Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM user manual

User manual for the device Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM

Device: Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM
Category: Coffeemaker
Manufacturer: Bunn
Size: 1.22 MB
Added : 4/24/2014
Number of pages: 50
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM.

For your convenience

If looking through the Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM User manual - Online PDF
Advertisement
« Page 1 of 50 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Bunn ingle Multi- BrewWISEDBC WITH SMART FUNNELTM. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

BUNN
L
E
N
T
N
R
A
U
F
M
Single Multi-

BrewWISEDBC
TM
WITH SMART FUNNEL
S
INSTALLATION & OPERATING MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
37467.0000A 11/04 ©2004 Bunn-O-Matic Corporation
www.bunnomatic.com
ICED TEA

Summary of the content on the page No. 2

BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows: 1) All equipment other than as specified below: 2 years parts and 1 year labor. 2) Electronic circuit and/or control boards: parts and labor for 3 years. 3) Compressors on refrigeration equipment: 5 years parts and 1 year labor. 4) Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis: parts and labor for 3 years or 30,000 pou

Summary of the content on the page No. 3

TABLE OF CONTENTS User Notices .............................................................................................................................. 4 Electrical Requirements ............................................................................................................. 6 Plumbing Requirements ............................................................................................................ 7 Operating Controls.....................................................

Summary of the content on the page No. 4

Summary of the content on the page No. 5

L G Y G E D T N L N N N I I I U U W N F N O E R R Q V O A A O I W W M L H USER NOTICES (continued) 00658.0000 L 03409.0004 E 03408.0004 12364.0000 20201.5600 37467 110904 Page 5 ! R S !

Summary of the content on the page No. 6

ELECTRICAL REQUIREMENTS L2 RED L1 BLACK P2166 Requires 2-wire, grounded service rated 200 or 240 volts ac, 20 amp, single phase, 50/60 Hz. ELECTRICAL HOOK-UP CAUTION – Improper electrical installation will damage electronic components. 1. An electrician must provide electrical service as specified. 2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source. 3. This brewer comes with an attached cordset. 4. Remove the front panel beneath the sprayhead. 5.

Summary of the content on the page No. 7

PLUMBING REQUIREMENTS This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 1 and 620 kPa) from a ⁄2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water 1 inlet fitting is ⁄4" flare or female quick connect. 1 3 NOTE – Bunn-O-Matic recommends ⁄4" copper tubing for installations of le

Summary of the content on the page No. 8

OPERATING CONTROLS h d e f b a P3200 g c i OPERATING CONTROLS (a) BATCH SELECTOR PADS Pressing the pad corresponding to the recipe selects the amount of beverage to be brewed. Pressing a different pad after a brew cycle has been initiated does not change the brew in progress. Light indicates the selected recipe to brew. (b) ON/OFF PAD Pressing the ON/OFF pad alternately turns the brewer on and off. Pressing this pad during the brew cycle will interrupt the brew cycle, stopping the flow of water

Summary of the content on the page No. 9

INITIAL SETUP CAUTION – The brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions. 1. Insert an empty funnel into the funnel rails of the brew station. 2. Place an empty server under the funnel. 3. Connect the brewer to the power source. Water will begin flowing into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT...TANK FILLING until tank is filled with water. 4. Wait approximately twen

Summary of the content on the page No. 10

GLOSSARY AD CARD: An assembly consisting of a computer chip and an instruction label. Used for loading advertising messages into the brewer. BREW LOCKOUT: The inability to initiate a brew if the water temperature is less than the ready temperature programmed into the brewer. CHIP: A computer chip containing either recipes for specific coffee flavors or advertising messages which are ® read by the sensing coils on the brewer. One chip is embedded in each Smart Funnel handle to carry the coffee fl

Summary of the content on the page No. 11

PROGRAMMING Using the menu-driven display on the front of the brewer, the operator has the ability to alter or modify various brewing parameters such as brew temperatures, brew volumes, bypass percentages, etc. This allows for the precise brewing of various flavors of coffee. Programming of the brewer is achieved by entering a certain function. Then, by the use of hidden programming switches, the operator can customize the brewing process to their specifications. PROGRAMMING SWITCHES To access t

Summary of the content on the page No. 12

PROGRAMMING THE BREWER PROGRAMMING FUNCTIONS - FLOW CHART BREW LOCKOUT? PROGRAMMING FUNCTIONS - LEVEL 1 NO DONE YES PROGRAMMING FUNCTIONS - LEVEL 2 WARMER OFF: OFF SET NEW RECIPE? ENABLE ADS? REVIEW RECIPES? (-) DONE (+) NO YES NO DONE YES NO YES SET READY: 91° 0 REFILL-> 155 SPRAY ML/M: XXXX SET TEMP: 93° (-) DONE (+) (-) DONE (+) (-) DONE (+) (-) DONE (+) DILUT ML/M: XXX BREW COUNTERS? FUNNEL LOCKOUT?

