Resumo do conteúdo contido na página número 1 
                    
                         
 
 
 
OWNER`S MANUAL 
DROLET EPA WOODSTOVES 
 
 HT-1200 HT-1600 HT-2000 
 
 
 
 
US ENVIRONMENTAL PROTECTION 
AGENCY PHASE II CERTIFIED 
WOODSTOVES 
 
 
Vérified and tested following 
ULC S627  et UL 1482 Standards by: 
 
Intertek Testing Services 
 
 
 
 
 
READ AND KEEP THIS MANUAL FOR REFERENCE 
 
Manufactured by : STOVE BUILDER INTERNATIONAL INC. 
1700, Léon-Harmel, Québec (Québec) G1N 4R9 
Tel : ( 418 ) 527-3060 
Fax : ( 418 ) 527-4311 
www.drolet.ca 
 
 
  990810/45060A_Feb 03           
                    
                    Resumo do conteúdo contido na página número 2 
                    
                        TABLE OF CONTENTS    INTRODUCTION................................................................................................................. 2  TECHNICAL SPECIFICATIONS ......................................................................................... 3  ASSEMBLY......................................................................................................................... 4  PEDESTAL AND DECORATIVE SIDEWALL INSTALLATION........................................ 4  BRICKS INS
                    
                    Resumo do conteúdo contido na página número 3 
                    
                        INTRODUCTION    SBI INC., one of the most important wood stove and fireplace manufacturers in Canada,  congratulates you on your purchase and wishes to help you get maximum satisfaction from  your wood stove.  In the pages that follow, we will give you advice on wood heating and  controlled combustion as well as technical specifications regarding installation, operation  and maintenance of the model you have chosen.    The instructions pertaining to the installation of your wood stove comply wit
                    
                    Resumo do conteúdo contido na página número 4 
                    
                        TECHNICAL SPECIFICATIONS     HT-1200 HT-1600 HT-2000  Combustion Type: Wood Wood Wood  2 2 2 Recommended Surface 600 à 1 200 ft 900 à 1 600 ft 1 000 à 2 000 ft 2 2 2  (56 à 112 m ) (84 à 149 m ) (93 à 186 m )  36 000 BTU/h 40 000 BTU/h 60 200 BTU/h  Heating Capacity : E.P.A :  (10,5kW) (11,7 kW) (17,6 kW)  45 000 BTU/h 70 000 BTU/h 95 000 BTU/h   Real :  (13,2 kW) (20,5 kW) (27,8 kW)  Efficiency : 73% 71,3% 72,2%  Average Emission: 6,5 g/h 3,3 g/h 3,8 g/h  Colours : Standard Models : Metallic Bl
                    
                    Resumo do conteúdo contido na página número 5 
                    
                        ASSEMBLY    PEDESTAL AND DECORATIVE SIDEWALL INSTALLATION    Pedestal Installation :  1. Remove all bricks and insulations in  the appliance.  2. Slowly, lay down the stove on his  back.    3. Install legs or the pedestal with the  supplied nuts and bolts.  Stand up  the stove and place it with the  required clearances.  Note that  there is eight holes in the bottom of  the stove but only four will align with  the pedestal.  4. Slide the front part of the pedestal  base around the pedestal and f
                    
                    Resumo do conteúdo contido na página número 6 
                    
                           BRICKS INSTALLATION (HT-1200)    • Refractory bricks are to be installed  according to figure 4.  • In both stoves, the baffle brick must be  pushed as close to the front as possible  onto its metallic support.  • The upper bricks (2) must lay on the  vertical bricks (4) grove  • Note that a plain brick is supplied  instead of a ashtray cap on standard  models.      Figure 3:  HT-1200 &     HT-1200   DELUXE Bricks     5                                                                          
                    
                    Resumo do conteúdo contido na página número 7 
                    
                        BRICKS AND INSULATION INSTALLATION (HT-1600)    1. Remove from the stove all bricks and insulation.  2. Install all side bricks (12 x 4 1/2" x 9")  3. Install the back bricks (6 x  4 1/2" x 9")  4. Install the bottom bricks (4 x 4 1/2" x 9") +  (2 x 6 " x  8") + (1 x  6" x 2")  for HT-1600  and (4 x  4 1/2" x 9") + (2 x  6" x  7") for HT-1600 Deluxe.  5. Install the "T" shape support and the bricks (4 x  4 1/2" x 9") + (2 x  3" x  9").  6. Install the baffle bricks (4 x 4 1/2" x 9") + (2 x 3" x 
                    
                    Resumo do conteúdo contido na página número 8 
                    
                        BRICK AND INSULATION INSTALLATION (HT-2000)    The stove is normally supplied with secondary air tubes in position.  To install the baffle bricks  and white ceramic insulation, it’s necessary to remove the two front secondary air tubes.  First  place only one baffle brick  and one white ceramic insulation.  Use the same method to put the  other baffle brick and insulation.  Put back in place the secondary air tubes.    Install the yellow insulation and the 6" x 8" or 6" x 6" bricks.  Install the
                    
                    Resumo do conteúdo contido na página número 9 
                    
                        AIR TUBES INSTALLATION (HT-2000):    The secondary air tubes are painted different colours . The back tube is yellow, the middle  on is red and the front is unpainted. Before installing, make sure the locating holes in the  tubes (holes near one end of the tube) are on the left side. Insert one tube in the right side  air channel and slide it to the right as much as possible. Bring the left end of the tube aligned  with the ring welded to the left air channel. Move the tube to the left until the
                    
