ملخص المحتوى في الصفحة رقم 1 
                    
                        Residential Wood BuRning FiReplace
oWneR’s opeRation and installation Manual
F48H(i)(R), VF48H(i)(R) 
and W cM-48F 
plantation
48" Wood BR u ning 
O-TL REPORT #114-F-23-2
FiReplace  
WitH HeRRingBone 
MasonR y BRick
IF FIREPLACE IS TO BE INSTALLED DIRECTLY ON 
ANY COMBUSTIBLE MATERIAL, A HEARTH SPACER 
IS REQUIRED.
SAVE THIS BOOK
This book is valuable. In addition to instructing you 
on how to install and maintain your appliance, it also 
contains information that will enable you to obtain re-
p
                    
                    ملخص المحتوى في الصفحة رقم 2 
                    
                         WARNING: Improper installation, adjustment, altera- tion, service or maintenance can cause injury, property  damage or loss of life. Refer to this manual for assis- tance or additional information. Consult a qualified  installer or local distributor. t aBle oF contents Safety .................................................................. 2 Operation and Maintenance .............................. 16 Specifications ...................................................... 3 Technical Service....
                    
                    ملخص المحتوى في الصفحة رقم 3 
                    
                        saFety Continued  WARNING: Always leave glass  WARNING: If fireplace is  to be installed on combustible  doors fully opened or fully closed  material, a Hearth Spacer must  when operating fireplace. be used. See Replacement and  Accessory Parts on page 18. speciFications MODELS F48H(I)(R) AND VF48H(I)(R) SQUARE  ROUND TOP  CHASE-TOP TERMINATION TERMINATION No Combustible 2" Chimney Airspace Material on Front Clearance to Combustible Face Except for Material Mantel Applications 1.5" Airspace Back
                    
                    ملخص المحتوى في الصفحة رقم 4 
                    
                        installation on a hearth spacer designed for use with  SELECTING FIREPLACE LOCATION this fireplace (see Replacement and Ac- To determine the safest and most efficient  cessory Parts, page 18).  location for the fireplace, you must take into  consideration the following guidelines: 3. Set the fireplace directly in front of this  opening and slide the unit back until the  1. The location must allow for proper clear- nailing flanges touch the side framing. ances (see Figures 1 and 2). 4. Check the 
                    
                    ملخص المحتوى في الصفحة رقم 5 
                    
                        installation Continued HEARTH ExTENSION MANTELS A hearth extension projecting a minimum of A mantel may be installed if desired (see  20" in front of and a minimum of 12" beyond Figure 4). Woodwork such as wood trims,  each side of the fireplace opening is required mantels or any other combustible material  to protect combustible floor construction projecting from the front face must not be  in front of the fireplace. Fabricate a hearth placed within 12" of the fireplace opening.  extension usin
                    
                    ملخص المحتوى في الصفحة رقم 6 
                    
                        installation Continued LINEAL GAIN PART NO. DESCRIPTION GAIN (IN)  CAUTION: Combustion air  1 48" Plantation Fireplace 66 / " 2 inlet ducts shall not terminate  12-12DM 5 in attic space. Pipe Section 10 /8" 12-12HT 18-12DM 5 Pipe Section 16 / " 8 The maximum height for the 18-12HT 24-12DM 5 air vent can not exceed 3 feet  Pipe Section 23 / " 8 24-12HT below the flue gas outlet of the  36-12DM 5 Pipe Section 34 /8" termination. 36-12HT 48-12DM 5 Pipe Section 46 / " 8 Secure to Collars with Metal 
                    
                    ملخص المحتوى في الصفحة رقم 7 
                    
                        installation Continued 2. Chimney weight above offset rests on re- USING ELBOW OFFSETS (30E-12DM) turn elbow. Straps must be securely nailed  1. To achieve desired offset, you may install  to rafters or joists (see Figure 8, details A  combinations of 12", 18", 24", 36" and 48"  and B). length of double wall pipe (see offset chart  and Figure 7). 3. Maximum length of pipe between supports  (return elbow or 12S-12DM) is 6' of angle  OFFSET RISE CHIMNEY LENGTH run. Maximum of two 6' angle run sect
                    
