Resumo do conteúdo contido na página número 1 
                    
                        The Intrepid 
Multi-Fuel Heater
Model 1695CE
Homeowner’s 
Installation 
and Operating 
Manual
For use in Europe
0970
Intrepid Multi Cover
1/01
SAFETY NOTICE: IF THIS APPLIANCE IS NOT PROPERLY INSTALLED, OPERATED AND 
MAINTAINED, A HOUSE FIRE MAY RESULT. 
TO REDUCE THE RISK OF FIRE, FOLLOW THE INSTALLATION INSTRUCTIONS. FAILURE TO 
FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE, BODILY INJURY OR EVEN 
DEATH. CONTACT LOCAL BUILDING OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION 
INSPECTION REQUI
                    
                    Resumo do conteúdo contido na página número 2 
                    
                        Vermont Castings Intrepid Multi-Fuel Welcome Congratulations on your choice of a Vermont Castings Intrepid Multi-Fuel Heater. With this purchase, you  made a commitment to make the hearth a place of warmth, beauty and comfort in your home. At Vermont  Castings we share that joy and appreciation for the hearth, and we show it in all our cast-iron stoves and fire- places. As you become acquainted with your new stove, you will find the aesthetic appeal of cast iron is matched by  its superb capacity 
                    
                    Resumo do conteúdo contido na página número 3 
                    
                        Vermont Castings Intrepid Multi-Fuel Specifications Intrepid Multi-Fuel, Model 1695CE, 1696CE, 1697CE 2   Wood Smokeless Fuel Width (leg-to-leg) .................................. 546 mm (21 ¹⁄₂”) 1 1 Nominal heat output 7.5 kW 6.4kW Depth (leg-to-leg) ................................. 349 mm (13 ³⁄₄”)   (25,500 BTU/hr)  (21,750 BTU/hr) Height to top of flue collar: Minimum flue draught 12 Pa  12Pa    with regular legs .......................635 mm (25”) top exit   (0.048” WG) (0.048”WG)   ........
                    
                    Resumo do conteúdo contido na página número 4 
                    
                        Vermont Castings Intrepid Multi-Fuel Installation SAFETY NOTICE:  IF YOUR STOVE IS NOT PROP- When poor draft is caused by a low infiltration rate,  ERLY INSTALLED,  A HOUSE FIRE MAY RESULT.   opening a ground floor window on the windward side  TO REDUCE THE RISK OF FIRE, FOLLOW THE  of the house and in the vicinity of the stove will usually  INSTALLATION INSTRUCTIONS.  CONTACT LOCAL  alleviate the problem. BUILDING OR FIRE OFFICIALS ABOUT RESTRIC- Another solution is to install a permanent outside
                    
                    Resumo do conteúdo contido na página número 5 
                    
                        Vermont Castings Intrepid Multi-Fuel Connecting Flue Pipes Masonry Chimneys Connector pipes should meet the requirements of the  An inspection of the chimney must confirm that it has  building regulations. This can be achieved by the use  a lining.  Do not use an unlined chimney. The chimney  connecting fluepipes included in the following catego- should have no cracks, loose mortar, other signs of  ries: deterioration, or blockage.  Repair any defects before  a) Vitreous enamelled steel pipe compl
                    
                    Resumo do conteúdo contido na página número 6 
                    
                        Vermont Castings Intrepid Multi-Fuel These adaptors are designed so the top end will fit  the stove and chimney.  Using connectors and chim- outside the inner wall of the chimney, and the bottom  neys from the same manufacturer makes the assembly  end will fit inside the first section of chimney connector.   and installation straightforward. When assembled in this way, any soot or creosote fall- NOTE:  For installations using double-wall con- ing from the inner walls of the chimney will stay inside
                    
                    Resumo do conteúdo contido na página número 7 
                    
                        Vermont Castings Intrepid Multi-Fuel face of the flue liner, and cemented securely in place.   Fireplace Chimney Installations -  Additional pieces of connector are then attached with  Through a Fireplace sheet metal screws.   If your fireplace height is at least 635 mm (25”), you  Fireplace Chimney Installations -  may install an Intrepid Multi-fuel with standard legs  Above a Fireplace through the fireplace opening using a 90° Tee kit avail- The Intrepid Multi-fuel may be connected to a chimney a
                    
                    Resumo do conteúdo contido na página número 8 
                    
                        Vermont Castings Intrepid Multi-Fuel Always adhere to local building codes when installing a  wall pass-through. Figure 7 shows a method of passing a connector  through a wall. All combustible material in the wall is  cut away to provide the required clearance that is three  times the pipe diameter. The resulting space must re- main empty. A flush-mounted sheet metal cover may be  used on one side only. If covers must be used on both  sides, each cover must be mounted on noncombustible  spacers a
                    
                    Resumo do conteúdo contido na página número 9 
                    
                        Vermont Castings Intrepid Multi-Fuel Costructional Hearth  Dimensions as below At least 150 mm  or to a suitable  heat resistant wall Appliance Appliance Doors Doors Hearth Surface  Free of Com- At least  bustible Material 150 mm Perimeter should be  Perimeter should be  clearly marked e.g.  clearly marked e.g.  edge of superimposed  At least  edge of superimposed  hearth hearth 300 mm  a) Fireplace recess b) Free standing ST912 Fig. 9  Noncombustible hearth surface dimensions. with noncombustib
                    
