ページ1に含まれる内容の要旨 
                    
                        DO NOT
DISCARD
R
5100-I ACT WOOD INSERT
Advanced Combustion Technology (ACT)
Model:
Tested and Portland
O-T L
Oregon USA
Listed by
5100I-GD-B US
C
OMNI-Test Laboratories, Inc.
5100I-NL-B
NOTICE
DO NOT DISCARD THIS MANUAL
•	 Read,	 understand	 and	 •	 Leave	 this	 manual	 with	
•	 Important	 operating	
follow	 these	 instructions	 party	 responsible	 for	
and	 maintenance	 in-
for	 safe	 installation	 and	 use	and	operation.
structions	included.
operation.
WARNING
WARNING
HOT SURFACES!
If	theinfo
                    
                    ページ2に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT and Welcome to the Quadra-Fire Family! Hearth & Home Technologies welcomes you to our tradition  achieve the optimum operation of our stoves, inserts and fire- of excellence!  In choosing a Quadra-Fire appliance, you have  places.		 And	 yet	 we	 are	 old-fashioned	 when	 it	 comes	 to	 crafts- our assurance of commitment to quality, durability, and perfor- manship.		 Each	 unit	 is	 meticulously	 fabricated	 and	 surfaces	 are	 mance. hand-finished for lasting beauty 
                    
                    ページ3に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT TABLE OF CONTENTS Section 1: Listing and Code Approvals Section 8:  Operating Instructions  A. Appliance Certifications	 ......................4  A. Over-Firing Your Appliance	.................23 	 B.	 Mobile	Home	Approved 	 ......................4  B. Wood Selection & Storage	..................23	  C. Glass Specifications	............................4 C. Burning Process	..................................23-24	  D. BTU & Efficiency Specifications	..........4 D.	 Air	Co
                    
                    ページ4に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT Listing and Code Approvals 1 A.  Appliance Certification D.  BTU & Efficiency Specifications 	 MODEL: 5100-I	 ACT	WoodInsert 	 1.98grams/hour 	 EPA Certified LABORATORY: OMNI	 Test	Laboratories,Inc. 	 75.5%	on	Medium Efficiency REPORT NO. 061-S-59-2 BTU - EPA 50,800 TYPE: WoodStove 	 up to ,500 sq ft HeatingCapacity 	 STANDARD: UL18 and ULC S68 and (UM)     8-HUD, Mobile Home Approved. 21	inches MaximumLog 	 Length 	 3.0	cubicfeet 	 Firebox Capacity The Quadra-Fir
                    
                    ページ5に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT Getting Started 2 B. Fire Safety To provide reasonable fire safety, the following should be  WARNING given	serious	consideration: 1. Install at least one smoke detector on each floor of  Fire Risk your	 home	 to	 ensure	 your	 safety.	 	 They	 should	 be	 • HOT while in operation and after fire  located	 away	 from	 the	 heating	 appliance	 and	 close	 is	out. to the sleeping areas.  Follow the smoke detector  •	 DO	NOT 	operatewithout 	 	protective	 manufacturer’s	 pl
                    
                    ページ6に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT C.  Negative Pressure tion appliances and exhaust equipment. Draft	 is	 the	 pressure	 difference	 needed	 to	 vent	 appliances	 	 •	 Ensure	 furnace	 and	 air	 conditioning	 return	 vents	 are	 successfully.		Considerationsfor 	 successful 	 	draft	include: not	 located	 in	 the	 immediate	 vicinity	 of	 the	 appliance,  • Preventing negative pressure • Avoid installing the appliance near doors, walkways  or	small	isolated	spaces. 	 •	 Locationof 	 appliance 	 	and	ch
                    
                    ページ7に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT D.  Flue Draft Considerations F. Inspect Appliance and Components 	 •	 Open 	 the	 appliance	 and	 remove	 all	 the	 parts	 and	 Location	 of	 the	 appliance	 and	 chimney	 will	 affect	 perfor- mance.		 As	shown	in	 Figure 6.1the 	 chimney 	 should: 	 articles packed inside. 	 •	 Be	 installed	 through	 the	 warm	 space	 enclosed	 by	 the	 	 •	 Inspectall 	 the 	 parts 	 and 	 	glassfor 	 	shippingdamage. 	 	 	 building	 envelope.		 This	 helps	 to	 produce	 more	 dra
                    
