ページ1に含まれる内容の要旨 
                    
                        DO NOT
DISCARD
R 
Portland
Tested and 
O-T O-T L
Listed by Oregon USA
C US
OMNI-Test Laboratories, Inc.
TOPAZ
DIRECT VENT ROOM HEATER 
Owner’s Manual
Installation and Operation
Model: 
839-1290
839-1320
839-1340
TOPAZ-D-CSB
Quartet Front
Solitaire Front
CAUTION
DO NOT DISCARD THIS MANUAL
• Read, understand and 
• Important operating and • Leave this manual with 
follow these instructions 
maintenance instructions party responsible for use 
included. for safe installation and 
and operation.
oper
                    
                    ページ2に含まれる内容の要旨 
                    
                        and Welcome to the Quadra-Fire Family! Hearth & Home Technologies welcomes you to our tradition  of our stoves, inserts and fi replaces.  And yet we are old- of excellence!  In choosing a Quadra-Fire appliance, you  fashioned when it comes to craftsmanship.  Each appliance  have our assurance of commitment to quality, durability,  is meticulously fabricated and gold and nickel surfaces are  and performance. hand-fi nished for lasting beauty and enjoyment.  Our pledge  to quality is completed as ea
                    
                    ページ3に含まれる内容の要旨 
                    
                        - TABLE OF CONTENTS - Section 7: Electrical Information Section 1: Listing and Code Approvals  A. Recommendation for Wire ..................27  A. Appliance Certifi cations ......................4  B. Connecting to the Appliance ...............27  B. Glass Specifi cations ............................4  C. Standing Pilot Ignition System Wiring ..27  C. BTU Specifi cations ..............................4  D. High Altitude Installations ....................4  E. Non-Combustible Materials .............
                    
                    ページ4に含まれる内容の要旨 
                    
                        Listing and Code Approvals 1 C.  BTU Specifi cations A.  Appliance Certifi cation Maximum Minimum Orifi ce *Effi ciency **P.4 MODEL: Topaz Model Input BTU Input Size Up To % (US or Canada) BTU LABORA- OMNI Test Laboratories, Inc. TORY: Topaz (NG) 061-S-24-5 39,500 26,500 .125 85 63 TYPE: Direct Vent Gas Heater Topaz (LP) 38,000 30,500 .073 85 64 * Thermal effi ciency maximum pipe with blower on. STANDARD: ANSI Z21.88a-2000 ּCSA 2.33a-M00 ּ   ** Canada minimum pipe. UL307b ּCAN/CBA 2.17-M91 The produc
                    
                    ページ5に含まれる内容の要旨 
                    
                        Inspection NOTE: The following requirements reference various  The state or local gas inspector of the side wall horizontally  Massachusetts and national codes not contained in this  vented gas fueled equipment shall not approve the installa- document. tion unless, upon inspection, the inspector observes carbon  monoxide detectors and signage installed in accordance with  G.  Requirements for the Commonwealth of      the provisions of 248 CMR 5.08(2)(a) 1 through 4.       Massachusetts Exemption
                    
                    ページ6に含まれる内容の要旨 
                    
                        Getting Started 2 A.  Design & Installation Considerations C. Inspect Appliance & Components Quadra-Fire direct vent gas appliances are designed to  operate with all combustion air drawn from outside of the  WARNING building and all exhaust gases expelled to the outside. No  additional air source is required. Inspect appliance and components for  damage. Damaged parts may impair safe  operation. CAUTION • Do NOT install damaged components. • Do NOT install incomplete components. Check building c
                    
                    ページ7に含まれる内容の要旨 
                    
                        Appliance Location and Clearances 3 NOTE:  WARNING ·  Illustrations refl ect typical installations and are FOR   Fire Risk DESIGN PURPOSES ONLY. Provide adequate clearance: ·    Illustrations/diagrams are not drawn to scale. • Around air openings • To combustibles ·   Actual installation may vary due to individual design     • For service access preference. Locate appliance away from traffi c areas. A. Selecting Appliance Location WARNING When selecting a location for your appliance it is importan
                    
