Inhaltszusammenfassung zur Seite Nr. 1
81139
Issue 3
USERS INSTRUCTIONS
THIS CAT I2H APPLIANCE IS FOR USE
ON NATURAL GAS G20 AT A SUPPLY
PRESSURE OF 20 mbar GB and IE
HAND THESE INSTRUCTIONS TO THE USER
Inhaltszusammenfassung zur Seite Nr. 2
DESCRIPTION The Royal Cheltenham glass fronted high efficiency live fuel effect inset gas fire has been developed from the successful Royal Cozyfires LFE using much of the technology and components used in the manufacture of this appliance. The fuel bed has a realistic coal effect utilizing ceramic ‘coals’ and coal bed that allows secondary air to be entrained into the bed for clean combustion. The burner is an aerated twin ported steel burner running parallel across the front of the fire. The
Inhaltszusammenfassung zur Seite Nr. 3
TECHNICAL DATA Heats Input Rates: High Setting 5.42 kW 18,500 Btu/h (Gross) Low Setting 2.34 kW 8,000 Btu/h This fire will run for 5.4 hours on one therm of gas on high setting. LOCATION OF COMBUSTIBLE SHELVES ABOVE FIRE SIDE OF FIRE Min. Height of 150mm deep shelf Min. Dimension from outer edge of fire above hearth = 830mm to a combustible surface of 150mm depth is 100mm. When the shelf depth is increased by increments of 12.5mm, add 25mm to the height above fire. TO LIGHT APPLIANCE (see Fi
Inhaltszusammenfassung zur Seite Nr. 4
DISMANTLING THE FIRE BED FOR CLEANING (see fig.3, 4 & 5) Allow the appliance to cool for 1 hour before handling any components. Remove the controls cover and unscrew the two wing screws securing the canopy in place as shown in (fig 3). Lift the canopy off the appliance and place to one side. Support the glass panel and remove the four wing screws securing the glass panel and retaining plate in position and lift clear of the L & R hand corner retaining brackets and upwards clear of the side plate
Inhaltszusammenfassung zur Seite Nr. 5
COAL LAYING INSTRUCTIONS Lay the four front coals diagonally with the stepped corner sitting on the simulated coal front and the small corner notch at the rear. Lay a further row of four coals behind the front row with stepped corners in the rear corners of the front row, the two centre coals having notches in the rear top corners. Lay two more coals in the notches of the centre two coals. See Fig 5. Lay the three small coals on the top L&R corners and in the centre of the back row. Page 5
Inhaltszusammenfassung zur Seite Nr. 6
Note: Should any ‘coals’ or the coal bed become damaged, lost or broken, only the correct replacements must be obtained and fitted before the appliance is used. Extra ‘coals’ etc. must not be added to the coal bed. The coal bed must always be assembled as detailed. This appliance is fitted with an Oxy/pilot the purpose of which is to monitor spillage in the event of a flue blockage or hazardous flue condition. This may cause the oxygen content of the room to become depleted; the flame then bec
Inhaltszusammenfassung zur Seite Nr. 7
REGISTRATION RECORD Purchaser’s Name __________________________________________________ and Address __________________________________________________ __________________________________________________ Supplier’s Name __________________________________________________ and Address __________________________________________________ _________________________________________________ Installer’s name __________________________________________________ and Add
Inhaltszusammenfassung zur Seite Nr. 8
81140 Issue 3 INSTALLATION AND SERVICING INSTRUCTIONS 2H THIS CAT I APPLIANCE IS FOR USE ON NATURAL GAS G20 AT A SUPPLY PRESSURE OF 20 mbar GB and IE HAND THESE INSTRUCTIONS TO THE USER
Inhaltszusammenfassung zur Seite Nr. 9
DESCRIPTION The Royal Cheltenham glass fronted high efficiency live fuel effect inset gas fire has been developed from the successful Royal Cozyfires. The fuel bed has a realistic coal effect utilising ceramic ‘coals’ and coal bed that allows secondary air to be entrained into the bed for clean combustion, the burner is an aerated twin ported steel burner running parallel across the front of the fire. A gas control with a variable high to low setting with a separate piezo igniter is used to ign
Inhaltszusammenfassung zur Seite Nr. 10
INSTALLATION REGULATIONS AND REQUIREMENTS In the interests of both the Law and of Safety, this appliance must only be installed by a competent person in accordance with the current Gas Safety (Installation and Use) Regulations or the rules in force and the manufacturer’s instructions. Note: Failure to install a gas appliance correctly could lead to prosecution. The following are the relevant Codes of Practice and British Standards. The Building Regulations issued by the Department of the Enviro
Inhaltszusammenfassung zur Seite Nr. 11
Clearance to side (timber surrounds etc.) Minimum clearance required to any combustible material to the side of the appliance must be 150mm. Clearance to shelves. Minimum clearances to undersides of a 150mm deep combustible shelf from the hearth must be 830mm. Add 12.5mm to this clearance for every 25mm increase in depth of shelf. Page 4
Inhaltszusammenfassung zur Seite Nr. 12
Page 5
Inhaltszusammenfassung zur Seite Nr. 13
INSTALLATION USING A 5" DIAMETER METAL FLUE BOX Important: The Flue restrictor plate must be removed see Fig 10. When the metal flue box is to be built-in as a false chimneybreast using timber stud work with plasterboard facing, the flue box should be enveloped with insulation material such as rockwool or similar to prevent a build up of heat within the structure. An air gap of 75mm should be maintained between any combustible materials and any part of the flue box or 25mm of insulation betwee
Inhaltszusammenfassung zur Seite Nr. 14
INSTALLATION OF THE APPLIANCE Check that the chimney conforms to the required specifications as previously stated. Examine the condition and carry out any remedial work, if the flue has been used for solid fuel it should be swept and a smoke test carried out to check that satisfactory smoke clearance has been established. If all the smoke is not drawn into the flue, pre-heat the flue with a blowtorch or similar and re-check. If there is any uncertainty examine for the cause and if necessary see
Inhaltszusammenfassung zur Seite Nr. 15
Page 7 a (ii) If the spacer frame is to be used, attach the frame to the rear of the appliance using either the screws and captive nuts removed from the appliance or supplied in the fixing kit, see fig 8. Place the fire in the required position; mark around the perimeter of the spacer frame remove the appliance and the spacer frame from the appliance. Position the spacer frame to line up with the markings, spot and drill through the wall fixing holes in the positions shown in fig 7, and secure
Inhaltszusammenfassung zur Seite Nr. 16
Page 8
Inhaltszusammenfassung zur Seite Nr. 17
Page 9
Inhaltszusammenfassung zur Seite Nr. 18
Page 10
Inhaltszusammenfassung zur Seite Nr. 19
Page 11
Inhaltszusammenfassung zur Seite Nr. 20
Page 12