Resumo do conteúdo contido na página número 1 
                    
                          
 
 
 
 
PRE-ASSEMBLED 
INSTALLATION INSTRUCTIONS 
 
 
 
 
EARTHSTONE OVENS-6717 SAN FERNANDO RD  GLENDALE  CA  91201 
TELEPHONE:   800-840-4915     818-553-1134 FAX: 818-553-1133 
www.earthstoneovens.com       e-mail:  earthstone@earthlink.net 
 
 
A MAJOR CAUSE OF OVEN RELATED FIRES IS FAILURE TO MAINTAIN 
REQUIRED CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS.  IT IS 
OF UTMOST IMPORTANCE THAT THIS OVEN BE INSTALLED ONLY IN 
ACCORDANCE WITH THESE INSTRUCTIONS 
 
12/4/2002                
                    
                    Resumo do conteúdo contido na página número 2 
                    
                            EARTHSTONE WOOD FIRE OVENS  6717 SAN FERNANDO RD, GLENDALE  CA  91201  earthstone@earthlink.net     www.earthstoneovens.com    Pre-Assembled installation instructions.               Table of contents    Page        Instructions for moving and lifting oven  Parts list     1  Installation procedures written portion 2-5  Required clearances and air gaps  6  Exhausting     4-10  Operating instructions    11-12  Maintenance instructions   12-13  Type I Exhaust Hood Diagram  14  Clearance Informat
                    
                    Resumo do conteúdo contido na página número 3 
                    
                            INSTRUCTIONS FOR LIFTING AND MOVING OVEN        ATTENTION:  Only proper heavy lifting  3- INSTALLING OVEN  machinery and handling equipment should be    used for unloading, moving and installing the  Slowly lower oven into proper location.  Oven  oven.  This duty should be performed by  should be set on a level floor.  Shim as  professionals trained in this kind of work.   necessary to assure that oven is level.  Remove  Improper handling of the equipment could result  horizontal front angle
                    
                    Resumo do conteúdo contido na página número 4 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     1  LIST OF SUPPLIED ITEMS    OVEN    ADDITIONAL ITEMS     METAL DOOR    DIGITAL THERMOMETER (REQUIRES 120V AC OUTLET)  120 V AC, 60 HZ, 1 AMP POWER SUPPLY (SUPPLIED)   TRAINING VIDEO                                                                                                                                                                                                                   
                    
                    Resumo do conteúdo contido na página número 5 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     2  PRE-ASSEMBLED INSTALLATION INSTRUCTION GUIDE    READ ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING AND USING THE APPLIANCE.    If this oven is not properly installed, a fire may result.  To reduce the risk of fire, follow the installation  instructions.  Please read this entire manual before you install the oven.  Failure to follow instructions may  result in property damage, bodily injur
                    
                    Resumo do conteúdo contido na página número 6 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     3      INSTALLATION. OPERATING AND MAINTENANCE PREFACE    Refer to pages 9, 10 and 11 for complete instructions.    1)  On daily basis, and after the oven temperature is at least 500 at F:  (a) Ashes are to be removed by a  metal ash scoop/shovel or by a suitable fire-safe vacuum cleaner with long metal wand extensions  provided by the user.; (b) the oven interior is then to be mopped down 
                    
                    Resumo do conteúdo contido na página número 7 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     4  A.  INSTALLATION PROCEDURES    1. Mark an outline on the floor of the location desired.  This is to assure that you have adequate   space.  Refer to Fig. 1, pg. 6.    2. Check that there is adequate clearance at the ceiling for the hood.  There must be a minimum of   3 inches of clearance between the top of the hood and/or oven and the surface of the drywall   above.  A height of 105 inc
                    
                    Resumo do conteúdo contido na página número 8 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     5  I TYPE-I EXHAUST HOOD-Installed per NFPA 96, standard for ventilation control  and fire protection of commercial cooking operations. (For commercial  applications only)    1. If required, a Type 1 hood must be placed above the cooking opening and set on the top  of the oven.  The minimum exhaust hood dimensions are 36 in. wide 37 in. deep,   22in. high for models 90 and 110, and 40 in. w
                    
                    Resumo do conteúdo contido na página número 9 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     6      ALL CLEARANCES SPECIFIED ARE THE MINIMUM REQUIRED AIR SPACES COMBUSTIBLES 3"MIN. HOOD 3"MIN. 105" 80" OUTSIDE DIAMETER FOR COMMERCIAL USE ONLY MODEL   60  -  33” X 32” Figure 2 MODEL   90  -  50",     MODEL 110 -  58" U.M.C. & N.F.P.A. MODEL 130  -  70”,     MODEL 160 -  86" Figure 1 3"MIN. COMBUSTIBLES 1"MIN. 1" MIN. HOOD COMBUSTIBLES FEED 1"MIN. OPENING 48" 48" MIN. MIN. 1" MIN. An
                    
                    Resumo do conteúdo contido na página número 10 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     7      GREASE HOOD        MODELS 130 AND 160                                                 MODELS 90 AND 110        7” 7” 7” 7”           FIGURE 16                                                                                                                                                                                                                                                    
                    
                    Resumo do conteúdo contido na página número 11 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     8        ALL MODELS    22" 10” 37”       OVERALL EXHAUST HOOD DIMENSIONS ARE MINIMUMS.      SECTION              FIGURE 17                  Oven stand Base plate Ramset red heads (typ.) Embed 2 1/2” min. 4” to 6” conc. Floor slab               FIGURE 17-A                                                                                                                                          
                    
