Jotul GF 100 DV II, GF 200 DV II user manual

User manual for the device Jotul GF 100 DV II, GF 200 DV II

Device: Jotul GF 100 DV II, GF 200 DV II
Category: Electric Heater
Manufacturer: Jotul
Size: 1.51 MB
Added : 7/25/2014
Number of pages: 32
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Jotul GF 100 DV II, GF 200 DV II. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Jotul GF 100 DV II, GF 200 DV II.

For your convenience

If looking through the Jotul GF 100 DV II, GF 200 DV II user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Jotul GF 100 DV II, GF 200 DV II on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Jotul GF 100 DV II, GF 200 DV II to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Jotul GF 100 DV II, GF 200 DV II User manual - Online PDF
Advertisement
« Page 1 of 32 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Jotul GF 100 DV II, GF 200 DV II but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Jotul GF 100 DV II, GF 200 DV II. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

GF 100 DV II Nordic QT
GF 200 DV II Lillehammer
WARNING:
Installation
IF THE INFORMATION IN THESE INSTRUCTIONS
ARE NOT FOLLOWED EXACTLY, A FIRE OR EXPLO-
SION MAY RESULT CAUSING PROPERTY DAMAGE,
and
PERSONAL INJURY OR LOSS OF LIFE.
FOR YOUR SAFETY:
Operation
DO NOT STORE OR USE GASOLINE OR OTHER
FLAMMABLE VAPORS AND LIQUIDS IN THE VICIN-
Instructions ITY OF THIS OR ANY OTHER APPLIANCE.
INSTALLATION:
INSTALLATION AND SERVICE MUST BE PER-
FORMED BY A QUALIFIED INSTALLER, SERVICE
AGENCY OR LICENSED

Summary of the content on the page No. 2

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Welcome to Jøtul... Congratulations on the purchase of your new Jøtul gas heater. We at Jøtul are glad you’ve made the decision to warm your hearth with a Jøtul product. Your new stove exemplifies over 150 years experience as the world’s largest manufacturer of solid fuel burning appliances. We’ve been making fine quality cast iron wood and coal stoves and fireplaces continuously since 1853. Great things come in small packages: both the Nordic QT

Summary of the content on the page No. 3

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Table of Contents Specifications, GF 100 DV II .................. 4 Specifications, GF 200 DV II .................. 5 Jøtul GF 100 DV II Nordic QT General Information ............................... 6 and Service Tools .............................................. 6 Jøtul GF 200 DV II Lillehammer Safety Information .................................. 7 Direct Vent Gas Heaters Installation Requirements Location .................................

Summary of the content on the page No. 4

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Jøtul GF 100 DV II Nordic QT 20 5/8” Specifications 524 mm Input Rates Natural Gas 17,000 BTU/hr. maximum input 22 1/4” 9,900 BTU/hr. minimum input 565 mm Propane 16,000 BTU/hr. maximum input 8,700 BTU/hr. minimum input Inlet Pressure: MIN MAX Natural Gas: 5.0 WC (1.24 kPa) 7.0 WC (1.74 kPa) Propane: 12.0 WC (2.98 kPa) 14.6 WC (3.63 kPa) Manifold Pressure: MIN MAX Natural Gas: 1.2 WC (0.29 kPa) 3

Summary of the content on the page No. 5

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Jøtul GF 200 DV II Lillehammer Specifications 24 3/4” Input Rates 630 mm Natural Gas 20,000 BTU/hr. maximum input 11,400 BTU/hr. minimum input Propane 22 3/4” 18,000 BTU/hr. maximum input 560 mm 8,450 BTU/hr. minimum input Inlet Pressure: MIN MAX Natural Gas: 5.0 WC (1.24 kPa) 7.0 WC (1.74 kPa) Propane: 12.0 WC (2.98 kPa) 14.6 WC (3.63 kPa) Leg To Leg 18 1/2” 17 1/4” Manifold Pressure: MIN MAX 470 mm 13” 4

Summary of the content on the page No. 6

GF 100 DV II Nordic QT GF 200 DV II Lillehammer General Information Stove Setup Inspect the stove for damage and contact your dealer THIS HEATER MUST BE INSTALLED AND MAINTAINED immediately if any is found. Check contents of the BY A QUALIFIED SERVICE AGENCY. Miscellaneous Kit against the lists on p. 4-5. Complete The installation and repair of this appliance must be the installation steps in the following order: done by a qualified service person. Failure to properly 1. Remove the Top Plate.

