Inhaltszusammenfassung zur Seite Nr. 1 
                    
                        80kW InfraStruXure PDU
PD80KF6FK1-M
PD80KG6FK1-M
PD80KL6FK1-M
Operation and Configuration
208/480/600V Input                                                                                                                                                                                                                                                                                                                                                                                                        
                    
                    Inhaltszusammenfassung zur Seite Nr. 2 
                    
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            
                    
                    Inhaltszusammenfassung zur Seite Nr. 3 
                    
                        About This Manual Audience This manual is intended for end-users of an 80kW InfraStruXure PDU. It covers the operation,  customization, and quick configuration of the InfraStruXure PDU. It also includes basic  InfraStruXure system operation. Companion manuals For additional information about the InfraStruXure system, see the following manuals that were  included with the PDU:   InfraStruXure 80kW Installation and Start-Up (990-1467B) covers the installation and start-up  of InfraStruXure UPS po
                    
                    Inhaltszusammenfassung zur Seite Nr. 4 
                    
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            
                    
                    Inhaltszusammenfassung zur Seite Nr. 5 
                    
                        Contents Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Safety symbols used in this manual  . . . . . . . . . . . . . . . . . . . 1 Cross-reference symbols used in this manual  . . . . . . . . . . . . . 1 Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
                    
                    Inhaltszusammenfassung zur Seite Nr. 6 
                    
                        Contacts Screen. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Breakers Screen  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Alarms Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 View Active Alarms  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Alarm/Event Log . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Alarm Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . .
                    
                    Inhaltszusammenfassung zur Seite Nr. 7 
                    
                        Configuring the Network Management Interface . . . . . . . . . . . 45 Connect the InfraStruXure PDU to your network  . . . . . . . . . 45 Configuration Overview . . . . . . . . . . . . . . . . . . . . . . . . . . 45 TCP/IP configuration methods . . . . . . . . . . . . . . . . . . . . . . 46 Device IP Configuration Wizard  . . . . . . . . . . . . . . . . . . . . . . 46 BOOTP & DHCP configuration . . . . . . . . . . . . . . . . . . . . . . 47 Local access to the control console . . . . . . . . . .
                    
                    Inhaltszusammenfassung zur Seite Nr. 8 
                    
                        Product Information .............................................. 71 InfraStruXure Standard Warranty. . . . . . . . . . . . . . . . . . . . . . . 71 Life-Support Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 How to Obtain Service. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 Appendix .............................................................. 75 Changes in This Manual. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 vi 80kW Infra
                    
                    Inhaltszusammenfassung zur Seite Nr. 9 
                    
                        Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and  maintenance of the PDU. Safety symbols used in this manual Indicates an electrical hazard, which, if not avoided, could result in injury or  death. Electrical Hazard Indicates a hazard, which, if not avoided, could result in personal injury or  damage to product or other property. Warning Indicates a potential hazard which could result in damage to produc
                    
                    Inhaltszusammenfassung zur Seite Nr. 10 
                    
                        Warnings Installation/Maintenance Only a certified electrician can perform these tasks:   Connect the InfraStruXure PDU to utility power  Connect the cross tie output breaker to another InfraStruXure PDU  Connect a switch to the EPO interface on the InfraStruXure PDU Only a certified electrician or an APC Field Service Engineer can perform these tasks:  Connect the PDU to the Symmetra PX UPS  Perform maintenance of the PDU When you connect the PDU to utility power, you must install a circui
                    
                    Inhaltszusammenfassung zur Seite Nr. 11 
                    
                        Safety Total Power Off 1. Set the Symmetra PX UPS System Enable switch to Off.  2. Set the DC Disconnect breaker of each Battery Enclosure to Off. 3. Set the PDU Main Input (A) switch to Off.  4. If applicable, set the PDU Bypass Input (B) switch to Off 5. If applicable, set the PDU Cross Tie Output (X) breaker to Off. 6. Set the upstream utility power circuit breaker(s) to Off. 7. Disconnect the batteries in the Battery Enclosure by pulling them out to the red disconnect line. DANGER—Risk of El
                    