                    Resumo do conteúdo contido na página número 12 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     9  DIRECT VENTING FOR ORDERING PARTS MENTIONED ON THIS PAGE CONTACT EARTHSTONE OR YOUR SUPPLIER.  Tel:  800-840-4915- 818-553-1134 MODELS  90 & 110 USE 6 INCH INSIDE DIAMETER GREASE DUCT MODELS  130 & 160 USE 8 INCH INSIDE DIAMETER GREASE DUCT 30” min. FIGURE 18 GREASE DUCT HEATING APPLIANCE CHIMNEY ATTACHED TO PRIMARY HOOD THIS DIAGRAM GENERALLY DEPICTS THE INSTALLATION REQUIRED TO MAINTAI
                    
                    Resumo do conteúdo contido na página número 13 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     10  RESIDENTIAL DIRECT VENTING FOR ORDERING PARTS MENTIONED ON THIS PAGE CONTACT EARTHSTONE 800-840-4915 OR YOUR SUPPLIER. MODELS  60 & 90 & 110 USE 6 INCH INSIDE DIAMETER GREASE DUCT/BUILDING HEATING APPLIANCE CHIMNEY CHIMNEY ROUND TOP (P-CT) STORM COLLAR  (SC-C1) FLASHING ROOF BRACE KIT (RBK)  IF REQUIRED FIGURE 18 GREASE DUCT HEATING APPLIANCE CHIMNEY ATTACHED TO PRIMARY HOOD THIS DIAGRA
                    
                    Resumo do conteúdo contido na página número 14 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     11  WOOD-FIRED PIZZA OVEN  OPERATING INSTRUCTIONS  WARNING:    READ ALL INSTRUCTIONS CAREFULLY.  IMPROPER USE OF THIS APPLIANCE MAY RESULT IN A  BUILDING FIRE OR PERSONAL INJURY.  INSTRUCTIONS MUST BE READ AND THOROUGHLY  UNDERSTOOD BY ALL OPERATING AND SUPERVISING PERSONNEL.  WATCH TRAINING VIDEO  FOR VISUAL OPERATION INSTRUCTIONS.    THIS OVEN IS INTENDED FOR ATTENDED OPERATION BY TRAINED
                    
                    Resumo do conteúdo contido na página número 15 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     12    8.    a- Before starting, turn "ON" exhaust fan and make-up air blowers.     b- Place a small amount of wood and kindling on the hearth over a fire-starter block.  Light fire-    starter.  At any time do not use more than four pieces of wood,     c- CAUTION:  NEVER USE GASOLINE TYPE LANTERN FUEL, KEROSENE, CHARCOAL      LIGHTER FLUID OR SIMILAR PRODUCTS TO START OR "FRESHEN UP" A FIRE
                    
                    Resumo do conteúdo contido na página número 16 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     13    3. Store wood in a cool, dry place well away from any source of flame or heat.  If stored outside, keep the   fuel covered to protect from rain or snow.  If stored inside, fuel should be kept in a covered metal   container at least 6 inches above the floor.  Keep paper, rags and other easily ignited materials away   from wood fuel.  Refer to NFPA 96 for wood storage procedures.    4. 
                    
                    Resumo do conteúdo contido na página número 17 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     14  Type-I Exhaust Hood Installed per NFPA 96 **IT IS NEVER APPROPRIATE TO USE “CLASS A” OR For Models 90 and 110 “B VENT” IN ANY PART OF THE EXHAUST SYSTEM 36” MIN EXHAUST SYSTEMS SERVING SOLID-FUEL For Models 130 and 160 EQUIPMENT MAY NOT BE COMBINED WITH 40” MIN EXHAUST SYSTEMS SERVING OTHER (NON-SOLID FUEL) COOKING EQUIPMENT Grease filters must be placed at the rear of the hood 22” and 
                    
                    Resumo do conteúdo contido na página número 18 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     15    CLEARANCE INFORMATION FOR FACADES 1 inch minimum clearance to combustibles Facade Flue Collar Models 90 and 110 - 6 inch diameter Models 130 and 160 - 8 inch diameter Air gap must be sealed with a non combustible strip. e.g.  Aluminum or s/s Any adjacent combustible floor which projects  36” in front of the oven opening must be a  minimum of 30 inches away from each side of  the door 
                    
                    Resumo do conteúdo contido na página número 19 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     16  IMPORTANT:  PLEASE READ  FOR GAS FIRE OR GAS/WOOD COMBINATION OVENS ONLY  Combustion air intake procedures and installation    Proper installation:    Roof Roof Air flow Air flow Air flow Air flow False Ceiling False Ceiling 24”x24” opening needed for  24”x24” opening needed  combustion air. Only one intake  should be installed located in the  for combustion air. Only  front or back of 
                    
                    Resumo do conteúdo contido na página número 20 
                    
                        EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---U.L. LISTED                                     17  Improper Installation (cont)    2) Oven is not closed to plenum/attic and is open to HVAC airflow.    Roof Air flow Air flow Ceiling Installing a sealed enclosure around the oven  shell may cause improper operation by  starving the burner system of combustion air.   The air flow which travels above will cause  “negative pressure” below where the gas  burner is located. The air underneat