Muon Liquid Handling System 
User Guide 
 
 
 
 
C. Johnson, S.P. Cottrell et al 
Version 0.2 
 
 
 
 
 
 
 
 
 
 
 
 
 - 1 -                                                                                                                                                                                                                                                                                                                                                                                   
                    
                    Inhaltszusammenfassung zur Seite Nr. 2 
                    
                          Contents    1 Getting Started        3    1.1  Layout of the liquid handling system     3  1.2  Layout of the in situ sample stick     4  1.3  Layout of the pump       4    2 General procedures        6    2.1  Sample loading        6  2.1.1 Loading Vessel 1      6  2.1.2 Loading Vessel 2      6  2.2  Evacuation of the system       6  2.2.1 Removing air from Vessel 1     7  2.2.2 Removing air from Vessel 2     7  2.2.3 Removing air from Vessel 3     7  2.2.4 Evacuation of the sample cell     7
                    
                    Inhaltszusammenfassung zur Seite Nr. 3 
                    
                        1 Getting Started    This manual describes the liquid handling system and the in situ sample cell as used  on the DEVA instrument with the “RF” spectrometer, for either normal muon spins  relaxation or RF resonance experiments.    1.1 Layout of the liquid handling system    The Muon Liquid Handling System has been designed to facilitate the in situ  degassing and transfer of samples into and out of the sample cell.  The main features  of the liquid handling system are shown in Figure 1.      Inl
                    
                    Inhaltszusammenfassung zur Seite Nr. 4 
                    
                        1.2 Layout of the in situ sample stick    The liquid sample stick is designed to fit into the DEVA flow cryostat, details of  which can be found in the DEVA manual.  It consists of a shapol target cell 30 mm x  30 mm with a mylar window upon which may be mounted an RF coil.  Two stainless  steel capillaries provide a means of flowing liquid into and out of the cell along with  feed throughs for an RF excitation signal and a pick-up coil.        Figure 2  The liquid-sample cell mounted on a sampl
                    
                    Inhaltszusammenfassung zur Seite Nr. 5 
                    
                        Roughing/ Turbo  Off/Run  switch  switch  Pressure  reading  Turbo  control panel  Turbo  Pump  Rotary  Pump      Figure 2  The layout of the front panel on the vacuum pump used with the muon liquid handling  system.          - 5 -                                                                                                                                                                                                                                                                             
                    
                    Inhaltszusammenfassung zur Seite Nr. 6 
                    
                        2 General procedures    2.1 Sample loading    At this point, the system will be open to the atmosphere, ensure that valve V2 is  closed to prevent air condensation in the cold trap.    2.1.1 Loading Vessel 1    • Open the tap on the right-hand side of Vessel 1.  • Open tap A and valve V11.  • The liquid should be poured into the system very slowly to avoid liquid  leaving the vessel via the side tap.  • When loading is complete, close the side tap, tap A and valve V11.    2.1.2 Loading Vessel 2 
                    
                    Inhaltszusammenfassung zur Seite Nr. 7 
                    
                        2.2.1 Removing air from Vessel 1    Once the system has been pressurised, tap A on Vessel 1 can be opened.  It is possible  to bubbled helium gas through the sample liquid against the non-return valve, V13.  If  this is required, first ensure that valves V5, V7 and V8 are closed.   Open valves V10  and V6, finally opening tap B slowly in order to regulate the flow.    To fully evacuate the system and Vessel 1, the sample liquid must be frozen by  raising a dewar of liquid nitrogen around it.  Wh
                    
                    Inhaltszusammenfassung zur Seite Nr. 8 
                    
                        2.3 Freeze-Pump-Thaw cycle    Using this system it is possible to operate freeze-pump-thaw cycles on sample liquids  held in any of the three vessels.  Procedures appropriate to each vessel are outlined  below.    2.3.1 Sample in Vessel 1    • All taps and valves should be closed.   • Open valve V2 and tap A on Vessel 1, and freeze the sample liquid by slowly  raising a dewar of liquid nitrogen around it.  • When it has been determined that the liquid has completely frozen switch the  pump to ro
                    
                    Inhaltszusammenfassung zur Seite Nr. 9 
                    
                        2.3.3 Sample in Vessel 3    • All taps and valves should be closed.   • Open valves V2 and V3 along with tap C on Vessel 3 and freeze the sample  liquid by slowly raising a dewar of liquid nitrogen around it.  • When it has been determined that the liquid has completely frozen switch the  pump to roughing mode and open valve V1.  • Switch the pump to turbo mode and leave for several minutes.  The pressure  within the system can be read from the baratron gauge on the pump.  • When sufficient pump
                    
                    Inhaltszusammenfassung zur Seite Nr. 10 
                    
                        2.4.2 Vessel 3 to sample cell    The transfer of liquid from Vessel 3 to the sample cell is brought about by the  difference in pressure between that in the Vessel and a vacuum in the cell.  However,  in order to control the transfer of liquid the pressure difference should be as small as  possible but not so low that the liquid starts to boil.    • Switch the pump to its roughing mode.  • Open values V2 and V3 along with tap C and carefully open valve V1 until a  suitable pressure is obtained (
                    
                    Inhaltszusammenfassung zur Seite Nr. 11 
                    
                        2.4.4 Recovery of liquid in sample cell to Vessel 1    The liquid in the sample cell cannot be recovered to Vessel 1 using the liquid  handling rig as presently configured.    2.4.5 Recovery of liquid in sample cell to Vessel 2    The liquid in the sample cell can be recovered to Vessel 2 using the following  procedure.    • Vessel 2 should be under vacuum along with the manifold between valves V5  and V6 prior to the recovery of the liquid from the sample cell.  If it is not,  switch the pump t
                    
                    Inhaltszusammenfassung zur Seite Nr. 12 
                    
                        • All the liquid may not return in a single pass and repeating the evacuation  procedure may be required.  However, some liquid may be present in the  system and care should be taken during evacuation that the trap does not  become blocked.  The liquid may also be encouraged to leave the sample cell  by using a small amount of gas.  • Close valve V3 and open valve V10 to allow helium gas into the lower part of  the system.  Close valve V10 and carefully open valve V5 to allow the gas to  pass th
                    
                    Inhaltszusammenfassung zur Seite Nr. 13 
                    
                        3 Example Experiment    The paramagnetic signal in liquid n-hexane is difficult to observe because the  muonium polarisation is found to decay on a microsecond time scale, which is further  reduced by the presence of dissolved oxygen.  A series of commissioning experiments  were carried out using n-hexane in order to gauge the ability of the liquid handling rig  to degas the liquid.    This experiment was carried out using a detachable liquid-sample cell.    At the start of the experiment, 100 m
                    
                    Inhaltszusammenfassung zur Seite Nr. 14 
                    
                        13.5 13.0 a) b)  13.0 12.5 12.5 12.0 12.0 11.5 11.5 11.0 11.0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Time (µs) Time (µs) c)  13.5 13.0 12.5 12.0 11.5 11.0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Time (µs)   Figure 1 Muonium precession signal at 2G in n-hexane after a) 4, b) 7 and c) 10 freeze- pump-thaw cycles.      For the second experiment, all of the n-hexane used in the first experiment was  recovered into a sample bottle and dried using a small piece of clean sodium.  The  liquid was c