ページ1に含まれる内容の要旨
Lighting Systems IS-LSC
9”
2-3/8”
We reserve the right to change details of design, materials and finish.
ページ2に含まれる内容の要旨
Lighting Systems IS-LSC TABLE OF CONTENTS ................................................................................................................................3 ....................................................................................................................................... ......................................................................................... .............................................................................
ページ3に含まれる内容の要旨
Lighting Systems IS-LSC SAMPLE PART LIST Strain Relief Canopy 4-1/2” Ø 1/4 -20 Coupling 1/16" Ø SJT Power Cord SS CABLE End-Cap Reflector Grip-Lock and Leveling Bar Housing Draw-Tight Joiner Assembly We reserve the right to change details of design, materials and finish.
ページ4に含まれる内容の要旨
Lighting Systems IS-LSC SAMPLE RUNS 48" End Cap Fixture 4' Module 4’ 10” 96" End Cap Fixture 8' Module 8' 10" 144" End Cap Fixture 12' Module 12' 10" 96" 96" End Cap Fixture Fixture 16' Module 16' 10" 144" 96" End Cap Fixture Fixture 20' Module 20' 10" 144" 144" End Cap Fixture Fixture 24' Module 24'– 10" 50" End Cap Fixture 4' Module 5' 100" End Cap Fixture 8' Module 9'– 2" 150" End Cap Fixture 12' Module 13'– 4" 150" 50" End Cap Fixture Fixture 16' Module 17'– 6" 150" 100" En
ページ5に含まれる内容の要旨
Lighting Systems IS-LSC PHASE 1 - MAKING THE STARTER FIXTURE 1. End-Cap Grip-Lock Grip-Lock Weld-Stud Quick Quick Connects Connects Weld-Stud Leveling Bar Receiver Figure 1 We reserve the right to change details of design, materials and finish.
ページ6に含まれる内容の要旨
Lighting Systems IS-LSC PHASE 1 - MAKING THE STARTER FIXTURE (CONT’D) 2. Do not over tighten. Note: Joiner fixtures only. For individual fixtures, proceed to Phase 3. W Weld-Stud eld-Stud Grip-Lock Quick Connects Go Through Here W Weld-Stud eld-Stud Receiver Receiver Leveling Bar Figure 2 We reserve the right to change details of design, materials and finish.
ページ7に含まれる内容の要旨
Lighting Systems IS-LSC PHASE 2 - MAKING THE INTERMEDIATE FIXTURE Note: If fixture is an individual, skip Phase 2 and go to Phase 3. 1. 2. Draw-Tight Bolt Bolt Goes into the Draw-Tight Bracket Figure 3 We reserve the right to change details of design, materials and finish.
ページ8に含まれる内容の要旨
Lighting Systems IS-LSC PHASE 3 - MAKING END OF RUN FIXTURE 1. 2. Weld-Stud Flush with Inside of Receiver Figure 4 We reserve the right to change details of design, materials and finish.
ページ9に含まれる内容の要旨
Lighting Systems IS-LSC CANOPY DETAIL - SLOT TEE Support Cable (By Others) Caddy Clip Slot Tee Standard Slot Tee (By Others) 1/4-20 Stud Strain Relief Canopy 4-1/2” Ø 1/4-20 Coupling SJT Power Cord We reserve the right to change details of design, materials and finish.
ページ10に含まれる内容の要旨
Lighting Systems IS-LSC CANOPY DETAIL - STANDARD 1" TEE Support Cable (By Others) Standard 1” Tee Caddy Clip Standard 1” Tee (By Others) Strain Relief 1/4-20 Stud Canopy 4-1/2” Ø SJT Power Cord 1/4-20 Couplings We reserve the right to change details of design, materials and finish.
ページ11に含まれる内容の要旨
Lighting Systems IS-LSC CANOPY DETAIL - JUNCTION BOX Junction Box (By Others) 1/4-20 Stud Strain Relief #8-32 Screws (By Others) Canopy 4-1/2” Ø SJT Power Cord 1/4-20 Coupling We reserve the right to change details of design, materials and finish.