Resumen del contenido incluido en la página 1 
                    
                        Shown withFK19
1
INSTALLER:  LEAVE THIS MANUAL WTIH THE APPLIANCE.
CONSUMER:  RETAIN THIS MANUAL FOR FUTURE REFERENCE.
INSTALLATION AND
OPERATION INSTRUCTIONS
CERTIFIED UNDER CANADIAN AND AMERICAN NATIONAL STANDARDS: ANSI Z21.50   CSA 2.22 FOR VENTED GAS FIREPLACE.
GD19N
NATURAL GAS
GD19P
PROPANE
CERTIFIED FOR CANADA AND UNITED STATES USING ANSI/CSA METHODS.
SAFETY INFORMATION
!
WARNING
If the information in these instructions are 
not followed exactly, a fire or explosion 
may result causing pr
                    
                    Resumen del contenido incluido en la página 2 
                    
                        2 TABLE of CONTENTS PG 2-5  INTRODUCTION 25  BLOWER INSTALLATION   Warranty TM 25  NIGHT LIGHT REPLACEMENT   General Instructions   General Information 26-27 FINISHING   Care of Glass and Plated Parts   Glass Door Installation and Removal   Dimensions   Log Placement   Logo Placement 5-15  VENTING   Control Functions   Venting Lengths and Air Terminal Locations   Typical Vent Installations 28  WIRING DIAGRAM   Special Vent Installations 29  OPERATION / MAINTENANCE   Minimum Air Terminal Location
                    
                    Resumen del contenido incluido en la página 3 
                    
                        3 NAPOLEON® products are manufactured under the strict Standard of the world recognized  ISO 9001 : 2000 Quality Assurance Certifi cate. NAPOLEON® products are designed with superior components and materials, assembled by trained  craftsmen who take great pride in their work. The burner and valve assembly are leak and test-fi red at  a quality test station. The complete fi replace is test-fi red and thoroughly inspected by a qualifi ed techni- cian before packaging to ensure that you, the customer, r
                    
                    Resumen del contenido incluido en la página 4 
                    
                        4 GENERAL INSTRUCTIONS GENERAL INFORMATION FOR YOUR SATISFACTION, THIS FIREPLACE HAS  THIS GAS FIREPLACE SHOULD BE INSTALLED AND  SERVICED BY A QUALIFIED INSTALLER  to conform with BEEN TEST-FIRED TO ASSURE ITS OPERATION AND  local codes. Installation practices vary from region to region QUALITY!  Minimum inlet gas supply pressure is 4.5 inches water column  and  it is important to know the specifi cs that apply to your  for natural gas and 11 inches water column for propane.  area,  Maximum inle
                    
                    Resumen del contenido incluido en la página 5 
                    
                        5 DIMENSIONS FIGURE 1b FIGURE 1c FIGURE 1a 7” DIA. 4” DIA. 3 21 /4” 1 3 34 /8” 19 /4” 1 33 /8” 3 26 /8” GAS LINE ACCESS 12” 1 10 /4” ELECTRICAL 13” 1 20 /2” 3 15 /8” ACCESS FIGURE 1e FIGURE 1d FIGURE 1f 1 7 34 /8” 33 /8” 9” 1 9 /2” 7” DIA. 4” DIA. 5” 1 2 /2” 3 1 /4” VENTING VENTING LENGTHS AND AIR TERMINAL LOCATIONS The connection between the adaptor for these systems and  Use only Wolf Steel, Simpson Dura-Vent, Selkirk Direct  the fi replace fl ue collar must be sealed using the black high  Temp 
                    
                    Resumen del contenido incluido en la página 6 
                    
                        6 VENTING LENGTHS AND AIR TERMINAL LOCATIONS CONTINUED When using Wolf Steel venting components, use only For optimum fl ame appearance and fi replace performance,  approved Wolf Steel rigid / fl exible components with the keep the vent length and number of elbows to a minimum.  following termination kits:Wall Terminal Kit  GD222, or The air terminal must remain unobstructed at all times.  1/12 to 7/12 Pitch Roof Terminal Kit  GD110, 8/12 to 12/12 Examine the air terminal at least once a year to ve
                    
                    Resumen del contenido incluido en la página 7 
                    
                        7  TYPICAL VENT INSTALLATIONS REAR EXIT TOP EXIT FIGURE 3a FIGURE 2a 16” 16” MINIMUM MINIMUM 35 FT MAXIMUM 35 FT MAXIMUM 3 FT MINIMUM 3 FT MINIMUM FIGURE 2b 20" MAXIMUM 24" MAXIMUM FIGURE 3b 10" MINIMUM 3 26 /8" MINIMUM PLUS RISE* 1 43 /8" MINIMUM PLUS RISE* 1 33 /8" * Refer to "Venting"  section. SPECIAL VENT INSTALLATIONS PERISCOPE TERMINATION CORNER TERMINATION The maximum vent length for a corner installation is 20" of  Use the GD201 periscope kit to locate the air termination  horizontal ru
                    