                    ページ8に含まれる内容の要旨 
                    
                        Termination Locations 4 A. Vent Termination Minimum Clearances HORIZONTAL OVERHANG WARNING Fire Risk. 2 FT. 20 INCHES MIN. VERTICAL MIN. Explosion Risk. WALL LOWEST  Maintain vent clearance to combustibles  DISCHARGE  as specifi ed. OPENING • Do not pack air space with insulation or GAS DIRECT VENT  TERMINATION CAP other materials. Failure to keep insulation or other materials  X away from vent pipe may cause fi re. 12 ROOF PITCH IS  X/ 12 Measure vertical clearances from this surface. H (MIN.) - 
                    
                    ページ9に含まれる内容の要旨 
                    
                        M N P G R v A H Q D (See Note 2) E v V B L U.S. B T v (3 FT) v B B v S S Electrical V V Service F v v M I D* v X A J or K V X = VENT TERMINAL = AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTED V K = 3 ft. (U.S.A.) A = 12 inches ............. clearances above grade, veran- 6 ft. (Canada) ......... clearance to a mechanical (See Note 1) da, porch, deck or balcony (powered) air supply inlet B = 12 inches ............ clearances to window or door L** = 7 ft. ......................... clearanc
                    
                    ページ10に含まれる内容の要旨 
                    
                        Vent Information 5 A. Venting Components B. Use of Elbows In order to comply with applicable codes and product  warranties, use only  following venting components: CAUTION •  Hearth & Home Technologies (HHT)  ALL vent confi guration specifi cations MUST be followed. •  Simpson Dura-Vent • This product is tested and listed to these  specifi cations. •  Selkirk Direct-Temp  • Appliance performance will suffer if specifi cations are  •  Amerivent Direct not  followed. •  Security Secure Vent  Diagonal 
                    
                    ページ11に含まれる内容の要旨 
                    
                        D. How to Use the Vent Graph E. Venting Guidelines 1. Measure the vertical distance from the center line of the NOTES flue pipe to the center of the 90° elbow. On the graph The maximum horizontal vent run is 20 ft. (6m) when the  below, draw a horizontal line from that measurement vertical vent rise is 10 ft. (3m). on the vertical axis across until it intersects with the The minimum horizontal vent run is 6 in. (152mm) slanted  line. Horizontal sections require a 1/4 in. (6mm) rise for every 12 
                    
                    ページ12に含まれる内容の要旨 
                    
                        F.  Horizontal Termination WARNING Fire Hazard. Up & Out Installations for Top Vent  Type A -  Exhaust Fume Risk. Configurations Impaired Performance of Appliance. Wall Thimble • Ensure vent components are locked together correctly. 90º Degree  • Pipe may separate if not properly joined.  Elbow   Step 2.   Termination Cap Pipe Length Wall Thimble Cover Direct vent pipe is designed with a locking connection. To  connect the venting system to the appliance flue outlet, a  Pipe Length twist-lock ad
                    
                    ページ13に含まれる内容の要旨 
                    
                        Step 3.  NOTE: For installations using a round support box/wall thimble  (1) Installation requires a minimum of 6 in. (152mm)  (check pipe manufacturer's instructions), mark the wall for a  horizontal run of vent with a 1/4 in. (6mm) rise run towards  10 in. x 10 in.  (254mm x 254mm) square hole.  The center  the termination. Each 1 ft. (305mm) of horizontal venting  of the square hole should line up with the center line of the  must include a 1/4 in. (6mm) rise.  Never allow the vent  horizonta
                    
                    ページ14に含まれる内容の要旨 
                    
                        the vent pipe. Use the two sheet metal screws provided to  connect the strips to the pipe section (Figure 5.9).   8 in.  (203mm) 7 in.  1/4 in. (6mm)  (178mm) 7 in.  Fold Strap Here (178mm) 6 in.  (152mm) Sheet Metal Screw Wall Thimble Figure 5.7 Wall Thimble Cover/Ceiling  Firestop as Required by Local  Jurisdiction Strap   (NOTE:  Some termination caps may cause the vent  Figure 5.9   pipe to be off center on flashing).  Ensure that proper  clearances to combustible materials are maintained.  
                    
