Resumo do conteúdo contido na página número 1 
                    
                        
                    
                    Resumo do conteúdo contido na página número 2 
                    
                        BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows: 1) All equipment other than as specified below:  years parts and 1 year labor  . ) Electronic circuit and/or control boards: parts and labor for 3 years. 3) Compressors on refrigeration equipment: 5 years parts and 1 year labor. 4) Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis:  parts and labor for 3 years or 30,000 
                    
                    Resumo do conteúdo contido na página número 3 
                    
                        
                    
                    Resumo do conteúdo contido na página número 4 
                    
                        ELECTRICAL REQUIREMENTS The 10 volt and 40 volt grinders have an attached cordset and requires -wire, grounded service rated  10  volts ac and 40 volts ac, 15 amp, single phase, 60 Hz. The 30 volt grinders have a power connector and  requires -wire, grounded service rated 30 volts ac, 15 amp, single phase, 50 Hz. INITIAL SET-UP CAUTION - Unplug the grinder throughout the initial set-up. 1. Open the top lid. Clear all foreign objects and shipping materials from the hopper compartment and 
                    
                    Resumo do conteúdo contido na página número 5 
                    
                        COFFEE GRINDING 1. Turn the selector knob to align the red arrow with the desired grind. . Raise the top lid and add the whole bean coffee. Close the top lid. 3. Locate the back of a bag behind the dispense chute. (The grinder will not operate unless the bag is behind  the chute.) 4. Allow the bag to rest on the screen beneath the chute. 5. Press the start switch. 6. Flip the cleaning lever a few times as dispensing slows. 7. Remove the bag when ground coffee is no longer dispensed from the chu
                    
                    Resumo do conteúdo contido na página número 6 
                    
                        TROUBLESHOOTING A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems  encountered.  If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic  Technical Service Department. • Inspection, testing, and repair of electrical equipment should be performed only by qualified service person- nel. WARNING – • Exercise extreme caution when servicing electrical equipment.   • Disconnect the grinder from the power source w
                    
                    Resumo do conteúdo contido na página número 7 
                    
                        TROUBLESHOOTING (cont.) PROBABLE CAUSE PROBLEM REMEDY 3. Bag Sensor. (cont.) Grinder will not start. (cont.) (B) Refer to Service - Bag Sensor  Switch for testing and adjustment  procedures. See page 9. 4. Motor overload protector. Remove the plug located on the  right side of the housing. Press the  red “Reset” button visible through  the opening. Listen carefully for a  “click”. This resets the motor protec- tion circuit and may indicate that an  overload has been encountered by  the motor. (A
                    
                    Resumo do conteúdo contido na página número 8 
                    
                        TROUBLESHOOTING (cont.) PROBLEM REMEDY PROBABLE CAUSE Grinder starts, but will not dis- Coffee must be poured into hopper  1. Hopper pense. before grinding. Foreign materials must not block  . Entrance to grind chamber the opening at the bottom of the  hopper. Remove both black fillister head  3.Shear Plate  screws holding the grinder selector  dial plate to the grinder. Carefully  remove the dial plate and rotor cup.  Inspect the shear plate for wear.  Replace if excessively worn or dam- aged.
                    
                    Resumo do conteúdo contido na página número 9 
                    
                        
                    
                    Resumo do conteúdo contido na página número 10 
                    
                        
                    
                    Resumo do conteúdo contido na página número 11 
                    
                        SERVICE (cont,) AC MOTOR AND GRIND CHAMBER (cont.) 11. Clean all grinding burrs and mounting surfaces  before reassembly. 4. Check the voltage across the white, red or red/ 1. Install the four .50”-  0 cage nuts on the new  black and white/blue wires on terminals L1 &  motor. L with a voltmeter.  Connect the grinder to the  13. Place the new motor with hopper collar and bush- power source. When the Off/On/Start switch is  ing into position on the bushings on the motor  momentarily placed in 
                    
                    Resumo do conteúdo contido na página número 12 
                    
                        
                    
                    Resumo do conteúdo contido na página número 13 
                    
                        
                    
                    Resumo do conteúdo contido na página número 14 
                    
                        
                    
                    Resumo do conteúdo contido na página número 15 
                    
                        
                    
                    Resumo do conteúdo contido na página número 16 
                    
                        
                    
                    Resumo do conteúdo contido na página número 17 
                    
                        
                    
                    Resumo do conteúdo contido na página número 18 
                    
                        
                    
                    Resumo do conteúdo contido na página número 19 
                    
                        
                    
                    Resumo do conteúdo contido na página número 20 
                    
                        SCHEMATIC WIRING DIAGRAM G1, G2 & G3 L1 N  GRN  SW1  K-2 or K-7  BLK WHI/RED WHI/BLU WHI  M  L1 L2  K-4  K-6  WHI/VIO  120 VOLT AC  K-8 or K-9   2 WIRE SW2  SINGLE PHASE 60 HZ  WHI/ORA  WHI/VIO WHI  K  1 or A 0 or B  10190.0000G  07/05  ©  1985 BUNN-O-MATIC CORPORATION  10191 070306 0