                    Resumo do conteúdo contido na página número 10 
                    
                        Vermont Castings Intrepid Multi-Fuel Connecting Flue Pipe - Clearances Single wall connecting fluepipes can reach extremely  high temperatures; therefore, clearances from the con- B necting fluepipe (chimney connector) must comply with  the requirements of Part J of Building Regulations 2000  (Combustion Appliances and Fuel Storage Systems).  This can be achieved by following the recommenda- A tions of Approved Document ‘J’. These are as shown in  Figure 11. ST486a Fig. 10  Minimum clearances. at 
                    
                    Resumo do conteúdo contido na página número 11 
                    
                        Vermont Castings Intrepid Multi-Fuel Assembly Clean the Griddle Before Use At the factory we coat the griddle with vegetable oil to  prevent rusting while the stove is in transit and storage.  10 ³⁄₄" Remove the oil with a dry rag or paper towel before you  use the stove.  Set Up the Stove 9 ³⁄₄" Remove the griddle, front grate bar, the bottom grate,  the side bricks, and the ash pan from inside the stove.  Place a protective pad on the floor, arrange some sec- ST512 tions of 4 x 4 lumber on the 
                    
                    Resumo do conteúdo contido na página número 12 
                    
                        Vermont Castings Intrepid Multi-Fuel Attach the Griddle Handle Install the handle on the griddle. Place the griddle  upside down at the edge of a flat surface and assemble  the handle as shown. (Fig. 16)  With the handle pointing 45° from its final position,  tighten the nut as far as possible with pliers. Move the  handle to its final position while still holding the nut with  the pliers.   ST516 Fig. 16  Attaching the griddle handle. Operation ST516  With some experimentation, you will soon disco
                    
                    Resumo do conteúdo contido na página número 13 
                    
                        INTREPID  II Vermont Castings Intrepid Multi-Fuel Side View Open (Updraft Mode) ST521a Fig. 20  Top loading is the best way to add fuel during regular  use. Front loading is useful for kindling a fire. ST521 Intrepid To open the front doors, insert the handle into the door  loading latch stub and turn it to the left and up. To close them,  11/00 Closed always close the left door first. Turn the handle in the  (Bypass Mode) right door to the left and up (to the open position) and  ST519 close the d
                    
                    Resumo do conteúdo contido na página número 14 
                    
                        Vermont Castings Intrepid Multi-Fuel Burn only high quality wood or smokeless solid fuels in  Use the Air Control Settings the Intrepid Multi-Fuel, and burn it directly on the grate.   that Work Best for You Do not elevate the fuel. No single air control setting will fit every situation. Set- The damper must be open when starting a fire or  tings will differ depending on the quality of the fuel, the  when refueling.  amount of heat desired, and how long you wish the fire  1. Open the stove damper, 
                    
                    Resumo do conteúdo contido na página número 15 
                    
                        Vermont Castings Intrepid Multi-Fuel Once the draft is established, open the front door and  light the rest of the fuel from the bottom. Do not light the  main bed of fuel until the chimney begins drawing, and  repeat the procedure as often as necessary if the initial  attempt is unsuccessful. 4. If your stove has been broken-in previously using  Steps 1-3, continue to build the fire gradually. Add  larger wood with a diameter of 76-102 mm (3-4”), as  in Figure 23. Continue adding split logs of t
                    
                    Resumo do conteúdo contido na página número 16 
                    
                        Vermont Castings Intrepid Multi-Fuel Draft Management A stove is part of a system, which includes the chimney,  be a disadvantage. Hot gases cool off through expansion;  the operator, the fuel, and the home. The other parts of the  if we vent a stove with a 152 mm (6”) flue collar [181 sq  system will affect how well the stove works. When there is  cm(28 square inch) area] into a 254 x 254 mm (10 x 10”)  a good match between all the parts, the system works well.  flue, the gases expand to over thr
                    
                    Resumo do conteúdo contido na página número 17 
                    
                        Vermont Castings Intrepid Multi-Fuel - so use whatever combination of installation features and  Draft Testing operational steps will encourage good draft and minimize  An easy way to test your chimney draft is to close the  creosote production. stove’s damper, wait a few minutes to let the airflow stabi- Because letting the smoke cool off and slow down is one  lize, then see whether you can vary the strength of the fire  of the keys to creosote production, it makes sense to  by swinging the air c
                    
                    Resumo do conteúdo contido na página número 18 
                    
                        Vermont Castings Intrepid Multi-Fuel Maintenance  Place the gasket in its channel; make sure that its  Let the fire in the stove go out and allow the stove to  outer edge fits against the cast iron surround ridge. cool completely before beginning any maintenance  3. Install the glass. Lay the glass on the inner gasket  procedure. with the coated side down (toward the outside of the  Care of the Cast Iron Surface door). Tighten the screws snugly, but loose enough  to allow for a little movement of 
                    
                    Resumo do conteúdo contido na página número 19 
                    
                        IN T R E PI D II Vermont Castings Intrepid Multi-Fuel Damper Adjustment Thermostat Lever When the stove damper is closed, the pressure of the  rod against the damper plate assures a good seal be- tween the damper and the damper housing. Adjustment  may be needed after a period of time to retain adequate  pressure. To make this adjustment, start with the damper in the  closed and locked position. (Fig. 28) Loosen the 7/16”  locking nut in the center of the damper. Use a 1/8” Allen  wrench to turn
                    
                    Resumo do conteúdo contido na página número 20 
                    
                        Vermont Castings Intrepid Multi-Fuel Wait until the fire is out and the stove has cooled. Be  7. For doors, replace the doors and close them on  sure to follow the standard safety procedure for working  a piece of waxed paper to keep the cement from  with dusty materials: Wear safety goggles and a dust  migrating onto the stove front, or tap other parts with  mask. the rubber mallet (or hammer/block of wood). 8. Clean excess cement from around the channel. Let  The procedure for replacing the gas