Atmos Energy HE26 user manual

User manual for the device Atmos Energy HE26

Device: Atmos Energy HE26
Category: Heating System
Manufacturer: Atmos Energy
Size: 4.59 MB
Added : 3/29/2013
Number of pages: 56
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Atmos Energy HE26. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Atmos Energy HE26.

For your convenience

If looking through the Atmos Energy HE26 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Atmos Energy HE26 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Atmos Energy HE26 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Atmos Energy HE26 User manual - Online PDF
Advertisement
« Page 1 of 56 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Atmos Energy HE26 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Atmos Energy HE26. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

Atmos InterSystem



Installation & Servicing Instructions for HE26
(GC 41-249-05)
Atmos Heating Systems
West March
Daventry
Northants, NN11 4SA
Tel: 01327 871990
Fax: 01327 871905
e-mail: sales@atmos.uk.com
internet: www.atmos.uk.com

Issue 22.01.10 (Main revision)

Summary of the content on the page No. 2

© 2010 Atmos Heating Systems The information provided applies to the product in the standard model. Atmos Heating Systems can therefore not be held liable for any damage resulting from the product specifications that deviate from the standard model. The information provided has been compiled with the utmost care. However, Atmos Heating Systems cannot be held liable for any faults in the information nor for the consequences thereof. Atmos Heating Systems cannot be held liable fo

Summary of the content on the page No. 3

TABLE OF CONTENTS 1. Safety Regulations 7 1.1 General .......................................................................................................................................................................7 1.2 CH system...................................................................................................................................................................7 1.3 Gas system .............................................................................

Summary of the content on the page No. 4

8.6 CH does not reach the correct temperature..............................................................................................................45 9. SERVICING THE BOILER AND COMPONENT REPLACEMENT 46 9.1 SERVICING THE BOILER ........................................................................................................................................46 9.2 COMPONENT REPLACEMENT..............................................................................................

Summary of the content on the page No. 5

This manual Using this manual you can safely install and maintain this appliance. Carefully follow the instructions. In case of doubt, contact Atmos Heating Systems. Keep these instructions near the appliance. Abbreviations and names used Description To be referred to as High Efficiency HE Atmos InterSystem wall-mounted gas heater Appliance Appliance with piping for central heating CH system Icons The following symbols are used in this manual:-

Summary of the content on the page No. 6

Atmos Warranty – Short version 1. Atmos Warranty is against any material, construction or operation faults that are found to be of original manufacturing origin. A full statement of the Atmos Warranty is available (www.atmos.uk.com or 01327 871990). 2. Atmos boiler warranty is, subject to conditions; two years from date of invoice, or 12 months from date of installation; whichever is the later. The warranty shall be 2 years for replacement parts and associated labour, thereafter any

Summary of the content on the page No. 7

1. SAFETY REGULATIONS The appliance must be installed in accordance with the Gas Safety (Installation and Use) Regulations; October 1994. Failure to install appliances correctly could lead to prosecution. Atmos Heating Systems does not accept any liability for damage or injury caused by not (strictly) observing the current safety regulations and instructions, nor by negligence while installing the Atmos InterSystem wall-mounted gas heater and any accompanying accessories. The manufact

Summary of the content on the page No. 8

2. DESCRIPTION OF THE APPLIANCE 2.1 General The Atmos InterSystem wall-mounted gas boiler is designed for delivering heat to the water of a CH system and, if required, heating hot water via an indirect hot water tank. The air supply and flue discharge can be connected to the appliance by means of two separate pipes or a concentric connection. The appliance has its own wall mounting strip, but can also be fitted to an optional wall mounting frame that allows top connections. An optiona

Summary of the content on the page No. 9

0 Pump overrun After the operation of the CH, the pump has an overrun. This overrun time is set to the value according to parameter 8 (see § 7.3; factory setting is 1 min). This setting can be changed. Also, the controller will automatically run the pump for 10 seconds, once every 24 hours, to prevent it from getting stuck. This activation of the pump takes place at the time of the last heat demand 24hrs later. In order to change this time, set the room thermostat higher for a whil

Summary of the content on the page No. 10

temperature and the operation mode can be set with parameters [E] and [E.] (refer to §7.3). 2.4 PC interface The controller has an interface for a PC. With a special cable and accompanying software, a PC can be connected. This provision makes it possible to follow the behaviour of the controller, the appliance and the heating system during a long period. 2.5 Test programmes In the controller, there is provision for putting the appliance into a test statu

Summary of the content on the page No. 11

3. MAIN COMPONENTS A CH pump M Flue discharge (or concentric connection) B Gas valve N Connecting block / terminal list X C Clamping plate O Condensate discharge D Supply sensor S1 Q Codensate trap E Return sensor S2 R Heat exchanger F Fan S Controller operating panel and display H Pressure gauge T Ionisation/ignition probe I 1m connecting cable 230 V ~ U Position type plate J Manual air vent V Expansion vessel (shown in broken lines) K Sight glass and mirror W Pressure relief

