Краткое содержание страницы № 1 
                    
                        GOLD CGi
Gas-Fired Water Boilers
Series 2
• Installation • Maintenance
Boiler Manual
• Startup • Parts
	 This	 manual	 must	 only	 be	 used	 by	 a	 qualified	 heating	 installer/service	 technician.	 Before	 installing,	 read	 all	
instructions,	 including	 this	 manual,	 the	 burner	 manual	 and	 any	 related	 supplements.	 Perform	 steps	 in	 the	 order	
given.F 	 ailuret 	 oc 	 omplyc 	 ouldr 	 esult	in	severep 	 ersonal	injury, 	deatho 	 r	substantialp 	 roperty	damage.	
	 DO NOT USE BOILER 
                    
                    Краткое содержание страницы № 2 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual How it works . . . 	 Control	module ① The	 control	 module	 responds	 to	 signals	 from	 the	 room	 thermostat,	 air	 pressure	 switch	 and	 boiler	 limit	 circuit	 to	 operate	 the	 boiler	 circulator,	 pilot	 burner,	 gas	 valve	 and	 inducer.	 When	 room	thermostatcal 	 ls	forheat, 	 	thec 	 ontrol	modulestar 	 ts	the	system	circulator	and	inducer. The	 control	 module	 runs	 the	 inducer	 long	 enough	 to	 purge	 the	 boiler	 flue	 passages,	 t
                    
                    Краткое содержание страницы № 3 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual GOLD CGi  Gas-Fired Induced-Draft Water Boiler 3 Part Number 550-110-710/0107                                                                                                                                                                                                                                                                                                                                                                                       
                    
                    Краткое содержание страницы № 4 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual Contents 	 Howit 	 works 	 	 ....................................................2–3 	 Hazard	definitions 	 ............................................... 4 	 Pleaser 	 eadbefor 	 e	proceeding 	............................ 5 		1	 Prepare	boilerlocation 	 	 ...................................6–11 		2	 Prepare	boiler 	...............................................12–13 		3	 Venting	 .........................................................14-19 4	 
                    
                    Краткое содержание страницы № 5 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual Please read before proceeding Installer User 	 Read all instructions before in- •	 This manual is for use only by your qualified  stalling.	 Follow	 all	 instructions	 in	 heating installer/service technician. proper	 order	 to	 prevent	 personal	 •	 Please	 refer	 to	 the	 User’s Information Manual	 for	 injury	ord 	 eath. yourr 	 eference. •	 Consider 	 piping and installation	 when	 determining	 •	 We 	 recommend	 regular	 service by a qualified
                    
                    Краткое содержание страницы № 6 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 1a Prepare boiler location — codes & checklist Installations	must	followthese 	 	codes: •	 Local, stat 	 e, 	provincial, 	and	national	codes, la 	 ws,	regulations	ando 	 rdinances. •	 NationalF 	 uel	Gas	Code, 	 ANSI	Z3.1–lat  est	edition. •	 Standard	 for	 Controls	 and	 Safety	 Devices	 for	 Automatically	 Fired	 Boilers,	 ANSI/ ASME	CSD-1, w 	 henr 	 equired. •	 NationalEle 	 ctrical	Code. •	 For 	 Canada	 only:	 B149.1	 or	 B149.	 Installati
                    
                    Краткое содержание страницы № 7 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 1b Prepare boiler location — clearances RecommendedSER 	 VICEclearances 	 	 Figure 1b Required MINIMUM clearances (Fig. 1a) 1.	 Provide	 clearances	 for	 cleaning	 and	 servicing	 the	 boiler	 and	 for	 access	 to	 controls	 and	 components.	 See	 Figure1a 	 	 for	 recommen- dations. .	 Provide	 at	 least	 screwdriver	 clearance	 to	 jacket	 front	 panel	 screws	 for	 removal	 of	 front	 panel	 for	 inspection	 and	 minor	 service.	 If	 unable	 to
                    
