Summary of the content on the page No. 1
HT - 2212 Pro Series
User’s Manual
Rev. Original
FCC Notes:
This equipment generates, uses, and can radiate radio
frequency energy and, if not installed and used in accordance
with the instructions manual, may cause interference to radio
communications. It has been tested and found to comply with
limits for a Class A digital device pursuant to subpart J of Part 15 of FCC Rules, which
are designed to provide reasonable protect
Summary of the content on the page No. 2
ALERT TO OUR HONORABLE CUSTOMERS: l Please always read thoroughly all the instructions and documents delivered with the product before you do anything about it. Don’t take any premature action before you have a full understanding of the consequences. l This product contains inside a Lithium battery and maybe also a sealed type Lead acid battery if the UPS battery option is ordered. Please always follow local environmental protection laws / regulations for disposal of used batteries and
Summary of the content on the page No. 3
BRIEF INTRODUCTION THE USER’S MANUAL The purpose of this manual is to guide the user in the initial installation and general use of the Posiflex POS terminals HT-2212 Pro series. It does not explain any application software that may be supplied with it. We intend to provide our customers with all technology advantages available by evolving the product design to incorporate appropriate changes and improvements. So some detail differences may exist between this manual and the equipment s
Summary of the content on the page No. 4
THE STANDARD FEATURES CPU: VIA C7 1 GHz; HDD: 40 GB or above; RAM: 256 MB DDR2 upgradeable to 2 GB max. Ethernet Networking: The standard network port works with both 10 Base T and 100 Base T. Serial Ports: There are 4 serial ports in a HT-2212 Pro system. COM1 is shared by the direct driven cash drawer port and the UPS function. Each COM port is capable of providing independently a +5 V DC or a +12 V DC supply. All these DC supplies are achieved through internal jumper setting and the
Summary of the content on the page No. 5
type Finger Print Sensor f) Customer display: Pole mount 2 x 20 VFD display PD-2601 or LCD nd pole display PD-7321 or 2 LCD Screen: LM-2010 g) Audio amplifier and internal speakers h) Wireless LAN Adaptor: inside back cable cover, IEEE 802.11b/g i) UPS Battery: 2.3 AH 12V lead acid maintenance free battery j) 2-in-1 Cash Drawer Control Cable: Cable CCBLA-238, when added to the CR port of the HT-2212 Pro series, can be used to control two Posiflex printer drive type cash drawers. k) Pr
Summary of the content on the page No. 6
INSTALLATION GUIDES IMPORTANT Please do not connect the power cord or turn on the main unit until you have fully read the installation guides and followed the instructions!!! TECHNICAL ENHANCEMENTS Applicable technical enhancements in HT-2212 Pro series include serial COM port power supply settings, RTC battery replacement, VGA port power supply setting, DRAM upgrades and adding a half-length PCI adapter card. All these technical enhancement operations require purchase of applicable T
Summary of the content on the page No. 7
of the system unit before pressing these 2 springs. The LCD and touch panel may flip forward by gravity and get or cause damage by hitting anything in front of the system unit. POWER ADAPTOR The power connector resides in the lower left corner of main connector area. Please make sure that the cable from the power adaptor is inserted into the power connector of HT system in the correct orientation as illustrated in right drawing. The manufacturer is not responsible for any damage cause
Summary of the content on the page No. 8
LCD CASHIER DISPLAY Push down the round plastic button at rear of the display base as Push inward to turn left-right circled in right picture to adjust the display up and down. Release the Push down to button when done will lock the panel turn up-down firmly for application. Pushing the rectangular shape plastic button to its right toward the base center allows user to adjust the display horizontally for best view angle. ND CUSTOMER DISPLAY (OPTION) OR 2 DISPLAY When the HT serie
Summary of the content on the page No. 9
PROGRAMMABLE KEYBOARD & KEYPAD (OPTION) All types of Posiflex programmable keyboards can be applied in HT system. Most recommended keyboard models are: KB-6000, KB-6200 series and KB-6600. Just connect it to the PS/2 KB port in the main connection area. The application of the keyboard and the keypad KP-200 requires no software driver and is free from any software compatibility issue. The system integrator can program the content of the keyboard or keypad for the application software fol
Summary of the content on the page No. 10
control of the COM1 serial port. Use the cable supplied with the Posiflex cash drawer (Part No. 21863018010) for connection to the CR port in HT system. This cable has a 6- pole plug at one end and an 8-pole plug at the other. The 8-pole plug should be inserted into the connector marked: “signal cable from POS Printer” at the rear of the cash drawer. The 6-pole plug should be inserted in the connector marked “CR” found in the main connection area in the system. The user may also use the