                    ページ8に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT Dimensions and  Clearances 3 A.  Appliance Dimensions TOP VIEW NOTE:  Flue Collar: 6 inch (152mm) diameter (ID) 34-3/16"  (919mm) 25-5/8"  (651mm) NOTE: • Illustrations and photos reflect typical installations and  C L are	 FOR DESIGN PURPOSES ONLY. 17-5/8"  •	 I llustrations/diagramsare 	 	notdrawn 	 to 	 scale. 	 (448mm) 12-7/8"  •	 Actual	installation/appearancemay 	 vary 	 due 	 to 	 	 (327mm) individualdesign 	 preference. 	 • Hearth & Home Technologies reserves t
                    
                    ページ9に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT In Canada a full length 6 inch (15mm) ULC S65 flue  B.  Clearance to Combustibles liner required as per ULC S68. NOTE:  When installing into a masonry fireplace, the fire- Maximum Mantel Depth: 12 inches (305mm) place must be built to UBC Chapter  standards.  Do not  remove brick or mortar from masonry fireplace to accom- Mantel  modate	 insert.	 	 The	 permanent	 metal	 warning	 plate	 pro- vided must be attached to the back of the fireplace stating  Fascia or Tr
                    
                    ページ10に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT Installation Considerations 4 A.  Floor Protection USA & Canada Hearth Extension Insulation Alternatives, R Value = 1.16 Thermal	 protection	 must	 be	 1/2	 inch	 (13mm)	 minimum	 k per  R per  Minimum  thickness (“k” value = 0.8) or equivalent material. Material inch inch thickness  thick thick required All floor protection must be non-combustible (i.e., metals,  Hearth & Home HX, HX 0.43 2.33 1/2in. 	 brick, stone, mineral fiber boards, etc.).  Any organic materi-
                    
                    ページ11に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT D.  Outside Air Installation 1.	 Remove	 the	 2	 air	 control	 spring	 handles.	 Figure  NOTE: 	 If	 your	 home	 is	 fairly	 airtight,	 it	 is	 recommend	 that	 you	 11.1.  Remove	 the	 grille	 by	 removing	 2	 screws	 in	 the	 install	 the	 outside	 air	 that	 comes	 standard	 with	 the	 appliance.	 	 center	of	the	grille.		 Figure 11.2 If you are installing into a Mobile Home, outside air is required.  . Unplug the snap disc by-pass switch and speed con- The firepla
                    
                    ページ12に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT E.   Blower Cord Location The	 5100-I	 Insert	 comes	 standard	 with	 2	 blowers,	 installed	 Blower cord attached to  at	 the	 factory	 with	 the	 power	 cord	 on	 right	 side	 of	 insert	 (as	 right side of grille. you	 face	 the	 unit).		 Do	 not	 route	 the	 power	 cord	 under	 or	 in	 front	ofappliance. 	 The power cord can also be installed on the left side. Follow  Strain Relief instructions	below.		 Blower cord Green grounding wire Green  White wire into Red Co
                    
                    ページ13に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT F.  Wiring Diagram                                      Figure 13.1 G.  Optional Offset Adapter Determine	 offset	 needed	 and	 adjust	 adapter	 accordingly	 however, DO NOT OVER EXTEND ADAPTER.  Follow  FULLY EXTENDED the	 detailed	 instructions	 that	 are	 supplied	 with	 the	 offset	 adapter. Chimney Liner Apply bead of  Drill points Slide gasket  stove cement 12-1/4" between Chimney  1-1/4" Mounting halves Liner Bracket 3-3/4" 2-1/2" Drill holes  Offset Adapter 3-1
                    
