Harman-Kardon PB 105 user manual

User manual for the device Harman-Kardon PB 105

Device: Harman-Kardon PB 105
Category: Boiler
Manufacturer: Harman-Kardon
Size: 2.52 MB
Added : 8/23/2014
Number of pages: 40
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Harman-Kardon PB 105. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Harman-Kardon PB 105.

For your convenience

If looking through the Harman-Kardon PB 105 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Harman-Kardon PB 105 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Harman-Kardon PB 105 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Harman-Kardon PB 105 User manual - Online PDF
Advertisement
« Page 1 of 40 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Harman-Kardon PB 105 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Harman-Kardon PB 105. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

Summary of the content on the page No. 2

Summary of the content on the page No. 3

Summary of the content on the page No. 4

Table of Contents Assembly 4 Venting 8 Installation 11 Operation 20 Maintenance 27 Troubleshooting 31 Feeder Parts 32 Specifications 33 Wiring Diagram 34 Parts List & Options 35 Warranty 36 Testing Label 37 Quick Reference Start-Up Back Cover Please read this entire manual before you install and use your new boiler. Failure to follow instructions may result in property damage, bodily injury, or even death. SAVE THESE INSTRUCTIONS Harman Stove Company 352 Mountain House Road Halifax, PA 1703

Summary of the content on the page No. 5

Assembly 5 Outdoor Air Temperature Sensor Wiring : T Te em mp pe er ra attu ur re / e / P Pr ress essu ur re e G Ga au ug ge e Aq Aqu ua as st ta at t W We el ll l Pr Pre es ss su ur re e R Re elliie ef f V Va allv ve e Bl Bla an nk k Co Cov ve er r* * H Heat eat E Ex xc ch ha an nger ger * *R Re em mo ov ve ed d w/ Do w/ Dom me es sttic ic Ho Hott Cl Cle ea an no ou utt R Ro od d H Ha an nd dlle es s W Wa at te er r C Co oi il l O Op pt ti ion on Sh Show own n H Her ere e QT QTY Y (

Summary of the content on the page No. 6

Summary of the content on the page No. 7

Assembly MINIMUM NON-COMBUSTIBLE FLOOR PROTECTION AREA After assembly of the flue tunnel weldment, combustion blower assembly with wiring and heat shield, the boiler can now be installed. 1. Install the control board cover as well as the access Non-Combustible cover located on the feeder cover. Floor Protector 2. Install the spring handles provided with the unit on the ash door, firebox door and the heat exchanger cleanout rod handles. (Fasten handles by turning them counterclock- wise and pushi

Summary of the content on the page No. 8

Assembly When installing the PB105 in a mobile home several INSTALLATION IS TO BE PERFORMED BY A requirements must be followed: QUALIFIED INST ALLER. 1. The unit must be bolted to the floor. 2. The unit must be connected to outside air. NOTE: All installation clearances and restrictions 3. Floor protection and clearances must be followed. must be adhered to. 4. Unit must be grounded to the metal frame of the mobile home. NOTE:Use only 4” diameter type “L” or “PL” venting system. Be sure to inspe

Summary of the content on the page No. 9

Venting Requirements for Terminating the Venting H. A vent must not be installed within 3 feet (90 W ARNING: V enting terminals must not be recessed cm) above a gas meter/regulator assembly when mea- into a wall or siding. 1 sured from the horizontal center-line of the regulator. NOTE: Only PL vent pipe wall pass-throughs and I. The clearance to service regulator vent outlet 1 fire stops should be used when venting through combus- must be a minimum of 6 feet. tible materials. J. The clearance

Summary of the content on the page No. 10

Venting 10 Fig. 3

Summary of the content on the page No. 11

Venting Venting Venting Use 4” pellet vent pipe to vent your PB105. A combustion blower is used to extract the combustion gases from the firebox. This creates a negative pressure in the firebox and a positive pressure in the venting system as shown in Fig. 4. The longer the vent pipe and more elbows used in the system, the greater the flow resistance. Because 4” Type “L” or of these facts we recommend using as few elbows as pos- “PL” Vent pipe sible and 30 feet or less of vent pipe. The maximum

Summary of the content on the page No. 12

Summary of the content on the page No. 13

Installation Outside Air Outside air is optional, although it may be required by some building codes. The benefit of outside air is higher efficiency and reduced venting restrictions mainly noticed in small and very tight houses. To install outside air, use 2 3/4”" I.D.galvinized steel flex pipe, part # 2-00-08544 ( 12’ 6” length) or part # 2-00-08545 ( 25’ length) See Fig. 6. There is a break- away hole on the rear panel which must be removed Inlet Cover part# before connecting the flex pipe

Summary of the content on the page No. 14

Main Wiring Installation 14 To install power to the boiler first remove the cover on the 4” X 4” junction box located on the back of the unit. There are several knockout holes provided for the incoming main power wires. Also, a knockout hole can be used for the auxiliary output overheat zone (if used). The minimum recommended circuit is 6 AMP - 120 VAC - 60 HZ. This boiler should be the only appliance on the circuit. If a 15 AMP circuit breaker is used at the distribution box, the boiler must b

Summary of the content on the page No. 15

Summary of the content on the page No. 16

Installing Duct/Air Conditioning Installation Boilers intended to be connected to an existing boiler or boiler system shall: 1. Be capable of being installed without interfering with the normal delivery of heated water from the original boiler to the radiation system. 2. Be capable of being installed to operate as intended without affecting the operation of the electrical and mechanical safety controls of the original boiler. 3. Provide, upon completion of the installation, for a change over fro

Summary of the content on the page No. 17

Installation 17

Summary of the content on the page No. 18

Installation 18

Summary of the content on the page No. 19

Installation 19

Summary of the content on the page No. 20


Alternative user manuals
# User manual Category Download
1 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
2 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
3 A.O. Smith 200 User manual Boiler 2
4 A.O. Smith 201 User manual Boiler 7
5 A.O. Smith 750 & 1000 User manual Boiler 6
6 A.O. Smith GB/GW-400 User manual Boiler 10
7 A.O. Smith DB/DW-720-1810 User manual Boiler 1
8 A.O. Smith DB-720 thru 1810 User manual Boiler 0
9 A.O. Smith GB/GW-650 User manual Boiler 3
10 A.O. Smith GB/GW-500 User manual Boiler 5
11 A.O. Smith GB/GW-200 User manual Boiler 2
12 A.O. Smith ACGSS02307 User manual Boiler 0
13 A.O. Smith 3400 User manual Boiler 0
14 A.O. Smith 1700 User manual Boiler 1
15 A.O. Smith 2000 User manual Boiler 3