Inhaltszusammenfassung zur Seite Nr. 1 
                    
                        YY-W2xx  
Pedestal Server Chassis 
YY-R5xx 
5U Rackmount Server Chassis 
Installation Guide
2005.04. Version B 
1
ZZ17-W2001-B                                                                                                                                                                                                                                                                                                                                                                                      
                    
                    Inhaltszusammenfassung zur Seite Nr. 2 
                    
                        INDEX 1. Introduction 2. Hardware Packing List  3. System Installation  3.1.Chassis Open  3.2.Motherboard Installation  3.3.Add-on Card Installation  3.4.CD–ROM Drive/FDD Installation.  3.5.Fixed HDD Cage , HDD Installation  3.6.Instructions for Switches and LED Indicators on front panel  3.7.Instructions for cooling fan assembly  3.8.Rack Mount Sliding Rails Installation  4.1 System Assembly   4. Introduction of IDE/SCSI/SATA multi-bay backplane  modules   5. How to change versatile as Rackmoun
                    
                    Inhaltszusammenfassung zur Seite Nr. 3 
                    
                        1. INTRODUCTION  YY-W2 series Server Chassis is designed in compliant with EEB3.0  specification (refer to www.ssiforum.org) and ATXV2.1 (refer to  www.formfactors.org)  Mother Board:   YY-W2 is designed for extended ATX (12"x13"), in compliant  with ATX spec, CEB and EEB3.0 spec.  Storage:    The chassis supply drive bays with flexible configuration:    A type : Supply 8 x 5.25" + 2 x 3.5” HDD drive bays    B type: Supply 5 x 5.25"drive bays and 7 x 3.5" HDD drive  bays, i.e. A type plus HDD fi
                    
                    Inhaltszusammenfassung zur Seite Nr. 4 
                    
                        Thermal Solution:   One(1) 120x120mm Cooling Fan is installed, rear mounted   Options of two (2) 60*60*25mm, rear mounted. Switches and LED Indicators on front panel    Power Switch (Push Switch)   Reset Button (Push Switch)   Power On LED (Green)   HDD LED (Orange flash)  FAN ALARM (Red)    LAN LED (Green/Flash) X 2   Power Fail LED [optional /reserved for Power Failure Signal]   USB Ports X 4, Audio ports [Optional] Rack Mount Rail: (Optional)   24Inch Sliding Rails   Chassis Dimensions & Weig
                    
                    Inhaltszusammenfassung zur Seite Nr. 5 
                    
                        2. Hardware Packing List  When you unpack your YY-W2 Server Chassis, check that all the  items that you ordered are present in good condition. Review the  inventory checklist below to be sure that the components and  optional components that you ordered are included. If anything is  missing or damage, contact your retailer as soon as possible. Don’t  use any uncertified material or components in this system.   Chassis  A type   B type   C type  ATA IDE   SCSI   SATA  Raid Module  Power Supply (O
                    
                    Inhaltszusammenfassung zur Seite Nr. 6 
                    
                        3. System Installation  3.1 Chassis Open  To release two (2) screws on  the rear side of chassis, pull  the side cover with handle.  3.2 Motherboard Installation  Check mounting holes of  motherboard, to screw the  standoffs required to chassis.  Put the Motherboard into the  chassis, than screw in for  fixing. Next step is to plug the DC  ATX-20(or EPS-24) pin  connector on the Power Supply to Motherboard and insert the power  switch connector properly.  Finally, plug the IDE cable connector to
                    
                    Inhaltszusammenfassung zur Seite Nr. 7 
                    
                        3.3 PCI Add-on Card Installation  Remove the tail gate bracket,  install PCI card into  motherboard, and screw in  bracket to rear window of  chassis. The chassis could be  optional required A Card  Clamp Holder which is used  to clamp the Add-on Card  for avoiding any popping  issue. To remove The Clamp  Holder first, install Add-on  Cards as usual; adjust the  holder's height for clamping  well the Add-on Cards.  3.4 CDROM/HDD Installation -   YY-W2 Server Chassis is designed to install drive 
                    
                    Inhaltszusammenfassung zur Seite Nr. 8 
                    
                        To remove the front panel fist, the  front panel is snap in chassis with  hocks (or/and screw on by 4pcs  screws), please screw off the screws  and pull the front panel forward.   To remove the metal covers  (vented panel).    Screw a pair of rails to drive.  Slide in the drive install   chassis.  Screw in two (2) 6#32 on the  front plate.  3.5 Hard Disk Drive Installation  -How to use Fixed HDD Cage  YY-W2 Server Chassis is optional  could be built with HDD cage for  5-devices HDD, and the cage
                    
                    Inhaltszusammenfassung zur Seite Nr. 9 
                    
                        To screw off four (4) screws in the  front plate of chassis, the HDD  cage could be removed from  chassis, install HDD into cage.  The cooling fan of HDD cage  could be easy swap, release two  thumb screws in the front of HDD  cage, lift off the fan holder, swap  fan and assembly again into cage.  How to use HDD brackets  YY-W2 Server Chassis is built  in two sets of HDD mounting  bracket for 2-devices HDD  assembly at side of 5.25” drive  bay; mounting brackets are  packed into the accessory bo
                    
                    Inhaltszusammenfassung zur Seite Nr. 10 
                    
                        3.6 Instructions for Switches and LED Indicators on front panel  The switches and led indicators on front panel have the functions as  following:  POWER SW: Push Switch, The system power on/off, connects  to M/B.                          Reset SW: Push switch, connect to M/B   POWR LED: The system power LED (green), connect to M/B.   POWER FAILURE LED: Reserved and optional requested,  it may connected with the Power TTL signal wire supplied by PSU  RED: The power module is in abnormal operation
                    
                    Inhaltszusammenfassung zur Seite Nr. 11 
                    
                        Optional Intrusion Switch  The chassis could be built with  intrusion switch, assembly in left side  of chassis, when side cover removed  the system will alarm for intrusion, if  connected. 3.7. Instructions for cooling fan assembly  The chassis could be mounted optional two 60x60 cooling fans in  rear mounted for strengthen the air flow by pass of Add-on Cards.  3.8 Rack Mount Sliding Rails Installation  YY-W2 needs to use 24” rails (optional).  Screw the rails to both sides of the chassis by t
                    
                    Inhaltszusammenfassung zur Seite Nr. 12 
                    
                        3.9 System Assembly  When above steps are done, properly connect all accessories to the  system. Then the user can start to install the O/S and required  software to the system according to the instruction on the manual of  Motherboard.   4. Introduction of IDE/SCSI/SATA multi-bay backplane  modules  YY-W2 Server Chassis could be optional built with HDD multi-bay  backplane raid modules . SI-0357 SI-0347 SI-0237 12 ZZ17-W2001-B                                                                     
                    
                    Inhaltszusammenfassung zur Seite Nr. 13 
                    
                        Type A+ SI-0357 x 1 Type A+ SI-0237 x 2  5. How to change versatile as Rackmount Chassis (5U)   1. To remove top cover and bottom cover of chassis.  2. Screw in rack bracket and handles  13 ZZ17-W2001-B                                                                                                                                                                                                                                                                                                          
                    
                    Inhaltszusammenfassung zur Seite Nr. 14 
                    
                        3. Slide into EIA cabinet  14 ZZ17-W2001-B