Summary of the content on the page No. 11
OPERATING SYSTEM INSTALLATION This product is highly professionalized equipment. The installation of an OS into a machine without any preloaded OS could constitute major difficulty for average user who either has barely limited technical knowledge of this professionalized equipment or is insufficiently equipped with necessary facilities to accomplish such a task. Therefore, installation of an OS into a system without preloaded OS is highly discouraged. Posiflex shall not be responsible
Summary of the content on the page No. 12
USING THE HT SYSTEM BEFORE POWER ON – A Check List It is very important that you check the following operational points: Ventilation This terminal must NOT be operated in an environment with restricted ventilation. There must be at least 25 mm air clearance around any top or side ventilation holes with a free flow of air around the unit at ALL times for the installation. Operating Environment The equipment must not site in direct sunshine, near a heater or in a damp and must be free
Summary of the content on the page No. 13
replace the used up UPS battery at power off as soon as possible. Emergency treatment: The battery is constructed maintenance free and leakproof. Its storage space in HT system also provides very good protection as long as the ambient temperature remains below 30°C and the ventilation of the HT system remains free. However, should any accident happen and the sulfuric acid from the battery spills on skin or clothing, wash immediately with water. If the a cid comes in contact with eyes, r
Summary of the content on the page No. 14
usage of the battery power, the flashing LED will keep on flashing for few seconds before steady till the AC supply is stable. POWER ON/OFF CONTROL The HT terminal implements electronic power control, such that the main power to the system may be controlled by many methods as below: 1. Hardware power switch 2. Software OFF command 3. Automatic power ON control 4. Emergency power OFF Switching from OFF to ON requires a normal supply of the AC power. Hardware Power Switch This button
Summary of the content on the page No. 15
Emergency Power Off In case of serious system halt due to any reason, the system could fail to be powered off through normal means. Press and hold the Power ON/OFF Switch for Emergency Power Off. Release the switch after the system powered off. It will take about 10 seconds. If there appears to give a special coded beep tone in the pattern “short, long, short, long, short” prior to the system power off in this process, please remove the AC power and wait for few minutes to allow the har
Summary of the content on the page No. 16
drag and drop feature. If the point is touched, released and touched within a short time interval, it will simulate double-clicking left button of the mouse. Emulating the click on right button of a real mouse is further illustrated in paragraph below. Touch terminal manager Before using the PS/2 interface resistive type touch control panel, one must be aware that if you connect any monitor to the VGA port of HT system for extended secondary display application, you can not apply any to
Summary of the content on the page No. 17
For bar code card reading, it is still required to insert the card to the bottom with bar code stripe facing the mark aside the slot. For smart card reading, please insert the end of the smart chip first and have the chip facing the mark aside the side slot of KP-200 as in the right picture. For finger print scanning, please refer to the specific instruction on the manual for SD-300. FAN CONTROL In the preloaded OS for this HT system, there is an embedded function that can keep on mon
Summary of the content on the page No. 18
VENTILATION MAINTENANCE To keep this equipment in orderly service, following maintenance should be performed on a regular basis. Removing Front Cover Please first remove Front Cover any power and signal connection to this Release Opening equipment. Please then check at the bottom side of Chassis Bottom View the chassis that there is a gap between the bottom side of front cover and the chassis at the left corner of front cover. Pull the front cover out from this opening to release
Summary of the content on the page No. 19
Cleaning for Front Ventilation Use vacuum cleaner to remove any dust or threads accumulation away from both the ventilation holes on front cover and ventilation grids on chassis exposed after removal of the front cover. Front Ventilation Grids on Chassis Ventilation Holes on Front Cover Replacing Front Cover Follow the opposite procedure as removing the front cover to replace the front cover in position. Please make sure the all hooks on front cover is well positioned into chassis. P
Summary of the content on the page No. 20
Cleaning for Side Ventilation Use vacuum cleaner to remove any dust or threads accumulation away from outsides of both ventilation grids on chassis exposed after removal of the front cover as in pictures below and close back the top cover when done. Side Ventilation Grids on Chassis T31454 Part 20