Résumé du contenu de la page N° 1 
                    
                         Date:  8-4-2010 
 Revision: 0 
 Form:  2396 
Bryan Steam LLC 
Installation and Operating Service Manual 
 
 
 
 
 
Triple-Flex 
High Efficiency Boilers 
 
 
 
 
 
 
 
 
                                                                                                                                                                                                                                                                                                                                          
                    
                    Résumé du contenu de la page N° 2 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  INSTALLATION AND OPERATION SERVICE MANUAL  Triple-Flex 150, 200, 250, & 300  High Efficiency Boilers                  Bryan Steam LLC  783 North Chili Avenue * Peru, IN  46970  Phone 765.473.6651 • Fax 765.473.3074    E-mail: inquiry@bryansteam.com   Internet:  www.bryanboilers.com                                                                                                                                                                            
                    
                    Résumé du contenu de la page N° 3 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  Table of Contents    Bryan Steam LLC ..............................................................................................................................i  Installation and Operating Service Manual........................................................................................i  Table of Contents ............................................................................................................................ iii  Tables .
                    
                    Résumé du contenu de la page N° 4 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  2.2.11 Operation Page............................................................................................................ 22  2.2.12 Annunciation Page....................................................................................................... 23  2.2.13 Modulation Configuration............................................................................................. 23  2.2.14 Firing Rate Control Page ...........................
                    
                    Résumé du contenu de la page N° 5 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396    Tables    Table 1 Minimum Clearance............................................................................................................ 2  Table 2 Electrical Requirements...................................................................................................... 4  Table 3 Boiler Draft.......................................................................................................................... 7  Table 4 Water Flow Swi
                    
                    Résumé du contenu de la page N° 6 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  Figure 35 Outdoor Reset Sensor Configuration............................................................................ 26  Figure 36 Air / Gas Ratio Tappings ............................................................................................... 35  Figure 37 LL / Multi-Boiler Field Wiring ......................................................................................... 58  vi                                                         
                    
                    Résumé du contenu de la page N° 7 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  Section 1 Installation Instructions–  Triple-Flex High Efficiency Boilers 1                                                                                                                                                                                                                                                                                                                                                                                           
                    
                    Résumé du contenu de la page N° 8 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  Note:  1.2.1 MINIMUM CLEARANCES TO  Please read and save for future reference the  COMBUSTIBLE SURFACES  entire instruction manual before attempting  installation of or starting the unit.  Insurance and  local or state regulatory codes may contain  additional or more stringent requirements than  those contained in this manual.  Installation must  conform to these codes and any other authority  having jurisdiction.  This instruction manual shall  be p
                    
                    Résumé du contenu de la page N° 9 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  BE REMOVED after the boiler is set in-place on  1.4.5 CONDENSATE DRAIN  its concrete foundation before any  CONNECTION  piping/electrical connections are made.   It is  recommended that the plastic protective cover  be left on as long as possible to reduce finish  A 1” MPT connection is provided to drain the  damage from the installation.  condensed products of combustion from a trap  located beneath the boiler.  This must be run to  a drain using st
                    
                    Résumé du contenu de la page N° 10 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  valve shall be tested for leaks. Model TF300/250 TF200/150    200 V – 240 V / 60 Hz / 3 Ph  Blower Motor  3 (4.02) N/A  KW (HP)  1.4.9 VENTING OF GAS TRAIN  Full Load  15.6 N/A  1 COMPONENTS  Amps Service Fuse (3) 20 Amp N/A  400 V – 480V / 60 Hz / 3 Ph  Blower Motor  N/A N/A  KW (HP)  Full Load  N/A N/A  1 Amps Service Fuse N/A N/A  200 V – 240 V / 60 Hz / 1 Ph  Blower Motor  N/A 1.05 (1.41)  KW (HP)  Full Load  N/A 6  1 Amps Service Fuse N/A (2) 7 
                    
                    Résumé du contenu de la page N° 11 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  interlocked with the boiler to prevent boiler  One Permanent Opening Method  operation if the dampers are closed.      One opening commencing within 12” of the top  Combustion air openings must never be blocked  of the room shall be provided.  The opening  or obstructed in any manner.  shall be directly to the outside or shall be ducted    to the outside with a horizontal or vertical duct.    The boiler room must be at a positive or neutral    pressu
                    