                    Resumen del contenido incluido en la página 8 
                    
                        8 MINIMUM AIR TERMINAL LOCATION CLEARANCES FIGURE 6 W415-0612 / C / 01.25.08                                                                                                                                                                                                                                                                                                                                                                                                                                        
                    
                    Resumen del contenido incluido en la página 9 
                    
                        9 W415-0612 / C / 01.25.08 VENTING APPLICATION FLOW CHART FIREPLACE VENT EXIT TOP EXIT REAR EXIT Horizontal Termination Vertical Termination Vertical Termination Horizontal Termination Vertical rise Vertical rise  Vertical rise  Vertical rise Vertical rise  Vertical rise vertical rise  Vertical rise  is equal to is equal to  is equal to  is less than is less than  is less than is less than  is equal to  or greater or greater  or greater  horizontal horizontal  horizontal horizontal  or greater  
                    
                    Resumen del contenido incluido en la página 10 
                    
                        10 DEFINITIONS ELBOW VENT LENGTH VALUES For the following symbols used in the venting calculations     feet inches and examples are:  1°  0.03   0.5  15°  0.45   6.0 > - greater than > - equal to or greater than 30°  0.9  11.0 < - less than 45°  1.35  16.0 < - equal to or less than 90°*   2.7  32.0 H - total of both horizontal vent lengths (H ) and offsets    T R   (H ) in feet O *  the fi rst 90° offset has a zero value and is shown in the  H - combined horizontal vent lengths in feet R formula 
                    
                    Resumen del contenido incluido en la página 11 
                    
                        11 TOP EXIT / HORIZONTAL TERMINATION Example 2: (H ) > (V ) T T V = V = 6 ft    1 T FIGURE 9 H = 3 ft   1 H = 5 ft  2 H = H + H = 3 + 5 = 8 ft R 1 2  H = .03(two 90° elbows - 90°) = .03(180° - 90°) = 2.7 ft O Simple venting confi guration  H = H + H = 8 + 2.7 = 10.7 ft  T R O  (only one 90° elbow) H + V = 10.7 + 6 =16.7 T T  Formula 1: H < 4.2 V  T T  4.2 V = 4.2 x 6 = 25.2 ft  T  10.7 < 25.2     Formula 2: H + V < 24.75 feet T T  16.7 < 24.75 Since both formulas are met, this vent configuration 
                    
                    Resumen del contenido incluido en la página 12 
                    
                        12 REAR EXIT / HORIZONTAL TERMINATION 90° Example 4: (H ) < (V ) T T H 3 Simple venting confi guration  V (only two 90° elbows) 2 H 2 90° V 1 FIGURE 13 H 1 90° FIGURE 12 See graph to determine the required vertical rise V for the  T V = 9 ft required horizontal run H 1  T V = 6 ft 2  V = V + V = 9 + 6 = 15 ft T 1 2  H = 3 ft   1 H = 2 ft  2 H = 1.5 ft 3 35 H = H + H + H = 3 + 2 + 1.5 = 6.5 ft R 1 2 3 33.3 30 H = .03(four 90° elbows - 90°)  O REQUIRED  = .03(90 + 90 + 90 + 90 - 90) = 8.1 ft VERTIC
                    
                    Resumen del contenido incluido en la página 13 
                    
                        13 REAR EXIT / HORIZONTAL TERMINATION (H ) > (V ) Example 5: T T 90° Simple venting confi guration H (only two 90° elbows) 90° 4 V 2 H 2 90° H 3 45° FIGURE 14 V 1 FIGURE 15 H 1 90° See graph to determine the required vertical rise V for the  T required horizontal run H T V = 4 ft 1  150 V = 1.5 ft 147 2  V = V + V = 4 + 1.5 = 5.5 ft T 1 2  REQUIRED H = 2 ft   1 VERTICAL H = 1 ft  2 RISE IN  H = 1 ft   INCHES V 3 T H = 1.5 ft 4 H = H + H + H + H = 2 + 1 + 1 + 1.5 = 5.5 ft 100 R 1 2 3 4  H = .03(fo
                    