                    Краткое содержание страницы № 8 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 1c Prepare boiler location — vent system 	 Failure	 to	 follow	 all	 instructions	 can	 result	 in	 flue	 gas	 spillage	 and	 carbon	 monoxide	 emissions,	 causing	 severe	 personalinj 	 ury	or	death. 	 Inspect	 existing	 chimney	 before	 installing	 boiler.	 Failure	 to	 clean	 or	 replace	 perforated	 pipe	 or	 tile	 lining	 will	 cause	 severe	personalinj 	 ury	or	death. 	 Direct exhaust venting (Category III)	 —	 Do	 not	 common	 vent	 the	 CGi
                    
                    Краткое содержание страницы № 9 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 1d Prepare boiler location — air contamination Please	 review	 the	 following	 information	 on	 potential	 Refer	 to	 Table 1	 for	 products	 and	 areas	 which	 may	 cause	 combustion	airc 	 ontamination	problems. contaminatedc 	 ombustionair 	 . 	 To	 prevent	 potential	 of	 severe	 personal	 injury	 or	 death,	 check	 for	 products	 or	 areas	 listed	 below	beforeinstal 	 lingb 	 oiler. 	If 	any	of 	these	contaminants	are	found: •	 remove	contami
                    
                    Краткое содержание страницы № 10 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 1e Prepare boiler location — air openings Figure 2 Air openings to interior spaces 	 Combustion air opening location and sizing  requirements depend on the clearances around  the boiler.	 Check	 the	 boiler	 placement	 compared	 to	 ✷ Figure	1a, 	page. 	 ✷ 	 If all clearances are at least equal to Figure 1a,  page 7,	 apply	 the	 sizing	 and	 placement	 of	 openings	 given	onpag 	 es	10	and	11. 	 If ANY clearance is less than Figure 1a, page 7,	 y
                    
                    Краткое содержание страницы № 11 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual   Unusually	tight	construction 	 FREE AREA	 of	 openings	 —	 the	 minimum	 areas	 Unusually	 tight	 construction	 means	 (per	 ANSI	 Z 3.1)	 given	 in	 this	 manual	 are	 free	 area	 (equals	 the	 area,	 buildings	in	which: length	 times	 width	 of	 opening,	 after	 deduction	 for	 a.	 Walls 	 and	 ceilings	 exposed	 to	 the	 outside	 atmo- louvero 	 bstruction). sphere	 have	 a	 continuous	 water	 vapor	 retarder	 with	 Use	thefr 	 eear 	 eainf 
                    
                    Краткое содержание страницы № 12 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 2a Prepare boiler — placement & setup 	 Do	 not	 operate	 boiler	 without	 Place	boiler/cratenear 	 	 burner	 shield	 in	 place.	 Failure	 position to	 do	 so	 could	 result	 in	 severe	 personal	 injury,	 death	 or	 sub- 1.	 Leave	 boiler	 in	 crate	 and	 on	 pallet	 until	 installation	 site	 stantial	property	damage. is	ready. .	 Movee 	 ntire	crate	and	pallet	next	tose 	 lected	location. 3.	 Removecr 	 ate. Orifice	 replacement	 4.	 Remove	boi
                    
                    Краткое содержание страницы № 13 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 2b Prepare boiler — pressure test 5.	 Slowly	 reopen	 boiler	 drain	 valve	 until	 test	 pressure	 Hydrostatic	pressure	test on	 the	 pressure/temperature	 gauge	 reaches	 no	 more	 Pressure	 test	 boiler	 before attaching	 water	 or	 gas	 piping	 than: (except	as	noted	below)o 	 r	electrical	supply. •	 45 psigf 	 orb 	 oilers	with	 30 psig relief valve. Prepareboiler 	 for 	 	test •	 75 psig	forb 	 oilersw 	 ith	 50 psig relief valve. 1.	 Remove	 
                    
                    Краткое содержание страницы № 14 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 3a Venting — general information CGiventing 	 methods 	 — 	 	Chimney	draft	or	Directexhaust 	 	 Chimney	draftventing 	 Direct	exhaust— 	 	verticalor 	 sidewall 	 Chimney	draftv 	 entinguses 	 the 	 	natural	draftp 	 rovided	 Direct	 exhaust	 venting	 uses	 inside	 combustion	 air		 with	 by	 a	 vertical	 vent	 or	 chimney.	 Category	 I	 appliance	 (non- no	 combustion	 air	 connector	 piping.	 All	 CGi	 flue	 gas	 positive	 vent	 static	 pressure	 
                    
