Resumen del contenido incluido en la página 1 
                    
                        INSTALLATION, OPERATING AND
SERVICE INSTRUCTIONS FOR
SCG™
GAS - FIRED BOILER
®
  As an ENERGY STAR Partner, Burnham Hydronics has determined that the SCG meets the ENERGY
®
  STAR guidelines for energy efficiency established by the United States Environmental Protection Agency (EPA).
For service or repairs to boiler, call your heating contractor. When seeking information on
boiler, provide Boiler Model Number and Serial Number as shown on Rating Label.
Boiler Model Number Boiler Serial Number In
                    
                    Resumen del contenido incluido en la página 2 
                    
                        IMPORTANT  INFORMATION - READ CAREFULLY NOTE:  The equipment shall be installed in accordance with those installation regulations enforced in the area where the          installation is to be made.  These regulations shall be carefully followed in all cases.  Authorities having jurisdiction     shall be consulted before installations are made. All wiring on boilers installed in the USA shall be made in accordance with the National Electrical Code and/or local regulations. All wiring on boilers i
                    
                    Resumen del contenido incluido en la página 3 
                    
                        WARNING This boiler requires regular maintenance and service to operate safely.  Follow the instructions contained  in this manual. Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal  injury or loss of life.  Read and understand the entire manual before attempting installation, start-up  operation, or service. Installation and service must be performed only by an experienced, skilled, and  knowledgeable installer or service agency. This boil
                    
                    Resumen del contenido incluido en la página 4 
                    
                        Table of Contents 	 I.	 Pre-Installation 	 ............................... 6 	 VI.	 Electrical 	 ....................................... 53 	 II.	 Unpack	Boiler 	 ................................ 7 	 VII.	 Modular	Installation 	....................62 	 III.	 Venting/Air	Intake	Piping 	 .............. 8 	 VIII.	 System	Start-up 	 ............................ 64 	 IV.	 Water	Piping	and Trim 	 	 ................. 45 	 IX.	 Service 	 .......................................... 71 	 V.	 Gas	Piping 	 .
                    
                    Resumen del contenido incluido en la página 5 
                    
                        5 Figure : Dimensions                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              
                    
                    Resumen del contenido incluido en la página 6 
                    
                        I.  Pre-Installation F. Provide combustion and ventilation air in accordance  WARNING with applicable provisions of local building codes,  or:  USA - National Fuel Gas Code, NFPA 54/ANSI  If you do not follow these instructions exactly,  Z223.1, Air for Combustion and Ventilation;  a fire or explosion may result causing property   Canada - Natural Gas or Propane Installation Code,  damage or personal injury. CAN/CSA-B149.1. WARNING DANGER Adequate combustion and ventilation air must  Do not inst
                    
                    Resumen del contenido incluido en la página 7 
                    
                        c. Horizontal ducts. Minimum free area of one (1)  NOTICE square inch per 2,000 Btu per hour input of all  equipment in space. Duct cross-sectional area  Boilers operated with direct vent (sealed  shall be same as opening free area. combustion) are exempt from needing provisions   Alternate method for boiler located within  for combustion air from the room, provided  confined space. Use indoor air if two permanent  air intake piping is installed per Code and the  openings communicate directly wi
                    
                    Resumen del contenido incluido en la página 8 
                    
                        III.  Venting / Air Intake Piping WARNING Do not use this boiler with galvanized, Type 04 or Type 1 stainless steel, non metallic or any other  ® non Al9-4C based vent systems. Do not use a barometric damper or drafthood with this appliance. Do not use vent dampers with this boiler. Moisture and ice may form on surfaces around termination.  To prevent deterioration, surfaces should  be in good repair (sealed, painted, etc.). This appliance needs fresh air for safe operation and must be insta
                    
                    Resumen del contenido incluido en la página 9 
                    
                        TABlE :  VENT SySTEM COMPONENTS INClUDED WITh BOIlER Vent System Components Part Number Gasketed Vent Terminal 3” Horizontal  8110701 (SCG-3 thru SCG-7) Gasketed Vent Terminal 4” Horizontal  8110702 (SCG-8 & SCG 9) Disc Air Intake - 3” 6116045 (SCG-3 & SCG-4) Disc Air Intake - 4” 6116044 (SCG-5 & SCG-6) Air Intake - 5” 6116063 (SCG-7 thru SCG-9) TABlE :  BURNhAM VENT SySTEM AND AIR INTAkE SySTEM COMPONENTS Equivalent  Vent System Component Part Number Feet of Pipe 3” Dia. Pipe x 1 Ft 8116296U 
                    