                    ملخص المحتوى في الصفحة رقم 8 
                    
                        installation Continued PENETRATING ROOF To maintain a 2" clearance to pipe on roof with  a pitch, a rectangular opening must be cut. 1. Determine center point through which pipe  Screws will penetrate roof. B 2. Determine center point of roof. Pitch is  the distance the roof drops over a given  span, usually 12".  3. Use roof opening chart (Figure 12) to  determine correct opening length and  flashing required. A 4. Remove shingles around opening mea- Figure 9 - Elbow Offset sured. Cut out this 
                    
                    ملخص المحتوى في الصفحة رقم 9 
                    
                        installation Continued Terminations/Spark Arrestor FLASHING INSTALLATION (V6F-10DM  Fireplace system must be terminated with  OR V12F-10DM) listed round top or chase terminations. In any  Determine flashing to be used with roof open- case, refer to installation instructions supplied  ing chart. Slide flashing over pipe until base is  with termination. flat against roof. Replace as many shingles as  needed to cover exposed area and flashing   CAUTION: Do not seal open- base. Secure in position by
                    
                    ملخص المحتوى في الصفحة رقم 10 
                    
                        installation Continued OPTIONAL GAS LINE  INSTALLATION Gas line hook up should be done by your sup- plier or a qualified service person.  Note: Before you proceed, make sure your gas  supply is turned off. Use only a 1/2" black iron  18"  pipe and appropriate fittings. Min. 1. Remove gas line cover plate located on  Typ. either side of fireplace and pull out insula- tion from gas line conduit sleeve. Save  24" Min. insulation for reuse. Replace screws. 2. Run a 1/2" black iron gas line into fire
                    
                    ملخص المحتوى في الصفحة رقم 11 
                    
                        installation Continued BRICK INSTALLATION  CAUTION: All gas piping  IMPORTANT: Installation of brick  and connections must be tested  should be done after the fire- for leaks after the installation  place is placed in a permanent  is completed. After ensuring  that the gas valve is on, apply location. soap and water solution to all  Each brick housing is stamped with a number  connections and joints. Bubbles  (full size bricks are not stamped). These num- forming show a leak. Correct  bers will 
                    
                    ملخص المحتوى في الصفحة رقم 12 
                    
                        S017 S014 S014 S014 S014 S020 FULL S020 FULL S020 FULL S020 S014 FULL FULL FULL FULL FULL FULL S005 S002 FULL S002 FULL S014 S002 FULL S002 FULL S008 S005 FULL FULL FULL FULL FULL FULL S002 FULL S006 FULL FULL FULL FULL FULL FULL S006 FULL FULL S023 FULL S019 S019 S019 S034 FULL FULL FULL S032 FULL S020 FULL S020 FULL S020 FULL S020 FULL S020 FULL S020 FULL S020 FULL S020 S006 S020 S020 S020 installation  Continued HERRINGBONE BRICK INSTALLATION F054 F054 F054 S011 Rear Upper  Refractory S018 S0
                    
                    ملخص المحتوى في الصفحة رقم 13 
                    
                        installation  Continued REAR UPPER REFRACTORY REAR LOWER REFRACTORY RED IVORY QTY RED IVORY QTY FULL FULL FULL FULL  (112140-02) (112140-06) 24 (112140-02) (112140-06) 10 F054R F054W 3 F055R F055W 3 S002R S002W 1 S001R S001W 2 S005R S005W 2 S002R S002W 8 S006R S006W 2 S003R S003W 2 S007R S007W 3 S004R S004W 2 S008R S008W 1 S005R S005W 2 S011R S011W 1 S006R S006W 2 S013R S013W 1 S008R S008W 1 S014R S014W 8 S010R S010W 1 S015R S015W 2 S011R S011W 1 S016R S016W 2 S022R S022W 1 S017R S017W 1 S018R S
                    