                    Inhaltszusammenfassung zur Seite Nr. 12 
                    
                        Safety EMI This equipment has been tested and found to comply with the limits for a Class A digital device,  pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection  against harmful interference when the equipment is operated in a commercial environment. This  equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in  accordance with this user manual, may cause harmful interference to radio communications.  Operat
                    
                    Inhaltszusammenfassung zur Seite Nr. 13 
                    
                        Overview InfraStruXure PDU Components The APC 80kW InfraStruXure PDU provides distribution and management of electrical power. The  InfraStruXure PDU has the capacity of 80kW, accepts 208, 480, or 600V, 3-phase input, and  distributes 208V, 3-phase power to equipment racks and Rack Distribution Panels (RDPs). The RDPs  sit in the top 10U of specially-designed NetShelter VX enclosures and distribute power to equipment  racks. The InfraStruXure PDU is housed in a specially-designed 23-inch NetShel
                    
                    Inhaltszusammenfassung zur Seite Nr. 14 
                    
                        Overview  PDU front view (exterior)  PDU wide shielding   troughsThe PDU shielding   troughs accommodate the   power cables exiting the roof of  the PDU. Power CablesThese power   cables feed equipment racks;  they are fed through knockout  panels on the top (or bottom) of  the PDU. The power cables  consist of five wires: three  phases, one neutral, and one  ground. The number of power   cables installed in the PDU  depends on your system   configuration. Each power  cable has a NEMA L
                    
                    Inhaltszusammenfassung zur Seite Nr. 15 
                    
                        Overview  Front view (interior) Ground lugsGround lugs   are provided for the Main  Input switch, Bypass Input   switch, and Cross Tie Output   breaker. The main input lug   has two holes: one for a main   ground and one for the GEC.  See the instruction sheet,  Certified Electricians  Instructions for more   information. Main Input switch (A)   The main power source  connects to your system at  the Main Input switch. See   the instruction sheet,  Certified Electricians  Instruction
                    
                    Inhaltszusammenfassung zur Seite Nr. 16 
                    
                        Overview  Front view (door open) Wraparound   maintenance bypass  panelThe   maintenance bypass  panel has three  circuit breakers that  allow the UPS to be  electrically isolated  from the main power  source, while  maintaining the  power panels. The  input circuit breaker  is labeled Q1, the  output circuit breaker  is labeled Q2, and the  maintenance bypass   circuit breaker is  labeled Q3. The label  on the maintenance  bypass panel of the  PDU illustrates the  power flow, and the   H2 
                    
                    Inhaltszusammenfassung zur Seite Nr. 17 
                    
                        Overview  Rear view (interior) 42-position circuit breaker   panelEach PDU has a  circuit breaker panel with 42  pole positions. Each pole  provides power at 120 volts  L-N or 208 volts L-L. The  amperage each position   provides depends on the size  of the circuit breaker used.   Panel current sensors   Wires that feed the  distribution panel pass  through these current sensors,  providing data to the PDU  monitoring unit.  PDU monitoring unitThe PDU monitoring unit receives signals f
                    
                    Inhaltszusammenfassung zur Seite Nr. 18 
                    
                        Overview  PDU monitoring unit This connection provides the input power for the PDU monitoring   unit. The power is supplied by the monitoring unit circuit breaker   on the front of the PDU. If the panel is on, and the monitoring unit  circuit breaker is closed, the monitoring unit is powered.  Connects to sensors monitoring values such as voltage, current, and   power.  Digital input sensing for monitoring such as circuit breaker status,   885-2288 transformer temperature, fans, etc. The Dis
                    
                    Inhaltszusammenfassung zur Seite Nr. 19 
                    
                        Overview  User connection plate For a description and location of the user connection plate, see ( ) on page 8. For clarity, the user   connection plate is shown in the following illustration in greater detail.  \  !  USER INTERFACE © 2001 APC  MADE IN USA  !      + 1 23 4 EPO 24V EPO  Contact Inputs Contact Outputs AC/DC Contact  !  Connect the InfraStruXure PDU to the network of the InfraStruXure Manager  through the ethernet port.   The user connection plate has four input contact con
                    
                    Inhaltszusammenfassung zur Seite Nr. 20