                    Resumen del contenido incluido en la página 14 
                    
                        14 TOP OR REAR EXIT VERTICAL TERMINATION (H ) < (V ) T T Example 6: V FIGURE 17 90° 3 90° FIGURE 16 H V 2 2 H 1 90° V 1 90° ple venting confi gurations V = 3 ft 1  See graph to determine the required vertical rise V for the  T V = 6 ft 2  required horizontal run H . T V = 8 ft 3  V = V + V + V = 3 + 6 + 8 = 17 ft T 1 2 3  H = 2 ft   1 35 H = 2.5 ft 2 H = H + H = 2 + 2.5 = 4.5 ft R 1 2 30 H = .03(four 90° elbows - 90°)  O REQUIRED  = .03(90 + 90 + 90 + 90 - 90) = 8.1 ft VERTICAL H = H + H = 4.5 + 
                    
                    Resumen del contenido incluido en la página 15 
                    
                        15 Example 7: (H ) > (V ) T T V = 2 ft 1  V = 1 ft Simple venting confi gurations 2  V = 1.5 ft 3  V = V + V + V = 2 + 1 + 1.5 = 4.5 ft T 1 2 3  H = 6 ft   1 H = 2 ft 2 H = H + H = 6 + 2 = 8 ft R 1 2 H = .03(four 90° elbows - 90°)  O  = .03(90 + 90 + 90 + 90 - 90) = 8.1 ft H = H + H = 8 + 8.1 = 16.1 ft  T R O  H + V = 16.1 + 4.5 = 20.6 ft T T  Formula 1: H < 3V T T 3V = 3 x 4.5 = 13.5 ft  T  16.1 > 13.5    FIGURE 17 Since this formula is not met, this vent confi guration is  unacceptable. Formula 
                    
                    Resumen del contenido incluido en la página 16 
                    
                        16 TOP EXIT CONVERSION In order to convert the venting confi guration from a rear exit to a top exit, remove the components as illustrated: When reinstalling in the alternate position: Check gaskets for tears, replace if necessary to ensure a proper seal. FIGURE 18 Outer Top 7” Top Access Plate 7” Cover Plate 7” Gasket 4” Cover Plate 7” Collar 4” Gasket 7” Gasket 4” Collar 4” Gasket W415-0612 / C / 01.25.08                                                                                           
                    
                    Resumen del contenido incluido en la página 17 
                    
                        17 INSTALLATION WALL AND CEILING PROTECTION For optimum performance, it is recommended that  VERTICAL INSTALLATION horizontal runs have a minimum 1" rise per foot when  This application occurs when venting through a roof.  using Simpson Dura-Vent, Selkirk Direct Temp,  Installation kits for various roof pitches are available from  American Metal Amerivent, or Wolf Steel rigid or   your Napoleon® dealer. See Accessories to order the specifi c  fl exible vent components. kit required. For safe and p
                    
                    Resumen del contenido incluido en la página 18 
                    
                        CAUTION - HOT ATTENTION-CHAUD CAULKING 18 USING FLEXIBLE VENT COMPONENTS Use only approved fl exible vent pipe kits marked: ! FIGURES 22a&b WARNING ELBOW Do not allow the 4" flexible vent pipe  to  bunch up on horizontal or vertical  runs and elbows.  Keep it pulled  tight.  A 1 1/4” air gap between the 4"  and 7" flexible vent pipes all around  “Wolf Steel Approved Venting” as  is required for safe operation.  A  SPACERS spacer is required at the start, middle identifi ed by the stamp only on the
                    
                    Resumen del contenido incluido en la página 19 
                    
                        CAUTION - HOT ATTENTION-CHAUD 19 4.  Thread the air terminal connector / vent pipe assembly down through the roof. The air  INNER terminal must be located vertically and plumb.  Attach the air terminal connector to the roof  PIPE support, ensuring that the top of the air terminal is 16” above the highest point that it penetrates  the roof.  Figure 27.  DO NOT CLAMP THE FLEXIBLE VENT PIPE. 5. Remove nails from the shingles, above and to the sides of the chimney. Place the fl ashing  FIGURE 26 over
                    
                    Resumen del contenido incluido en la página 20 
                    
                        20 6. Remove nails from the shingles, above and to the  EXTENDED HORIZONTAL AND CORNER  sides of the chimney. Place the fl ashing over the air terminal  AIR TERMINAL INSTALLATION connector and slide it underneath the sides and upper edge  FIGURE 30     1. Follow the instructions of the shingles. Ensure that the air terminal connector is  3 properly centered within the fl ashing, giving a / " margin all  for "Horizontal Air Terminal 4 Installations", items 1 to 3. around. Fasten to the roof. Do NOT