Crown Boiler 32 user manual

User manual for the device Crown Boiler 32

Device: Crown Boiler 32
Category: Boiler
Manufacturer: Crown Boiler
Size: 4.17 MB
Added : 11/3/2014
Number of pages: 71
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Crown Boiler 32. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Crown Boiler 32.

For your convenience

If looking through the Crown Boiler 32 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Crown Boiler 32 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Crown Boiler 32 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Crown Boiler 32 User manual - Online PDF
Advertisement
« Page 1 of 71 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Crown Boiler 32 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Crown Boiler 32. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

D E S I G N E D T O L E A D
Series 32
Gas-Fired Natural Draft Steam or Water Boilers
INSTALLATION AND OPERATING INSTRUCTIONS
These instructions must be affixed on or adjacent to the boiler.
WARNING: Improper installation,
adjustment, alteration, service or
maintenance can cause property
damage, injury, or loss of life. For
assistance or additional information,
consult a qualified installer, service
agency or the gas supplier. Read
these instructio

Summary of the content on the page No. 2

2

Summary of the content on the page No. 3

Table of Contents I. Product Description 1 II. Specifications 2 III. Before Installing 7 IV. Locating the Boiler 7 V. Knockdown Boiler Assembly Instructions 10 VI. Air for Combustion & Ventilation 19 VII. Venting 23 VIII. Steam Boiler Piping & Trim Installation 27 A. Heating System Piping 27 B. Indirect Water Heater Piping 36 IX. Water Boiler Piping 37 A. Heating System Piping 37 B. Tankless Heater Piping 42 X. Gas Piping 44 XI. Control System Wiring 45 A. Standard Steam / Water 45 B. CSD-1 Stea

Summary of the content on the page No. 4

II Specifications 4 2 Figure 1: Base Model - General Configuration

Summary of the content on the page No. 5

5 3 Jacket Top Supply Flue Outlet Drafthood Size & Location Overall Location No. & Size Boiler Model Length Number 'B' 'C' 'D' 'E' 'F' 'G' 'A' 'H' 'J' 'K' 'L' 'M' 'N' 'P' 'R' 'S' 'T' 'U' 10" 12" Dia. Dia. Dia. Dia. Dia. Dia. 32-475W(S)N 36 3/4 12 ----- ----- 18 3/8 27 3/16 ---- - 1 32-570W(S)N 42 1/4 10 10 ---- 16 5/16 ---- 12 15/16 32 5/8 ---- 2 - 32-665W(S)N 47 5/8 10 12 ---- 19 1/16 ---- 15 11/16 38 1/16 ---- 1 1 32-760W(

Summary of the content on the page No. 6

NATURAL GAS ONLY WATER WATER NUMBER I=B=R NET RATING BHP BASIC BOILER HEAT ING VOL. VOL. OF INPUT Combustion 1 2 OUTPUT MODEL CAPACIT Y Steam Water 3 SECTIONS Effy. % (MBH) (MBH) (Sq. ft) (MBH) (MBH) (Gal) (Gal) 32-475W(S)N 6 475 380 1188 285 330 80-1/2 28.58 39.80 11.4 32-570W(S)N 7 570 456 1425 342 397 80-1/2 32.65 45.47 13.6 32-665W(S)N 8 665 532 1663 399 463 80-1/2 36.72 51.14 15.9 32-760W(S)N 9 760 608 1900 456 529 80-1/2 40.79 56.81 18.2 32-855W(S)N 10 855 684 2138 513 595 80-1/2

Summary of the content on the page No. 7

7 5 Figure 2a: Series 32 Steam Boilers - Arrangement Of Steam Riser Connections, Draft Hoods And Base Assemblies

Summary of the content on the page No. 8

8 6 Figure 2b: Series 32 Water Boilers - Arrangement Of Water Supply Connections, Draft Hoods And Base Assemblies

Summary of the content on the page No. 9

III Before Installing 1) Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict accordance with this manual and the requirements of the authority having jurisdiction. • In the absence of an authority having jurisdiction, installation must be in accordance with this manual and the latest edition of the National Fuel Gas Code, ANSI Z223.1. • Where required by the authority having jurisdiction, this installation must conform to the latest e

Summary of the content on the page No. 10

Over All Minimum Over All Over All Height Boiler Boiler Room Length Depth Floor To Volume Model Volume Jacket Jacket Top Of (Ft3) (Ft3) Jacket 32-475 36 3/4 32 1/4 46 5/8 32.0 511.7 32-570 42 1/4 32 1/4 46 5/8 36.7 587.4 32-665 47 5/8 32 1/4 46 5/8 41.4 663.1 32-760 53 1/8 32 1/4 46 5/8 46.2 738.8 32-855 58 1/2 32 1/4 46 5/8 50.9 814.5 32-950 64 32 1/4 46 5/8 55.6 890.2 32-1045 69 3/8 32 1/4 46 5/8 60.4 965.9 32-1140 74 7/8 32 1/4 46 5/8 65.1 1041.6 32-1235 80 1/4 32 1/4 46 5/8 6