                    Resumen del contenido incluido en la página 10 
                    
                        A. Vent Guidelines Due to Removal of an Existing B. General Guidelines Boiler  1. Vent system installation must be in accordance   For installations not involving the replacement of an  with National Fuel Gas Code, NFPA 54/ANSI  existing boiler, proceed to Step B. Z221.3 or applicable provisions of local building  codes.  Contact local building or fire officials about   When an existing boiler is removed from a common  restrictions and installation inspection in your area. venting system, the co
                    
                    Resumen del contenido incluido en la página 11 
                    
                        11. Plan venting system to avoid possible contact with  with at least one side open, similar to a joist bay  plumbing or electrical wires.  Start at vent connector  application.  Use double wall thimble [Burnham  on top of boiler and work towards vent terminal. Part No. 8116115 (3”), 100185-01 (4”)] when  penetrating a combustible wall.   12.  Once a vent pipe manufacturer and system is chosen  never mix and match vent systems. 9. Do not install venting system components on  the exterior of the 
                    
                    Resumen del contenido incluido en la página 12 
                    
                        a. Wipe the male end of each joint using an alcohol Air Intake piping - See Figures 4A, 4B, 5A and 5B.  pad to remove any dirt and grease. 8. Locate air intake termination on the same wall as  b. Align weld seams in pipes and use a slight the vent termination if possible, to prevent nuisance  twisting motion to FULLY insert male end into boiler shutdowns.  However, boiler may be installed  female end of joint.  Ensure bead in male end with vertical venting and sidewall combustion air  of pipe is
                    
                    Resumen del contenido incluido en la página 13 
                    
                        1 Figure 4A:  Recommended Separate horizontal –  Vent/Air Intake Installation                                                                                                                                                                                                                                                                                                                                                                                                                                      
                    
                    Resumen del contenido incluido en la página 14 
                    
                        14 Figure 4B:  Alternate Separate horizontal –  Vent/Air Intake Installation                                                                                                                                                                                                                                                                                                                                                                                                                                        
                    
                    Resumen del contenido incluido en la página 15 
                    
                        15 Figure 5A:  Separate Horizontal –  Vent/Air Intake Terminal Configuration (SCG-3 thru 7)                                                                                                                                                                                                                                                                                                                                                                                                                         
                    
                    Resumen del contenido incluido en la página 16 
                    
                        1 Figure 5B:  Separate Horizontal –  Vent/Air Intake Terminal Configuration (SCG-8 and 9)                                                                                                                                                                                                                                                                                                                                                                                                                          
                    
                    Resumen del contenido incluido en la página 17 
                    
                        E. Separate Vertical Venting System  -  See Figures 6, 7, 8A, 8B and 9. NOTICE Roof penetrations require the use of roof flashing  and storm collar - not supplied with boiler. Vertical Venting  – 8. Locate air intake termination on the same roof  location as the vent termination if possible, to  1. See Figure 43 on Page 72 for Blower Vent  prevent nuisance boiler shutdowns.  However, boiler  Connector Assembly.  Do not exceed maximum vent  may be installed with vertical venting and sidewall  len
                    
                    Resumen del contenido incluido en la página 18 
                    
                        d. Install storm collar on air intake pipe 15. Seal all joints airtight, using silicone caulk or self- immediately above flashing.  Apply Dow adhesive aluminum tape. Corning Silastic 732 RTV Sealant between  16. Install Air Intake Terminal: air intake pipe and storm collar to provide   Vertical - Insert intake piping into intake terminal  weathertight seal. collar.  Secure terminal to intake piping and seal  e. All exposed air intake piping must be  joint with silicone caulk. constructed of corr
                    
                    Resumen del contenido incluido en la página 19 
                    
                        19 Figure :  Vertical Vent Installation Figure 7:  Attic Offset                                                                                                                                                                                                                                                                                                                                                                                                                                                    
                    
                    Resumen del contenido incluido en la página 20 
                    
                        0 Figure 8A:  Vertical Vent/Air Termination (” Vent Terminal) Extend Vent/Air Intake Piping to maintain minimum vertical (“X”) and minimum horizontal (“y”) distance of twelve (1) inches from  roof surface.  Allow additional vertical (“X”) distance for expected snow accumulation.