Resumo do conteúdo contido na página número 1 
                    
                        GOLD CGs
Gas-Fired Water Boilers
� Installation � Maintenance
Boiler Manual
� Startup � Parts
 This manual must only be used by a qualifi ed heating installer/service technician. Before installing, read all 
instructions, including this manual, the burner manual and any related supplements. Perform steps in the order 
given. Failure to comply could result in severe personal injury, death or substantial property damage. 
 DO NOT USE BOILER DURING CONSTRUCTION unless you provide dust-free air to th
                    
                    Resumo do conteúdo contido na página número 2 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual How it works . . .  Control module ① The control module responds to signals from the room thermostat, air pressure switch and  boiler limit circuit to operate the boiler circulator, pilot burner, gas valve and inducer. When  room thermostat calls for heat, the control module starts the system circulator and inducer. The control module runs the inducer long enough to purge the boiler fl ue passages, then opens  the pilot valve and activates pilot ign
                    
                    Resumo do conteúdo contido na página número 3 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual GOLD CGs Gas-Fired Induced-Draft Water Boiler 3 Part number 550-110-260/0508                                                                                                                                                                                                                                                                                                                                                                                        
                    
                    Resumo do conteúdo contido na página número 4 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual Contents  How it works ....................................................2–3  Hazard defi nitions ............................................... 4  Please read before proceeding ............................ 5   1 Prepare boiler location ...................................6–11   2 Prepare boiler ...............................................12–13   3 Water piping .................................................14–23   4 Venting & combustion air 
                    
                    Resumo do conteúdo contido na página número 5 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual Please read before proceeding Installer User • This manual is for use only by your qualifi ed   Read all instructions before in- heating installer/service technician. stalling. Follow all instructions in  • Please refer to the User’s Information Manual for  proper order to prevent personal  your reference. injury or death. • We recommend regular service by a qualifi ed  • Also refer to CGs Venting Supplements. service technician, at least annually. •
                    
                    Resumo do conteúdo contido na página número 6 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1a Prepare boiler location — codes & checklist Installations must follow these codes: • Local, state, provincial, and national codes, laws, regulations and ordinances. • National Fuel Gas Code, ANSI Z223.1–latest edition. • Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ ASME CSD-1, when required. • National Electrical Code. • For Canada only: B149.1 or B149.2 Installation Code, CSA C22.1 Canadian Electri- cal Code P
                    
                    Resumo do conteúdo contido na página número 7 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1b Prepare boiler location — clearances Recommended SERVICE clearances  Figure 2 Required MINIMUM clearances (Fig. 1) 1. Provide clearances for cleaning and servicing the boiler and for  access to controls and components. See Figure 1 for recommenda- tions. 2. Provide at least screwdriver clearance to jacket front panel screws  for removal of front panel for inspection and minor service. If  unable to provide at least screwdriver clearance, install
                    
                    Resumo do conteúdo contido na página número 8 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1c Prepare boiler location — vent system  Failure to follow all instructions can result in fl ue gas spillage and carbon monoxide emissions, causing severe  personal injury or death.  Inspect existing chimney before installing boiler. Failure to clean or replace perforated pipe or tile lining will cause  severe personal injury or death.  DO NOT COMMON VENT — Do not install the CGs into a common vent with any other appliance. This will  cause fl ue ga
                    
                    Resumo do conteúdo contido na página número 9 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1d Prepare boiler location — contamination Please review the following information on potential Refer to Table 1 for products and areas which may cause  combustion air contamination problems. contaminated combustion air.  To prevent potential of severe personal injury or death, check for products or areas listed  below before installing boiler. If any of these contaminants are found: • remove contaminants permanently     — OR — • isolate boiler and
                    
                    Resumo do conteúdo contido na página número 10 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1e Prepare boiler location — air openings mended in Figure 3 will allow adequate ventilation and   Combustion air opening location and sizing  combustion air provided the boiler room is not sub- requirements depend on the clearances around  jected to negative pressure due to exhaust fans or other  the boiler. Check the boiler placement compared to  mechanical ventilation devices. Refer to the National  Figure 1, page 7. Fuel Gas Code for dealing wi
                    
                    Resumo do conteúdo contido na página número 11 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual Figure 3 Sizing air openings for CGs installations ✷ 11 Part number 550-110-260/0508                                                                                                                                                                                                                                                                                                                                                                                
                    