                    ملخص المحتوى في الصفحة رقم 14 
                    
                        installation  Continued 8. Using a joint striker, force grout mixture  GROUTING INSTRUCTIONS into joint and sweep back and forth  Material provided: until grout is smooth and round. If grout  1 or 2 - 10 lb. bags of cement (depending  becomes too shallow, add more grout  on model) mixture with piping bag and strike again. 1 or 2 - 10 lb. bags of sand (depending  9. Continue procedure around each group of  on model) 6 bricks until an entire panel is finished. Material required: 10. Using trowel, 
                    
                    ملخص المحتوى في الصفحة رقم 15 
                    
                        installation Continued Screen  Top Rail Fireplace Front Rod  Remove Screws  Bracket then Replace to  Smoke Shelf Secure Top Rail Push  On Nut Screen  Rod Ring Screen Bottom Rail  (Use as a  Template before  Drilling) Figure 21 - Installing Fireplace Screen Drill Holes  Concrete  into Bricks Screws INSTALLING GLASS DOOR AND  Figure 22 - Securing Door Rails to  RAIL Fireplace IMPORTANT: Install top and bot- tom rails and hardware before  Top Rail installing glass door panels. IMPORTANT: This optio
                    
                    ملخص المحتوى في الصفحة رقم 16 
                    
                        installation Continued Installing Glass Doors 2. Repeat step 1 for remaining door. After spring clips have been installed some  If you find the doors do not close properly or  adjustments may be needed. Install the doors  do not appear level or straight, proceed with  using the following steps: section on door adjustment. 1. With bi-fold doors completely folded, insert  DOOR ADjUSTMENT bottom pivot pin into bottom retaining clip  Remove doors and slightly loosen upper spring  located at far left
                    
                    ملخص المحتوى في الصفحة رقم 17 
                    
                        opeRation and Maintenance Continued IMPORTANT: The glass must be allowed to  warm slowly and evenly. Such materials as  CAUTION: When operating  pitch/wax laden logs, very dry mill end lumber  damper door, please be aware of  and large amounts of paper or cardboard  sharp edges and corners. Open  boxes can create an excessively hot fire and  and close damper door slowly to  should not be burned in this fireplace. Always  avoid injury. keep the fire well back from the doors and  never allow flame
                    
                    ملخص المحتوى في الصفحة رقم 18 
                    
                        tecHnical seRVice You may have further questions about installa- You can also visit DESA Heating, LLC’s web  tion, operation, or troubleshooting. If so, con- site at www.desatech.com. tact DESA Heating, LLC at 1-866-672-6040.  When calling please have your model and  serial numbers of your heater ready. ReplaceMent and a ccessoR y p aRts OPTIONAL OUTSIDE AIR KIT FOR  FLOOR INSTALLATION - AK4F BI-FOLD GLASS MASONRY DOOR BDMO48E - 48" Ebony BDMO48G - 48" Pewter BDMO48C - 48" Oiled Bronze OPTIONAL 
                    
                    ملخص المحتوى في الصفحة رقم 19 
                    
                        ReplaceMent and a ccessoR y p aRts Continued SQUARE CHASE-TOP  TERMINATION - STL-12D OPTIONAL HEARTH SPACER  HS48 ROUND TOP TERMINATIONS  RLT-12D AND RLT-12HT 24" ROUND WOODNOOK - DHR-24 OPTIONAL ASH LIP KIT (BRICKS)  AL48 - Red Brick AL48I - Ivory Brick SCREEN - 118115-01 ROD - 110146-02 PUSH-ON NUT - 11418 122272-01C www.desatech.com 19                                                                                                                                                                
                    
                    ملخص المحتوى في الصفحة رقم 20 
                    
                        DESA Heating, LLC 2701 Industrial Drive Bowling Green, KY 42101 www.desatech.com 1-866-672-6040 122272-01 Rev. C 122272 01 09/08 NOT A UPC