                    Résumé du contenu de la page N° 12 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  specified.  Where the louver and grille design BOCA, National Mechanical Code  and free area are not know, it shall be assumed   that wood louvers have a 25 percent free area,  and met louvers and grilles have 75 percent free WARNING:  area.  Non-motorized louvers and grilles shall be  fixed in the open position.  Do not locate air intakes where    petroleum distillates, CFC’s,  Screens  detergents, volatile vapors or any  Minimum Screen Mesh Size:  
                    
                    Résumé du contenu de la page N° 13 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  Horizontal sections of the flue vent system must Note:  be pitched back towards the boiler at ¼ inch per  An existing masonry chimney may be utilized  foot to avoid condensate pooling and allow for  PROVIDING that the existing chimney is lined  proper drainage.  Venting may be horizontal,  with Special Gas Vent material(s), primarily  through the wall installation or vertical, through  AL29-4C®.  There are venting manufacturers  the roof installation
                    
                    Résumé du contenu de la page N° 14 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  shaft used for return air, hot air,  Combustion Air Supply Dampers, Louvers,  ventilating air, or combustion air.  and Grilles  • An appliance that operates at a positive    vent pressure shall not be connected to  The free area of the combustion air supply  a venting system serving any other  opening shall be calculated by subtracting the  appliance.  The Triple-Flex boiler  blockage area of all fixed louvers, grilles or  operates at a positive vent
                    
                    Résumé du contenu de la page N° 15 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  1.8.1 HYDROSTATIC TEST OF  BOILERS AND SYSTEM  After completing the boiler and burner  installation, the boiler connections, fittings,  attachments and adjacent piping must be  inspected for leaks by filling the unit with water.   The pressure should be gradually increased to a  pressure just below the setting of boiler safety  relief valve(s).    Remove the boiler tube access panels (see  dimensional drawing in the boiler manual).   Inspect the tube
                    
                    Résumé du contenu de la page N° 16 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  Section 2 Start-Up and Operation  Triple-Flex High Efficiency Boilers 10                                                                                                                                                                                                                                                                                                                                                                                              
                    
                    Résumé du contenu de la page N° 17 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  2.1.1 TRIPLE-FLEX FRONT VIEW  WARNING:  Improper servicing and start-up of this  equipment may create a potential  hazard to equipment, operators, or  persons in the building.  Only fully trained and qualified  personnel should do servicing and  start-up.    WARNING:  Before disconnecting or opening any  fuel line, cleaning or replacing parts of  any kind take the following  precautions.  Turn OFF the main fuel shutoff valves,  including the pilot ga
                    
                    Résumé du contenu de la page N° 18 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  the touch panel display.  There is a soft  2.1.2 TRIPLE-FLEX REAR VIEW  switch (paragraph 2.2.11) provided with the  SOLA hydronic control that will put the boiler  into standby for an indefinite period of time.    WARNING:  The boiler on / off switch will not turn  off the 3 phase high voltage power to  the motor.  7. The boiler lockout reset button is a push  button used to reset the hydronic control  after a boiler failure.  8. The power on light 
                    
                    Résumé du contenu de la page N° 19 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396  1. Main gas inlet connection.  This connection  2.1.3 TRIPLE-FLEX LEFT SIDE VIEW  is a 2” male national pipe thread.  2. Condensate Drain Connection.  This  connection is a 1” male national pipe thread.   For installation details refer to paragraph  1.4.5.  3. This jacket access panel will permit access  to the majority of the boiler devices.  4. These jacket access panels will permit  access to the flue collector.  There is no  practical reason for 
                    
                    Résumé du contenu de la page N° 20 
                    
                         Date:  8-4-2010   Revision: 0   Form:  2396   port is also used to record the furnace  pressure.  NOTE:  15. Boiler water flow switch.  The boiler water  The low fire displacement final adjustment  flow switch is adjustable within the  should be made at low fire only.  parameters listed in the table.        3. Main gas pressure regulating and shutoff  Mode Of Operation  valve actuator.  The pressure regulating  Settings Switch Switch  actuator provides slow opening fast closing  Closed Open  sa