                    Resumo do conteúdo contido na página número 12 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 2a Prepare boiler — placement & setup  Inlet air box top panel must be in  Place boiler/crate near position during boiler operation.  position Failure to do so could result in  severe personal injury, death or  1. Leave boiler in crate and on pallet until installation  substantial property damage. site is ready. 2. Move entire crate and pallet next to selected loca- Orifi ce replacement procedure tion. 3. Remove crate. (when required) 4. Remove boil
                    
                    Resumo do conteúdo contido na página número 13 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 2b Prepare boiler — pressure test 5. Slowly reopen boiler drain valve until test pressure  Hydrostatic pressure test on the pressure/temperature gauge reaches no more  Pressure test boiler before attaching water or gas piping  than: (except as noted below) or electrical supply. • 45 psig for boilers with 30 psig relief valve. Prepare boiler for test • 75 psig for boilers with 50 psig relief valve. 1. Remove the shipping nipple (from CGs supply tap-
                    
                    Resumo do conteúdo contido na página número 14 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3a Water piping — general information General piping information Circulator If installation is to comply with ASME or Canadian requirements, an ad- The circulator is shipped loose (wiring pre-attached to  ditional high temperature limit is needed. Install control in supply piping  boiler) to allow you to locate it either in the return or  between boiler and isolation valve. Set second control to minimum 20°F  supply piping, as desired. See page 3 f
                    
                    Resumo do conteúdo contido na página número 15 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3b Water piping — single-zone system Diaphragm-type or bladder- Closed-type expansion tank type expansion tank (Figure 4) (Figure 5) 1. Ensure expansion tank size will handle boiler and 1. Ensure expansion tank size will handle boiler and  system water volume and temperature. Tank must system water volume and temperature. See tank  be located in boiler return piping as close to boiler manufacturer’s instructions for details. as possible, before inl
                    
                    Resumo do conteúdo contido na página número 16 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3c Water piping — multiple zones Piping multiple zones Piping for radiant heating  Follow instructions on pages 14 and 15 to install near- systems or converted gravity  boiler or single-zone piping. (Also refer to Piping for  systems radiant heating systems or converted gravity sys- tems, below, if applicable.) Converted gravity (or steam) systems See Figure 6 or Figure 7, page 17, to complete instal- Whenever possible, use the primary/secondary pi
                    
                    Resumo do conteúdo contido na página número 17 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3c Water piping — multiple zones (continued) Figure 6 Zoning with circulators Figure 7 Zoning with zone valves — return water 130°F or higher. — return water 130°F or higher. 1 Boiler isolation (balancing) 10 Automatic air vent (with diaphragm-type expansion tank), or connect  valves to tank fi tting (closed-type expansion tank). DO NOT use an automatic  air vent when using closed-type expansion tank. It would allow air to  leave the system, causing
                    
                    Resumo do conteúdo contido na página número 18 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems the water temperature being supplied to the radiant  Primary/secondary (preferred)  tubing. bypass piping method Gauge 8 is required on all systems to assure the return  Primary/secondary bypass piping is preferred because  water temperature is accurately set for a minimum of  the flow rate and temperature drop in the heating  130°F. If this gauge is not available however, adjust the  circuit(s) is determined only by th
                    
                    Resumo do conteúdo contido na página número 19 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems (continued) Figure 8 Primary/secondary piping Figure 9 Primary/secondary piping Zoning with circulators Zoning with zone valves   9 Relief valve 1 Boiler isolation (balancing) valves 10 Automatic air vent (with diaphragm-type expansion tank), or  2 Flow/check valve connect to tank fi tting (closed-type expansion tank). DO NOT  use an automatic air vent when using closed-type expansion  3 System or zone circulator tank. I
                    
                    Resumo do conteúdo contido na página número 20 
                    
                        GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems (continued) justed using cold (or room temperature) return water  BOILER-bypass piping to the boiler. (When setting the valves without gauge  method 4a installed — using cold or room temperature water  — assume the return water temperature to be 60°F. Set  This piping method (Figures 10 and 11, page 21) is  the valves so gauge 8 reads at least 120°F. called a boiler-bypass because part of the circulator  Gauge 4b is opt