Summary of the content on the page No. 7

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Location Safety Information Your stove will reach high surface temperatures In selecting a location for the stove, consider the during normal operation. Please note the following following points: cautionary information. 1) Heat distribution 2) Vent termination requirements 3) Gas supply line routing Due to the high operating temperatures, this 4) Traffic areas, furniture, draperies, etc. appliance should be located out of traffic areas The st

Summary of the content on the page No. 8

GF 100 DV II Nordic QT GF 200 DV II Lillehammer    Stove and Vent Clearance    Requirements      Minimum Clearances from the Stove to Combustibles: Measured from the stove top plate. See figs. 2-4.   !"  #  For Both Stoves     Rear: 0” (0 mm)  Ceiling: 42” (1066 mm)  Corner: 2” (50 mm) Sides: 3” (76 mm) Minimum Clearances between Vent Pipe and GF 100 DV II GF 200 DV II Combustible Materials: Nordic QT Lilleh

Summary of the content on the page No. 9

 GF 100 DV II Nordic QT GF 200 DV II Lillehammer Venting Requirements Intake Air Restriction You may need to restrict air intake to the burner, depend- Both stoves may be installed with a vertical or horizontal ing on the stove vent configuration. Two Side Restrictor termination and must conform to the configuration Plates and one Rear Restrictor Plate are included in the requirements described in this section. Vent components Miscellaneous Kit for this purpose. Use the following from the

Summary of the content on the page No. 10

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Vertical Vent Termination   '& (") The Jøtul GF 100 DV II and Jøtul GF 200 DV II are ap- proved for vertical venting through a ceiling or to a roof termination following these guidelines: The termination should fall within the shaded area of   the grid depicted in fig.7 below. ' (") Maximum Vertical must not exceed 15 ft. (4.57 m) measured from the top of the stove. In no case shall any discharge opening on the termi- nation cap

Summary of the content on the page No. 11

GF 100 DV II Nordic QT GF 200 DV II Lillehammer High Wind Cap Exhaust Gas Venting Through a Fireplace Intake Air Max. Co-linear Height 15 ft. Co-linear Vent Installation (10.66 m) This appliance may be vented through a masonry or Min. Class A prefabricated chimney using a Co-linear Flexible Co-linear Vent system approved for use with a solid-fuel burning Height 8 fireplace. When installed in the manner described below, ft. this system can improve the performance of the appli- (2.44 m) ance in co

Summary of the content on the page No. 12

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Horizontal Vent Termination Wall Cut-out Opening: A minimum 10" X 10" (250 mm x 250 mm) square hole is required for proper pipe clearances through a combustible wall. Use one of the approved vent manufacturers’ WALL THIMBLE for ( !0 the wall penetration. .!  12 /!( DO NOT FILL AIR SPACE WITH ANY TYPE OF INSULATION.  !  $   *  The minimum horizontal run made directly off the + !,  - rear of the st

Summary of the content on the page No. 13

GF 100 DV II Nordic QT GF 200 DV II Lillehammer   7 + !,  -  "4 2 !" / ! Wall Shield Installation The decorative Wall Shield, included in the Miscellaneous Hardware bag, is used to obscure the vent hole in the  5 3 4 58 wall in installations vented directly off the rear of the   3   7 stove. Follow this procedure: 2 5 !(  3 4 58 - 1. Remove the top two 1/4” hex head screws from the rear shroud of the stove. 2. Align th

Summary of the content on the page No. 14

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Horizontal Termination Clearance Figure 17. Vent Terminal Clearances - National Fuel Gas Code. A = Clearance above grade, veranda, porch , deck, or I = Clearance to service regulator vent outlet: balcony : 12 inches (30 cm) minimum. 3 feet (91 cm) minimum. B = Clearance to window or door that may be opened: J = Clearance to nonmechanical air supply inlet to building or **Min. 9 inches, U.S. / *12 inches (30 cm) CAN. the combustion air inlet to a