                    Краткое содержание страницы № 15 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 3c Venting — Direct exhaust — components Obtain	ventsystem 	 	components 1.	 The 	 following	 special	 gas	 vent	 systems	 comply	 with	 UL-1 38	 and	 ULC- S636	 standards	 and	 are	 certified	 by	 CSA	 as	 the	 only	 systems	 suitable	 for	 use	with	CGib 	 oilers	(all3” 	 	diameter): ® •	 Heat-Fab, I 	 nc. 	 Saf-T Vent •	 Flex-L	International, I 	 nc. 	 StaR-34 •	 Z-Flex®, I 	 nc. 	 Z-Vent II •	 ProTechS 	 ystems	 FasNSeal™ 	 Use	 only	 the	 vent
                    
                    Краткое содержание страницы № 16 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 3d Venting — direct exhaust — vent starter 1.	 Select	 a	 vent	 pipe	 manufacturer	 and	 obtain	 all	 vent	 3.	 Follow 	 all	 applicable	 national,	 state,	 local	 or	 provin- components	 needed,	 based	 on	 boiler	 location	 and	 cial	codesw 	 hen	venting	the	CGib 	 oiler. venting	method. 4.	 Connect 	 vent	 starter	 to	 blower	 housing	 outlet	 as	 .	 You	 must	 use	 the	 vent	 starter	 made	 by	 the	 vent	 pipe	 shown	inthe 	 	 Figures 8thr 	 o
                    
                    Краткое содержание страницы № 17 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 3e Venting — direct exhaust — termination 	 Follow 	 instructions	 on	 this	 page	 1.	Canadian 	 installations	 —	 See	 B149.1	 or	 B149.	 when	 determining	 vent	 location	 to	 Installation	 Code.	 Terminate	 vent	 no	 less	 than	 6	 avoid	 possibility	 of	 severe	 personal	 feet	 from	 another	 combustion	 air	 inlet,	 3	 feet	 from	 injury,	 death	 or	 substantial	 property	 any	 other	 building	 opening,	 and	 3	 feet	 from	 any	 gas	 damage.
                    
                    Краткое содержание страницы № 18 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 3f Venting — direct exhaust — installation 1.	 Do	 not	 mix	 types	 or	 manufacturers	 of	 vent	 materi- Figure 13 Direct exhaust vertical venting als. .  	 Clean 	 all	 joints	 before	 sealing.	 See	 vent	 manufactur- er’s	 instructions	 for	 cleaning	 and	 sealing	 joints.	 Use	 their	specified	sealant. 	Do	not	use	screws. 3.	 Install 	 vent	 pipe	 with	 seams	 on	 top	 of	 vent	 horizon- tal	 runs.	 Follow	 requirements	 in	 Section	 3e	 for	 v
                    
                    Краткое содержание страницы № 19 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 3f Venting — direct exhaust — installation (cont.) 	 Using	 any	 termination	 other	 than	 one	 of	 those	 shown	 Figure 15 Sidewall termination could	 cause	 nuisance	 outages	 and	 loss	 of	 heat,	 resulting	 ins 	 ubstantial	propertydamag 	 e. 19 Part Number 550-110-710/0107                                                                                                                                                                              
                    
                    Краткое содержание страницы № 20 
                    
                        GOLD CGi Gas-Fired Water Boiler — Boiler Manual 4a Water piping — general information Generalpiping 	 information 	 Circulator If	 installation	 is	 to	 comply	 with	 ASME	 or	 Canadian	 requirements,	 an	 ad- The	 circulator	 is	 shipped	 loose	 (wiring	 pre-attached	 to	 ditional	 high temperature limit	 is	 needed.	 Install	 control	 in	 supply	 piping	 boiler)	 to	 allow	 you	 to	 locate	 it	 either	 in	 the	 return	 or	 between	 boiler	 and	 isolation	 valve.	 Set	 second	 control	 to	 mini