Summary of the content on the page No. 1
Owner's Manual & Assembly Instructions
SP01
Model No. CM1014-A1 OB1014-C1
697.68103-C1 697.68104
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
714740408
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
BUILDING DIMENSIONS
* Size rounded off to the nearest foot
WHEN HANDLING METAL PARTS.
Summary of the content on the page No. 2
BEFORE YOU BEGIN.... A2 Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step se
Summary of the content on the page No. 3
PLAN AHEAD.... A3 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools. Tools and Materials: These are some basic tools and materials you will need for the construction of
Summary of the content on the page No. 4
SAFETY FIRST.... A4 Safety precautions are important to follow throughout the construction of your building. �Care must be taken when handling various �Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges. Please wear work gloves, eye operation of all power tools. protection and long sleeves when assembling or performing any maintenance on your build- ing. safety edge sharp edge sharp edge sa
Summary of the content on the page No. 5
CARE & MAINTENANCE.... A5 Web Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch- up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are avai
Summary of the content on the page No. 6
ACCESSORIES.... A6 WEB ROOF STRENGTHENING FLOOR FRAME KITS (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%. ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18m) of steel cable and 4 cable A simple new floor frame system made of heavy-duty, hot-dipped clamps. No digging or concrete galvanized steel.
Summary of the content on the page No. 7
THIS PAGE WAS LEFT BLANK INTENTIONALLY 7
Summary of the content on the page No. 8
THIS PAGE WAS LEFT BLANK INTENTIONALLY 8
Summary of the content on the page No. 9
121" 3,1m 121" 3,1m Foundation F09 The Foundation For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB1014-A or 68387-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.
Summary of the content on the page No. 10
Anchoring A10 Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. Recommended for use with any suggested base. holes provided in the frames for proper anchoring. Contains: 4 Anchors with Cable, Clamps and installation instruction. 1. 2. OVER THE BEAMS AND INTO THE GROUND
Summary of the content on the page No. 11
Hardware SP11 Remove from bag of screws and save for the last step 65900A 65103 #10Bx1/2" Black Screw (8) 65923 65004 #8-32 Hex Nut (192) (Packed with Screws) #8-32x3/8" Bolt (192) #8Ax5/16" Screw (438) 65109 67468 66646 #8-32 Acorn Nut (4) Peak Cap (2) 66045 Washer (453) (Packed with Screws) (Arrow Logo) Handle (2) (12 sheets of 40) 66183 66382 Roof Trim Cap 6228 66769 Lower Door Guide (4) (2 right & 2 left) Track Support (2) Door Slide (4) 67545 21' Weather Stripping (1) 11
Summary of the content on the page No. 12
Parts List BZ12 Part Part Quantity Check Number Description in Carton List 8576 Right Gable 2 8577 Left Gable 2 10497 Horizontal Door Brace 4 7743 Roof Panel 8 9984 Right Roof Panel 2 9983 Left Roof Panel 2 10475 Right Door 1 10475 Left Door 1 9369 Door Jamb 2 9373 Front Wall Panel 2 6515 Wall Panel 12 6020 Corner Panel 4 3719 Door Handle Brace 2 6278 Vertical Door Brace 2 6403 Door Track Splice 1 6892 Rt. Side Roof Trim 2 6893 Lt. Side Roof Trim 2 6015 Side Roof Trim 2 6869 Ridge C
Summary of the content on the page No. 13
NOTES GZ46
Summary of the content on the page No. 14
● ● ● ● ● 8934 Ramp (1) ● Parts Needed For ● ● ● ● ● ● 9367 Front Floor Frame (2) ● ● ● ● ● 8936 Rear Floor Frame (2) Step 1 Floor Frame Assemblies ● ● ● ● ● 10387 Side Floor Frame (4) SO14 The front floor frame is made up of three pieces. The side floor frames 9367 and the rear floor frame are made up of two pieces. The holes in these 8934 pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show 9367 the proper overall length for the sides, r
Summary of the content on the page No. 15
● ● ● ● ● 5986 Rear Wall Angle (2) ● Parts Needed For ● ● ● ● ● ● 10389 Rear Wall Channel (2) ● ● ● ● ● 10388 Side Wall Channel (4) Step 2 Frame Assemblies ● ● ● ● ● 10391 Side Wall Angle (4) SO15 The main frame pieces reinforce the walls. These pieces will later be in- Rear Wall Channel 10389 118 1/8" 3,0m stalled in the center and at the top edge of the side walls and the rear wall. Proceed as follows: 10389 1 Overlap the rear wall channel pieces as shown in the figure and Side Wall Channels f
Summary of the content on the page No. 16
● Parts Needed For ● ● ● ● ● ● 10386 Roof Beam (8) Step 3 Roof Beam Assemblies SO16 The roof beams join the two gables 10386 and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the cen- 10386 ter. The left and right roof beam as- semblies are made up of two pieces. Hint: These pieces are force-fitted, Roof Beam 159 3/8" 4,0m so you may have to press hard to join them together. STEP 1 Place the end of one roof beam 1 inside a second roof beam
Summary of the content on the page No. 17
● Parts Needed For ● ● ● ● ● ● 6403 Door Track Splice (1) ● ● ● ● ● 9366 Door Track (2) Step 4 Door Track Assembly A17 NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall. It is made up of three pieces. 6403 1 Using the door track splice, (painted), join the door track (galvanized) pieces end-to-end as shown. 66769 2 Insert four screws from the under- 9366 9366 side only. Long Leg on Top STEP STEP Hint: The holes in the top side
Summary of the content on the page No. 18
FRONT ● ● ● ● ● Front Floor Assembly (1) ● Parts Needed For ● ● ● ● ● ● Side Floor Assembly (2) Step 5 ● ● ● ● ● Rear Floor Assembly (1) Floor Frame SO18 RIGHT REAR 10387 STEP 1 Place the floor frame pieces that 8936 1 you assembled earlier on the foun- dation. Assemble the four corners of the floor frame using two screws at each corner as shown. At the front corners fasten bolts through from the bottom with nuts on top. RIGHT FRONT 10387 9367 2 Measure the floor frame diago- When Diagonal Meas
Summary of the content on the page No. 19
● ● ● ● ● 6515 Wall Panel (2) ● Parts Needed For ● ● ● ● ● ● 9373 Front Wall Panel (2) Step 6 Corners ● ● ● ● ● 6020 Corner Panel (4) SO19 Narrow NOTE Side The remainder of the building assembly 6020 requires many hours and more than one person. Do not continue beyond this point Wide Side if you do not have enough time to com- REAR plete the assembly today. A partially 6020 assembled building can be severely damaged by light winds. Each screw and bolt in the wall re- TOP VIEW SIDE SIDE quires a
Summary of the content on the page No. 20
FRONT ● Parts Needed For ● ● ● ● ● ● Rear Wall Channel Assembly (1) Step 7 ● ● ● ● ● Side Wall Channel Assembly (2) Mid Frames SO20 The mid frame pieces give rigidity to the side and rear walls. 1 Fasten the rear wall channel across the middle of the rear wall using screws. 2 Fasten the side wall channels across the middle of the side panels using screws. Fasten overlaps in rear corners with bolts and nuts, at two locations. See the figure. NOTE The wall channels behind the front wall panels w