Summary of the content on the page No. 15

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Mobile Home Installation Fuel Conversion Your gas stove is shipped from the factory equipped to These appliances can be installed for use in a mobile burn NATURAL GAS only. If PROPANE gas is to be used as home in the U.S. and Canada provided: fuel, the appliance must first be converted for use with 1. The stove is secured to the floor of the mobile home. propane. Use the Jøtul Floor Bracket Kit appropriate for your stove’s leg; see the Accessories

Summary of the content on the page No. 16

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Gas Conversion Procedure 1. Turn off gas supply to stove. 15. Apply gas to the system and check for leaks using a soapy water solution or electronic gas detector. 2. Remove the stove Top Plate (3). NEVER USE AN OPEN FLAME TO CHECK FOR GAS LEAKS. 3. GF 100 DV II Only: Remove the front plate from the stove. Pull the casting straight up and out away from Correct gas pressure is essential for efficient and safe the side panels. Pull the panel upward wi

Summary of the content on the page No. 17

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Gas Supply Connection Pilot Head NOTE: If the optional Blower will be installed, use a 90° Elbow off the valve to create adequate clearance for the Orifice main gas line. The gas supply line connection is made to the valve just Retainer inside the left rear leg. The gas supply line should be 3/8" Clip npt with a 1/2" diameter supply, or the appropriate size to provide sufficient gas pressure to the valve regardless of the input setting. Pilot Base

Summary of the content on the page No. 18

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Gas Pressure High Altitude Adjustment The decreased atmospheric pressure of higher altitudes Correct gas pressure is essential for efficient and safe affects heat value of gaseous fuels. Most gas suppliers operation. It is important that the correct pressure is derate the gas intended for use at elevations above 2000 established at the time of the installation. Proper gas feet. Check with your gas supplier before performing pressure provides a c

Summary of the content on the page No. 19

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Flame Appearance - Air Shutter Adjustment WARNING: AIR SHUTTER ADJUSTMENTS SHOULD ONLY BE High Altitude Orifice Chart PERFORMED BY A QUALIFIED PROFESSIONAL SERVICE GF 200 DV II Only TECHNICIAN. Orifice The air shutter setting at the burner orifice can be Elevation Fuel Part No. Size adjusted to achieve the desired flame appearance. The shutter is set in the mid-range at the factory, however, 0 - 2000 ft. Natural Gas #46 220975

Summary of the content on the page No. 20

GF 100 DV II Nordic QT GF 200 DV II Lillehammer Optional Wall Thermostat or Log Set Installation Remote Control NOTE: Install the optional Brick Kit, if appropriate, before Use only a 750 millivolt DC two-wire circuit thermostat installing the Log Set. See page 30. with this appliance. The thermostat should be placed in the same room as the heater, typically 5 feet off the floor. Avoid drafty areas or any area that may affect the The Log Set and Ember Stones are packaged in foam accuracy of the


Alternative user manuals
# User manual Category Download
1 Jotul GF 400 DV User manual Electric Heater 10
2 Jotul GF100 DV User manual Electric Heater 3
3 A.O. Smith AH - 290 User manual Electric Heater 6
4 A.O. Smith AHD 290 User manual Electric Heater 7
5 A.O. Smith AHDS 290 User manual Electric Heater 0
6 A.O. Smith ST 3000 User manual Electric Heater 5
7 A.O. Smith WATER HEATERS User manual Electric Heater 13
8 A.O. Smith ST 1500 User manual Electric Heater 1
9 ACCO Brands H212 User manual Electric Heater 4
10 ACCO Brands H312 User manual Electric Heater 28
11 Adams Sun Heat Low Intensity Infra-Red Heater User manual Electric Heater 1
12 Addonics Technologies RAID TOWER IX RT93DAHXML User manual Electric Heater 1
13 Addonics Technologies RAID TOWER IX RT93DAHX User manual Electric Heater 1
14 AEG WSP 6010 User manual Electric Heater 85
15 AEG WSP 4010 User manual Electric Heater 56