Summary of the content on the page No. 12

3.1 Accessories Description Part Ref Pipe mounting bracket 092.537 • Connection supply and return 22 mm diameter • Connection gas ½" female thread • Mounting strip boiler • Bag with fixings Rear mounting frame for top pipe connection 092507 Bottom Pipework cover 092527 Outside sensor for weather compensation 203.207 Conversion set to Propane (LPG or G31) 075537 Interface cable (for Installers) 230677 12

Summary of the content on the page No. 13

4. INSTALLATION 4.1 Overall dimensions A= CH flow 22 mm diameter h= 670mm InterSystem HE 26 B= CH return 22 mm diameter C= Gas 15 mm diameter H= 810mm InterSystem HE 26 Z= Flue gas outlet 80 mm diameter F= Condensate 32 mm dia (after trap 25 mm dia flexible) Y= Air supply inlet 80 mm diameter 13

Summary of the content on the page No. 14

4.2 Unpacking the appliance 1. Unpack the appliance. 2. Check the content of the packaging. This consists of:- • Appliance (A) • Mounting strip (B) • Condensate trap (C) • Installation Instructions • User Operating Instructions • Warranty card 3. Valve set (supplied separately with boiler) comprising 2 x 22mm isolation valves, 1 x gas valve. 4. Check the appliance for any damage: report damage to the Supplier immediately. CAUTION: This appliance should be lifted and handled by 2

Summary of the content on the page No. 15

4.4 Boiler location Clearances Above casing 200mm min Below casing 230mm min RH 30mm min LH 30mm min (in operation) LH 140mm min (servicing) Front 30mm min (in operation) Front 450mm min (servicing) Keep 50 mm free space above the front panel in order to be able to remove the front panel from the casing. Allow 140 mm on the left side for swinging out the expansion vessel during commissioning/service. The appliance can be fitted to a mounting frame. The assembl

Summary of the content on the page No. 16

4.5 Mounting Depending on the mounting option ordered, the following mounting methods are available:- Mounting strip (A) alone, OR mounting strip (A) and optional pipe mounting bracket (B), OR rear mounting frame (C) and pipe mounting bracket (B), which are both optional items. This arrangement allows for vertical pipework behind the boiler. Note that when the pipe mounting bracket is used, the pipes can be connected before installing the appliance. A 4.5.1 Fitting the mounting

Summary of the content on the page No. 17

4.5.4 Installation connections 1. Make the various connections to the valves (see diagram). 2. Install a filling loop (not supplied) between the cold water inlet pipe and the CH return connection. 3. For most installations, the flexible tube for the safety discharge will be long enough to fit into the condensate discharge waste pipe (see below). In cases where this does not apply, install a 15 mm copper safety discharge pipe to fit into the waste pipe (as shown in the diagram, §5.1) o

Summary of the content on the page No. 18

4.8 Condensate disposal The appliance is provided with a 25 mm flexible pipe from its condensate trap. As given in §4.6, this should be inserted into an open waste pipe of not less than 32 mm diameter, together with the safety discharge pipe. The condensate is slightly acidic (pH between 3 and 6) and should be disposed of in the following ways, using suitable plastic waste pipe (Note: copper or steel must not be used):- • internal stack pipe (see diagram) • waste pipe (see diagrams)

Summary of the content on the page No. 19

5. CONNECTIONS 5.1 Connect the CH system 1. Flush the CH system thoroughly. 2. Connect the flow and return pipes to the mounting bracket. All pipes must be mounted tension-free in order to avoid ticking of the pipes. Existing connections must not be twisted in order to avoid leaks at the connections with the external pipes. The CH system should be provided with:- • A filling loop in the return pipe directly below the appliance. • A drain tap at the lowest point of the system.

Summary of the content on the page No. 20

5.2 Connecting the gas supply 1. Connect the appliance gas valve to the gas pipe. 2. Check the boiler's data plate to ensure that the appliance has been set for the correct gas supply. The boiler is supplied for Natural Gas (G20). A propane (G31) gas conversion set is available and an appropriate sticker is included (see §7.7). 3. The meter governor should deliver a dynamic pressure of 20mbar for natural gas or 37mbar for propane. 4. To prevent the ingress of for


Alternative user manuals
# User manual Category Download
1 Atmos Energy INTERCOMBI HE32 User manual Heating System 6
2 Allied Air Enterprises 506299-01 User manual Heating System 1
3 Amtrol User manual Heating System 3
4 Atmos Energy INTERCOMBI HE32 User manual Heating System 6
5 Bard Mfg. Co.EHP513-A10 User manual Heating System 1
6 Bard Mfg. Co.EHP513-B09 User manual Heating System 1
7 Bard Mfg. Co.EHP513-A15 User manual Heating System 0
8 Bard Mfg. Co.EHP513-C09 User manual Heating System 2
9 Bard Mfg. Co.EHP513-B15 User manual Heating System 2
10 Bard Mfg. Co.EHP513-C15 User manual Heating System 1
11 Bosch Appliances 24CDI User manual Heating System 19
12 Breckwell Hearth Products LUXURY SERIES User manual Heating System 0
13 Breckwell P2700 User manual Heating System 3
14 Bryant 379 User manual Heating System 0
15 Bryant 580J*16D User manual Heating System 0