                    Resumo do conteúdo contido na página número 10 
                    
                        DOOR ADJUSTMENT  In order for your stove to operate properly, the door should be adjusted periodically to  provide an air tight fit.  To adjust:    • Remove the lock pin (spring pin) by pulling and turning it using pliers ("wise grip")  • Turn the handle counter clock wise one turn to increase pressure  • Re-install the lock pin (spring pin) with a small hammer                Figure 7: Door Adjustment     9                                                                                          
                    
                    Resumo do conteúdo contido na página número 11 
                    
                        THE BENEFITS OF INSTALLING A BLOWER  A blower can be installed at the back of your DROLET stove.  This option is necessary if you  wish to redistribute into a room the heat trapped at the back of your stove. By forcing hot air  toward the front, the blower enables you to extend the radiation power of your stove.   You can purchase this option through your DROLET dealer.  Make sure to specify this part  number: #AC02050.  You can also install a thermodisc to enable the blower to start or stop  au
                    
                    Resumo do conteúdo contido na página número 12 
                    
                        INSTALLATION  SAFETY NOTICE    • IF THIS STOVE IS NOT PROPERLY INSTALLED, A HOUSE FIRE MAY RESULT.  TO REDUCE THE RISK  OF FIRE, FOLLOW THE INSTALLATION INSTRUCTIONS.  FAILURE TO FOLLOW INSTRUCTIONS MAY  RESULT IN PROPERTY DAMAGE, BODILY INJURY, OR EVEN DEATH.  • CONSULT YOUR MUNICIPAL BUILDING DEPARTMENT OR FIRE OFFICIALS ABOUT RESTRICTIONS AND  INSTALLATIONS REQUIREMENTS IN YOUR AREA.  • USE SMOKE DETECTORS IN THE ROOM WHERE YOUR STOVE IS INSTALLED.  • KEEP FURNITURE AND DRAPES WELL AWAY FROM 
                    
                    Resumo do conteúdo contido na página número 13 
                    
                        FLOOR PROTECTOR  Your wood stove should be placed on a non-combustible surface. The floor protector should  be under the stove, eighteen inches beyond the front and eight inches beyond each side of  the fuel loading and ash removal opening.  If there is a horizontal section of chimney  connector, the floor protector should go under it and two inches beyond each side.      The floor protector should exceed the stove as follows:        FRONT SIDES BACK      18’’ 8’’ 8’’  (460 mm) (200 mm) (200 mm)
                    
                    Resumo do conteúdo contido na página número 14 
                    
                        CLEARANCES    It is of utmost importance that the clearances to combustible material be scrupulously  respected upon installation of the stove you have selected. Refer to the tables below :      Figure 8: Clearances to combustibles    CANADA Single pipe / Double pipe  Model A B C D E F  HT-1200 15/10 16/16 10/8 20.3/15.3 27.3/27.3 21.8/19.8 HT-1200 Deluxe 15/10 8/8 7/6 20.4/15.4 20/20 19.4/18.4 HT-1600 15/12 16/16 12/10 20.8/17.8 28.7/28.7 25.2/23.2 HT-1600 Deluxe 15/12 14/12 12/8 20.8/17.8 27.2
                    
                    Resumo do conteúdo contido na página número 15 
                    
                        REDUCED CLEARANCES  You may decrease the clearances by installing heat radiation shields between the walls or  the ceiling and the stove.  These heat radiation shields must be installed permanently, and  can include sheet metal, a rigid non-combustible sheet or a masonry wall.    Clearances of not less than 1" (25 mm) and not more than 3" (76 mm) between the bottom  of the shield and the floor and not less than 3" (76 mm) between the top of the shield and  the ceiling must be respected to allow 
                    
                    Resumo do conteúdo contido na página número 16 
                    
                        CHIMNEY  Your wood stove may be hooked up with a factory built or masonry chimney.  If you are  using a factory built chimney, it must comply with UL 103 or ULC S629 standards; therefore  it must be a Type HT (2100°F).  It is extremely important that it be installed according to the  manufacturer's specifications.    If you are using a masonry chimney, it is important that it be built in compliance with the  specifications of the National Building Code.  It must be lined with fire clay bricks, m
                    
                    Resumo do conteúdo contido na página número 17 
                    
                        CHIMNEY CONNECTOR (STOVE PIPE)  Your chimney connector and chimney must have the same diameter as the stove outlet.  If  this is not the case, we recommend you contact your dealer in order to insure there will be  no problem with the draught.  The stove pipe must be made of aluminized or cold roll steel with a minimum thickness of  0.021" or 0.53 mm.  It is strictly forbidden to use galvanized steel.  Your smoke pipe should be assembled in such a way that the male section of the pipe faces  down
                    
                    Resumo do conteúdo contido na página número 18 
                    
                        TYPICAL INSTALLATIONS  FACTORY BUILT CHIMNEY:           RAIN CAP ROOF FLASHING 18" CLEARANCE RADIATION SHIELD WALL RADIATION SHIELD WALL  SUPPORT CEILING SUPPORT    Wall installation Vertical installation     17                                                                                                                                                                                                                                                                                                 
                    
                    Resumo do conteúdo contido na página número 19 
                    
                        MASONRY CHIMNEY:          Clay liner  Thimble  Clean out    door     18                                                                                                                                                                                                                                                                                                                                                                                                                                             
                    
                    Resumo do conteúdo contido na página número 20 
                    
                        FACTORY BUILT THIMBLE:         19