ページ1に含まれる内容の要旨 
                    
                        DiREcT-vENT FiREPLA cE
oWNER’S oPERATioN AND iNSTALLATioN MANUAL
NATURAL GAS “vicT oRiAN” M oDEL (v)v36EN, (v)v42EN SERiES
PRoPANE/LP GAS “vicT oRiAN” M oDEL (v)v36EP, (v)v42EP SERiES
WARNING: If the information in this manual is 
WARNING: Improper installation, adjust-
not followed exactly, a fire or explosion may 
ment, alteration, service, or maintenance 
result causing property damage, personal 
can cause injury or property damage. Refer 
injury, or loss of life.
to this manual for correct i
                    
                    ページ2に含まれる内容の要旨 
                    
                        TAbLE oF coNTENTS Safety Information ........................................................................2 Inspecting Burners......................................................................24 Product Identification ....................................................................3 Cleaning and Maintenance .........................................................25 Local Codes..................................................................................3 Troubleshooting .........
                    
                    ページ3に含まれる内容の要旨 
                    
                        SAFETy iNFoRMATioN LocAL coDES Install and use fireplace with care. Follow all local codes. In the  Continued absence to local codes, use the current National Fuel Gas Code   12. Do not use this fireplace to cook food or burn paper or other  ANSI Z223.1/NFPA 54* (USA) or the current CSA-B149.1 Instal- objects. lation Code (Canada). 13. Do not use any solid fuels (wood, coal, paper, cardboard, etc.)  *Available from: in this fireplace. Use only the gas type indicated on fireplace  American Nation
                    
                    ページ4に含まれる内容の要旨 
                    
                        PRE-iNSTALLATioN  PREPARATioN LOCAtION AND SPACE REqUIREMENtS Flush with a wall Determine the safest and most efficient location for your DESA  Corner  direct-vent fireplace. Make sure that rafters and wall studs are not  installation in the way of the venting system. Choose a location where the heat  Through exterior wall  output is not affected by drafts, air conditioning ducts, windows  enclosed in a chase or doors. Figure 2 shows some common locations. Be aware of all  restrictions and preca
                    
                    ページ5に含まれる内容の要旨 
                    
                        PRE-iNSTALLATioN  1 2 PREPARATioN Continued 3 A Wall FRAMING AND FINISHING 4 Figure 4 shows typical framing of this fireplace. Figure 5 shows fram- B 5 ing for corner installation. All minimum clearances must be met. C 6 For available accessories for this fireplace, see Accessories on page  D 29. If you are using a separate combustible mantel piece, refer to  E 7 Figure 6 for proper installation height. You can install noncombustible  F G mantels at any height above the fireplace. Note: Noncombu
                    
                    ページ6に含まれる内容の要旨 
                    
                        V G G V A D E V B L LocATioN oF TERMiNATioN cAP N N H C I B Fixed V V Fixed Closed Openable Closed Openable B F V G V J X B B M A V K X V TERMINATION CAP AIR SUPPLY INLET G GAS METER RESTRICTED AREA X (TERMINATION PROHIBITED) A = clearance above grade, veranda, porch, deck, or balcony I = clearance to service regulator vent outlet [*72" (182.9 cm)   [*12" (30.5 cm) minimum]  minimum] B =  clearance to window or door that may be opened J = clearance to non-mechanical air supply inlet to building 
                    
                    ページ7に含まれる内容の要旨 
                    
                        INSt ALLAtION PRECAUtIONS vENTiNG iNSTALLATioN  • Wear gloves and safety glasses for protection iNSTRUcTioNS • Use extreme caution when using ladders or when on roof tops • Be aware of electrical wiring locations in walls and ceilings NOtICE: Read these instructions completely before  attempting installation. The following actions will void the warranty on your venting system: • Installation of any damaged venting component These models are tested and approved for use with DESA (direct- vent) pi
                    
                    ページ8に含まれる内容の要旨 
                    
                        vENTiNG iNSTALLATioN  Female  Locking Lugs iNSTRUcTioNS Continued 2. Direct vent pipe sections and components are designed with  Male  special twist-lock connections. Slots 	 t wist-Lock Procedure: The female ends of the pipes have  locking lugs (indentations). These lugs will slide straight into  matching slots on the male ends of adjacent pipes. Push pipe  sections together and twist one section clockwise approxi- Figure  8 - Vent Pipe Connections mately one-quarter turn until the sections are
                    
                    ページ9に含まれる内容の要旨 
                    
                        vENTiNG iNSTALLATioN  iNSTRUcTioNS Minimum Pipe  Continued Siding Standoff 1 Overlap 1 / " 4 7. Slide the wall firestop over the vent pipe before connecting  horizontal run to vent cap (see Figure 12). Screws 8. Carefully move fireplace, with vent assembly attached, toward  Direct Vent  wall and insert vent pipe into horizontal termination. The pipe Pipe 1 overlap should be a minimum of 1 /4". Wall  Firestop 9. Slide wall firestop against interior wall surface and attach with  screws provided. S
                    
                    ページ10に含まれる内容の要旨 
                    
                        CORNER INSTALLATION vENTiNG iNSTALLATioN  Recommended Applications: iNSTRUcTioNS • Corner ground floor installation Continued • Ground floor installation where pipe vents horizontally through  wall (over 12" horizontal pipe) Horizontal t ermination Configurations Figures 14 through 18 show different configurations and alterna- • Basement installation where one foot clearance from ground to  tives for venting with horizontal termination. Each figure includes termination is possible a chart with c
                    