                    ページ15に含まれる内容の要旨 
                    
                        G.  Vertical Termination 1. Direct Vent Pipe   Vertical Termination Cap Storm Collar Flashing 40 ft. (12m)  Maximum Firestop Support Box Pipe Length Figure 5.11   Step 2. Set the gas appliance in its desired location. Drop a plumb  bob down from the ceiling to the position of the appliance  flue exit, and mark the location where the vent will penetrate  the ceiling. Drill a small hole at this point. Next, drop a plumb  bob from the roof to the hole previously drilled in the ceiling,  and mark th
                    
                    ページ16に含まれる内容の要旨 
                    
                        Step 3. CAP AND STORM  Shingles overlap on To install the round support box/wall thimble cover in a flat  COLLAR NOT SHOWN  top edge of flashing FOR CLARITY ceiling, cut a 10 in. (254mm) square hole in the ceiling,  centered on the hole drilled in Step 2.  Frame the hole as  shown in Figure 5.13. Ceiling  Joists Framing Figure 5.14   Step 7.  Continue to assemble pipe sections until the height of the  vent (before adding the termination cap) meets the minimum  code requirements as outlined in th
                    
                    ページ17に含まれる内容の要旨 
                    
                        Step 9. Twist-lock the vent cap and seal. Note:  For multi-story vertical installations, a ceiling firestop  is required at the second floor, and any subsequent floors  (Figure 5.16). The opening should be framed to 10 in. x  10 in. (254mm x 254mm) inside dimensions, in the same  manner as shown in Figure 5.13. Nails Ceiling Firestop Minimum 1 in.  (25mm) Clearance Minimum 1 in.  (25mm) Clearance Minimum 1 in.  (25mm) Clearance Minimum 1 in.  (25mm) Clearance Figure 5.16 WARNING Fire Risk. Explo
                    
                    ページ18に含まれる内容の要旨 
                    
                        2. Cathedral Ceiling Step 1. Follow installation Steps 1 and 2 under vertical installation  section, page 15. Step 2. Using the plumb-bob, mark the center line of the venting  system on the ceiling, and drill a small hole through the  ceiling and roof at this point. From the roof, locate the drill  hole and mark the outline of the cathedral ceiling support  box. Step 3. Remove shingles or other roof covering as necessary to cut  the rectangular hole for the support box. Cut the hole 1/8 in.  (3m
                    
                    ページ19に含まれる内容の要旨 
                    
                        3. Class A Metal Chimney Step 4. Pass the flex pipe down through the center of the chimney  system, and center the top adapter on the top of the chimney  Termination Cap pipe. Drill four 1/8 in. (3mm) diameter holes through the  Top Adaptor top adapter, and into the chimney top. Ensure that you are  drilling into the metal on the chimney. Twist lock the high  wind termination cap  onto the top adapter (Figures 5.22  Flashing and 5.23).  Existing Metal Chimney System 4 in. (102mm) Flex Pipe Retro
                    
                    ページ20に含まれる内容の要旨 
                    
                        4. Existing Masonry Chimney Type A - Up & Out Installations for Top Vent    Type B - Hearth Rear Vent Installations for Use With     Configurations Rear Vent Kit (see Section 12 for conversion kit and   venting components.) Termination Cap Chimney Liner Termination Cap Top Adaptor Flashing 4 in. (102mm)  Flex Liner 3 in. (76mm)  Retro Connector Flex Liner Co-Axial to  Co-Linear Connector 90° Elbow Pipe Length  Optional Direct Vent Pipe Chimney Liner Termination Cap 30 ft. (9m) of 3 in.  (76mm) F