Summary of the content on the page No. 13

DISABLE PROGRAMMING THE BREWER The programming of the brewer is divided into two levels. There is one function in Level 1. All other functions are accessed in Level 2. The following function screens are in order of appearance. Each screen will have instructions on how to access, and the procedures to program the various functions of the brewer. IMPORTANT PROGRAMMING NOTES - READ CAREFULLY - To exit the programming mode at any time, press and release the "ON/OFF/LOWER" pad located on the front s

Summary of the content on the page No. 14

PROGRAMMING THE BREWER (cont.) METHOD 2: PROGRAMMING FUNCTIONS - LEVEL 2 Using a RECIPE CARD to enter all of the brew There are three methods of programming the settings at one time: various brewing parameters of the Single Multi- If using a coffee flavor not in the Single Multi- BrewWISE DBC with Smart Funnel brewer. BrewWISE DBC Grinder's memory, the customer can obtain a RECIPE CARD from the factory with all the METHOD 1: information needed to set up that particular coffee Using a Smart Funne

Summary of the content on the page No. 15

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) WARMER OFF: This function allows the operator to set a predeter- mined time for the warmer to shut off in a range from 15 minutes to 6 hours in increments of 15 minutes. WARMER OFF: OFF Procedures to set the warmer shut off time: 1. Press and hold the ® pad until the display reads (-) DONE (+) WARMER OFF. 2. Pressing (-) in this screen will count down the shut off time starting at 6:00 hours and decrease in increments of 0:15 minutes. 3. Pressi

Summary of the content on the page No. 16

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPE - METHOD 1 Procedure for Setting the Recipe: Using a Smart Funnel and a Single Multi-BrewWISE NOTE: Before beginning setup, place a GPR server DBC Grinder: beneath the sprayhead. This function allows the operator to set BREW 1. Insert the funnel into the grinder and select a batch VOLUMES, DILUTION PERCENTAGES, PULSE BREW size to grind. It is not necessary to have coffee TIMES, PREINFUSION TIMES and DRIP-OUT TIMES beans in the hopper(s) in o

Summary of the content on the page No. 17

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPES - METHOD 1 (cont.) 16. To SET PULSE BREW, if setting pulse brew BY EXAMPLE (brewing into a funnel) press YES and 8. Using (-) and (+), set the amount of brew water, in proceed with the setup instructions for SETTING ounces, to be dispensed over the grounds for that PULSE BREW - BY EXAMPLE, on page 26. particular batch size. 17. If setting pulse brew by ENTER TIMES (entering 9. When finished, press another batch size and re- known times) pre

Summary of the content on the page No. 18

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPES - METHOD 1 (cont.) 22. Using (-) and (+), set the amount of time the brew 27. The display should now read DRIP TIME, along cycle will delay (after the presoak cycle shuts off) with either the word OFF, or a time will be showing. before resuming brewing. A batch light should also be blinking. 23. When finished, press another batch size and re- 28. Using (-) and (+), set the amount of time from peat until all batch sizes are set. when the bre

Summary of the content on the page No. 19

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPE - METHOD 2 Using a RECIPE CARD to load coffee names and brew 5. If all brew settings are correct, press SAVE. The settings into the Single Multi-BrewWISE DBC with display will read (RECIPE NAME) SETUP COM- Smart Funnel: PLETE. All brew settings for that name are now The Multi-BrewWISE DBC Grinder's memory con- stored in the brewer's memory. tains certain coffee names. If the operator uses a 6. If the brewing information is not correct, or it

Summary of the content on the page No. 20

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPE - METHOD 3 If not using a Smart Funnel (with a sensor coil) and/ or a Single Multi-BrewWISE DBC Grinder, the brewer will function as a standard BUNN Single Multi- REVIEW RECIPES? BrewWISE DBC Brewer: NO YES It is possible to operate the brewer without using EXIT TO a Smart Funnel and/or a DBC Grinder. If a standard NEXT FUNCTION SCREEN funnel, or if a non-DBC grinder is used the brewer will NO-NAME automatically select a


Alternative user manuals
# User manual Category Download
1 Bunn AUTOMATIC CEZF15 User manual Coffeemaker 6
2 Bunn 5S User manual Coffeemaker 0
3 Bunn CWT15 User manual Coffeemaker 12
4 Bunn CEZF User manual Coffeemaker 0
5 Bunn AutoPOD User manual Coffeemaker 3
6 Bunn A10 Automatic User manual Coffeemaker 41
7 Bunn IMIX-4 User manual Coffeemaker 0
8 Bunn 1.5 GALLON User manual Coffeemaker 6
9 Bunn 120/208V User manual Coffeemaker 17
10 Bunn 10 Cup Pourover Coffee Brewer A10 User manual Coffeemaker 20
11 Bunn CDBC-TSR User manual Coffeemaker 0
12 Bunn 12 CUP AUTOMATIC COFFEE BREWER RL35 User manual Coffeemaker 7
13 Bunn 37614 041410 User manual Coffeemaker 3
14 Bunn COFFEE BREWERNHB User manual Coffeemaker 2
15 Bunn AXIOM BREWWISE 39131.0004B User manual Coffeemaker 45
16 Philips coffee maker flavor select HD7606 User manual Coffeemaker 3
17 Sony WALKMAN D-EJ2000 User manual Coffeemaker 19
18 Philips HD 7820/65 User manual Coffeemaker 62
19 Philips coffee maker flavor select HD7612 User manual Coffeemaker 91
20 Philips HD7544 User manual Coffeemaker 8