heat MIH User manual Boiler 0
9 PB Heat WV Series User manual Boiler 0
10 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
11 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
12 A.O. Smith 200 User manual Boiler 2
13 A.O. Smith 201 User manual Boiler 7
14 A.O. Smith 750 & 1000 User manual Boiler 6
15 A.O. Smith GB/GW-400 User manual Boiler 10