                    ページ11に含まれる内容の要旨 
                    
                        vENTiNG iNSTALLATioN iNSTRUcTioNS Continued SNORKEL TERMINATION INSTALLATION Recommended Applications: • Installations requiring a vertical rise on building exterior • Any installation using snorkel termination to achieve one foot above ground Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building. If installing snorkel termina- tion below grade, you must provide proper drainage to prevent water from entering snorkel termination (see Figure
                    
                    ページ12に含まれる内容の要旨 
                    
                        2. Assemble the desired lengths of pipe and elbows necessary to  vENTiNG iNSTALLATioN  reach from the fireplace flue up through the firestop.  Be sure all  iNSTRUcTioNS pipe and elbow connections are fully twist-locked (see Figure  8, page 8). Continued 3. Cut a hole in the roof using the locating hole as a center point.  INSt ALLAt ION FOR vERt ICAL t ERMINAt ION (Cover any exposed open vent pipes before cutting hole in roof.)  3 3 The 10 / " x 10 / " hole must be measured on the horizontal;  N
                    
                    ページ13に含まれる内容の要旨 
                    
                        vENTiNG iNSTALLATioN  iNSTRUcTioNS Continued Venting with Two 90° Elbows vertical t ermination Configurations  Vertical (V ) Horizontal (H) 1 Figures 21 through 24 show four different configurations for verti-  5' min. 6' max. cal termination.  6' min. 12' max. Venting with Two 90° Elbows  7' min. 18' max.  Vertical (V) Horizontal (H ) +  8' min. 20' max. 1   Horizontal (H ) 2  5' min. 2' max.  6' min. 4' max. Note: Install restrictor  into inner collar of   7' min. 6' max. fireplace as shown.  
                    
                    ページ14に含まれる内容の要旨 
                    
                        DESA Terminations vENTiNG iNSTALLATioN  Number Description iNSTRUcTioNS 01494 Vertical Round Termination - Galvanized (1) Continued 01495 Horizontal Round Termination - Galvanized (1) 01496 Horizontal Square Termination - Galvanized (1) HIGH ALTITUDE INSTALLATION 01798 Vertical Round High Wind Termination (1) Your DESA direct-vent fireplace has been CSA tested and approved  01800 Horizontal Square High Wind Termination (1) for elevations from 0-2000 feet (USA) and elevations from 0-4500  01801 1
                    
                    ページ15に含まれる内容の要旨 
                    
                        Switch Speed Control FiREPLAcE iNSTALLATioN Bracket Continued Blower  Plug-In 3.  Place the blower against the lower rear wall of the firebox outer  wrapper with the exhaust port directed upward. The blower will  fit inside the back opening and be held in position against the  back wall by the magnets (see Figure 25). Duplex Outlet (Located  underneath firebox  4.  Be certain that all wire terminals are securely attached to ter- Locknut floor against lower right  minals on blower motor and that 
                    
                    ページ16に含まれる内容の要旨 
                    
                        blower Wiring Diagram FiREPLAcE iNSTALLATioN Continued  CAUtION: Label all wires prior to disconnection  when servicing controls. Wiring errors can cause im- 3. Place the blower against the lower rear wall of the firebox outer  proper and dangerous operation. Verify proper opera- wrapper with the exhaust port directed upward and the thermo- tion after servicing. disc positioned up near the fireplace bottom. The thermodisc  must be oriented near the fireplace bottom as shown in Figure 28  Variabl
                    
                    ページ17に含まれる内容の要旨 
                    
                        CSA Design-Certified  FiREPLAcE iNSTALLATioN Equipment Shutoff Valve  Continued with 1/8" NPT Tap* Natural - From  For propane/LP connection only, the installer must supply an  Gas Meter (5.5"  external regulator. The external regulator will reduce incoming  W.C. to 10.5"  gas pressure. You must reduce incoming gas pressure to between  Approved Flexible W.C. Pressure) 11" and 14" of water. If you do not reduce incoming gas pressure,  Gas Line Propane/LP   fireplace regulator damage could occur. 
                    
                    ページ18に含まれる内容の要旨 
                    
                        PRESSURE tES t ING FIREPLACE GAS CONNECt IONS FiREPLAcE iNSTALLATioN 1. Open equipment shutoff valve (see Figure 33). Continued 2. Open propane/LP supply tank valve for propane/LP fireplace  CHECKING GAS CONNECtIONS or  main gas valve located on or near gas meter for natural gas  fireplace.  WARNING: Test all gas piping and connections for  3. Make sure control knob of fireplace is in the OFF position. leaks after installing or servicing. Correct all leaks at  once. 4. Check all joints from equi
                    
                    ページ19に含まれる内容の要旨 
                    
                        5. Close glass door frame. Lock latches by placing the bar under the  FiREPLAcE iNSTALLATioN tab on door and pushing down and back on latch (see Figure 37). Continued 6. Replace screen/rod assembly by reversing step 1. REMOvING/REPLACING GLASS DOOR 7. Replace louvers by reversing procedure under Removing Lou- ver Panels.  CAUtION: Do not operate this fireplace with a bro - ken glass door panel or without the glass door panel  Unlock Lock securely in place. For replacement part information see  L
                    
                    ページ20に含まれる内容の要旨 
                    
                        1 1 2 4 3 INSt ALLING LOGS, LAvA ROCK AND  FiREPLAcE iNSTALLATioN GLOWING EMbERS Continued Each log is marked with a number. These numbers will help you  5. Install rear brick panel first. Rest bottom edge of panel on back  identify the log when installing. It is very important to install these  edge of grate (see Figure 38). logs exactly as instructed. Do not modify logs. Only use logs sup- 6. Install top brick panel by resting on the top of the rear panel.  plied with fireplace. Hold the top b