                    ページ14に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT Chimney Requirements 5 Inspections A.  Venting Components Existing	 chimneys	 should	 be	 inspected	 and	 cleaned	 by	 a	 qualified professional prior to installation.  The chimney  Chimney Connector: must not have cracks, loose mortar or other signs of dete- It is also known as flue pipe or stove pipe.  It must be 6  rioration and blockage.  Hearth & Home recommends a  inches	 (152mm)	 minimum	 diameter	 stainless	 steel	 connector	 NFI or CSIA certified professional 
                    
                    ページ15に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT Air Clearances C.  Installing Chimney Components To	 ensure	 that	 insulation	 or	 any	 other	 combustible	 material	 REqUIRED:  A minimum NFPA 11 required stainless steel  does	 not	 contact	 the	 chimney,	 a	 chimney	 inside	 the	 house	 liner connector pipe extending to the first flue liner of the  must	 have	 at	 least	 2	 inches	 (51mm)	 of	 air	 space	 clearance	 existing	 code	 approved	 masonry	 chimney.		 To	 eliminate	 dilu- around	 the	 chimney.	 	 A	 chimn
                    
                    ページ16に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT D.  Chimney Termination Requirements NOTE: •	 Chimney	performancemay 	 	vary. Follow manufacturers instructions for clearances, securing,  •	 Trees,	buildings,	rooflines 	 and 	 	wind	conditions	affect	 flashing and terminating the chimney. performance. • Chimney height may need adjustment if smoking or   • Musthave 	 an 	 approved 	 and 	 	listed	cap overdraftoccurs. 	  • Must	 not	 be	 located	 where	 it	 will	 become	 plugged	 by	 snow	or	other	material 	 •	 Must	 t
                    
                    ページ17に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT F. Masonry Fireplace NOTE:  Installation into fireplaces without a permit will  The Quadra-Fire 5100-I Insert conforms with the UL 18  void	thelisting. 	 and ULC S68 (Canada) in all respects, and is approved to  UL & ULC safety standards for installation and use within a  fireplace with a masonry chimney in accordance with NFPA  NOTE:	 	 In	 Canada,	 the	 chimney	 liner	 must	 conform	 to	 211. the Class  requirements of CAN/ULC-S65, Standard  In the USA all mason
                    
                    ページ18に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT The fireplace must not be altered, except that the damper  G. Factory-Built Zero Clearance Fireplace may	 be	 removed	 to	 accommodate	 a	 direct-connect	 starter	 (USA INSTALLATIONS ONLY) pipe	 or	 chimney	 liner,	 and	 external	 trim	 pieces	 which	 do	 not	 affect the operation of the fireplace may be removed provid- The Quadra-Fire 5100-I  Insert is listed to UL 18 Standard   ing they can be stored on or within the fireplace for reassem- and	 is	 approved	 for	 i
                    
                    ページ19に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT Mobile Home Installation 6 Spark Arestor Cap 1.	 An	 outside	 air	 inlet	 must	 be	 provided	 for	 combustion 	 	 	 See	 page 11 for	detailed	information. 2.	 Appliance 	 must	 be	 secured	 to	 the	 mobile	 home	 structur	e 	 	.	 Storm Collar Drill	 a	 hole	 on	 each	 side	 of	 the	 insert	 into	 the	 outer	 Roof Flashing skin and into the floor.  Use plumbers tape to secure to  structure (washers may be required).    3.	 Appliance 	 must	 be	 grounded	 with	 #8	 solid
                    
                    ページ20に含まれる内容の要旨 
                    
                        R  5100-I  ACT WOOD INSERT Appliance Set-up 7 C. Panel & Trim Set Installation A. Installation Outline StandardSize: 	 		30-1/2”	h	x	47”w 	 1. Record serial number on back cover of manual.   Large	Size:		34-1/4”	hx 	 51-1/4” 	 w 	 . Remove the leveling bolts from the component pack and  Kit Includes:   Tools Needed: start	the	bolts	inthe 	 weld 	 	nuts.	 Figure 20.1 () Side panels, left & right Screwdrivers: . Position insert on hearth with rear of insert extending into  (1) Panel top & faste