Summary of the content on the page No. 11

Minimum Clearance - Jacket Clearances Required For Removal Of Tankless Heater Service Clearance To Non- To Combustible Or Non- Combustible Construction T-1 T-2 T-3 Combustible Construction Left Side 24" 18" (Controls) 27" 32" 42" Right Side 24" 18" (Controls) 27" 32" 42" Front 24" 36" (Cleaning-Burner Removal) -------- -------- -------- Rear 24" 36" (Cleaning) -------- -------- -------- Top 24" --------------------- -------- -------- -------- Table 3: Minimum Clearances to Combustibles 6) The

Summary of the content on the page No. 12

V Knockdown Boiler Assembly Instructions A. Prior To Assembly 1) Thoroughly inspect the cast iron heat exchanger sections for any shipping damage, i.e. cracks in the castings, broken lugs or punctures due to mishandling. 2) Do not use a damaged heat exchanger section. Replace it with an undamaged heat exchanger section. 3) Keep the base in the shipping carton until it is time to perform the assembly. This keeps foreign material from contami- nating the burners or creating other hazards. Do

Summary of the content on the page No. 13

13 11 Figure 4: Multiple Base Assembly

Summary of the content on the page No. 14

C. Section Assembly 1) Clean the boiler sections inside and out to remove dirt due to shipping and handling. 2) Clean all nipples and nipple ports with kerosene immediately prior to section assembly. 3) Set the left end section on the base so that the locating lugs on the bottom of the section go inside the front and rear base panels. Left end sections are identified by “LEH” cast on the section. Right end sections are identified by “REH” cast on the section. 4) Apply the Loctite 592 lubricant/s

Summary of the content on the page No. 15

Figure 5: Use Of Nipple Gauge Figure 6: Assembly Of Sections 13 15

Summary of the content on the page No. 16

14) Install the tankless coil/s and/or cover plates using the gaskets and 3/8 x 7/8 bolts and washers provided (see Figure 7). 15) Test assembled block for leaks. Unless local codes have other requirements, use the following procedure: a) Run a hose from the water service to one of the lower tappings. Install a ball or gate valve in one of the tappings on the top of the block and connect the other end of this valve to a drain. Install a gauge in any other convenient tapping. Plug all remaining u

Summary of the content on the page No. 17

NOTE Installation of the draft hoods will be easier if one person supports the rear of the hood while another installs the carriage bolts, nuts and washers. 6) Hang a rear tie rod channel bracket on the 4" stud installed in the left end section (Figure 12a). 7) Facing the rear of the boiler, find the square mounting holes underneath the draft hood. Drop a 5/16 x 5" carriage bolt through this hole and through the hole in the rear tie rod channel bracket. Loosely secure with a wing nut and washer

Summary of the content on the page No. 18

Figure 11: Front Attachment Of Draft Hood Figure 12a: Mounting Rear Tie Rod Channel Bracket Figure 12b: Rear Attachment Of Draft Hood 18 16

Summary of the content on the page No. 19

D. Jacket Assembly Instructions NOTE Before installing the jacket, make sure to plug any tappings which are not going to be used. Also make sure that no tappings are plugged which will be needed later for piping the boiler. See Sections VIII and IX for piping and trim installation. 1) On the left and right side base panels attach the jacket side panel zee bracket and the jacket top support bracket end angle with #10 x 1/2” sheet metal screws as shown in Figure 13. 2) Jacket top support bracket

Summary of the content on the page No. 20

20 18 Figure 14: Exploded View Of Jacket Assembly


Alternative user manuals
# User manual Category Download
1 Crown Boiler 24-03 User manual Boiler 0
2 Crown Boiler 24-08 User manual Boiler 0
3 Crown Boiler 24-06 User manual Boiler 0
4 Crown Boiler 24-09 User manual Boiler 0
5 Crown Boiler 24-07 User manual Boiler 0
6 Crown Boiler 24-11 User manual Boiler 0
7 Crown Boiler 24-05 User manual Boiler 0
8 Crown Boiler 24-10 User manual Boiler 0
9 Crown Boiler 32-475ECS User manual Boiler 0
10 Crown Boiler 24-12 User manual Boiler 0
11 Crown Boiler 32-380ECS User manual Boiler 0
12 Crown Boiler 50-003 User manual Boiler 0
13 Crown Boiler 24-04 User manual Boiler 0
14 Crown Boiler ABF-EID User manual Boiler 0
15 Crown Boiler AWI037 User manual Boiler 0
16 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
17 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
18 A.O. Smith 200 User manual Boiler 2
19 A.O. Smith 201 User manual Boiler 7
20 A.O. Smith 750 & 1000 User manual Boiler 6